L BAR A (CONT.
TOP BARS)
L/4 L/4
BAR C (EXTRA TOP BARS
@ SUPPORT
BAR A (CONT. TOP BARS) BAR C
b
d FA1C1
BAR D FB1C1 FC1C1
17-20mmØ
11-20mmØ
4-20mmØ
1.25 1.45
SECTION BAR B (CONT. BOT. BARS) 1.10
L/5 BAR D (EXTRA BOT. BARS) L/5 4-20mmØ 6-20mmØ 9-20mmØ
@ MID SPAN LEFT AND RIGHT MID 1.10 2.50 2.90
BAR B (CONT. BOT. BARS) SUPPORT SUPPORT
"A" - 10mm Ø, 7@0.10mm,
rest @ 0.15 FC2C1 FD2C1 FD1C1
SCHEDULE OF BEAMS
19-20mmØ 18-20mmØ
SIZE REINFORCEMENT
8-20mmØ
MARK
b (mm) d (mm)
1.55
BAR A BAR B BAR C BAR D STIRRUPS
19-20mmØ
SECOND FLOOR
8-20mmØ
9-20mmØ
2-20Ø 2-20Ø 1-20Ø 1-20Ø
2.85 3.05
2B-1 260 520 A
2B-2 250 500 2-20Ø 2-20Ø 1-20Ø 1-20Ø A
1.55
THIRD FLOOR
3B-1 260 520 2-20Ø 2-20Ø 1-20Ø 1-20Ø A
3B-2 250 500 2-20Ø 2-20Ø 1-20Ø 1-20Ø A
ROOF DECK 2.85
RDB-1 260 520 2-20Ø 2-20Ø 1-20Ø 1-20Ø A 1.53
RDB-2 250 500 2-20Ø 2-20Ø 1-20Ø 1-20Ø A
4 SCHEDULES OF BEAMS FA2C1 FB2C1
ST 8-20mmØ 13-20mmØ
FD3C1
10-20mmØ
4-20mmØ
13-20mmØ
10-20mmØ
2.10
2.45 1.70
LL (LONG SPAN)
LL (LONG SPAN)
LL/4 LL /4
LL/4 LL /4
COLUMN COLUMN
COLUMN COLUMN
STRIP STRIP
STRIP STRIP
BAR B, CONTINUOUS BOTTOM BARS
BAR B, CONTINUOUS BOTTOM BARS 1.05 1.70
ALONG SHORT SPAN (PROVIDED ALL
ALONG SHORT SPAN (PROVIDED
THROUGH OUT LS)
ALL THROUGH OUT LS) 2.45
COLUMN
COLUMN
STRIP
LS /4
STRIP
LS /4
BAR A, CONTINUOUS BOTTOM BARS
BAR A, CONTINUOUS BOTTOM BARS
ALONG LONG SPAN (PROVIDED ALL
ALONG LONG SPAN (PROVIDED ALL
THROUGH OUT LL)
THROUGH OUT LL)
LS (SHORT SPAN)
LS (SHORT SPAN)
BAR D, TOP BARS @ COLUMN STRIP
BAR D, TOP BARS @ (CUT @ LS / 4)
ALONG SHORT SPAN (CUT @ LS / 4)
COLUMN STRIP
ALONG SHORT SPAN
BAR E, CONTINUOUS TOP BARS @
BAR E, CONTINUOUS TOP BARS @
COLUMN STRIP ALONG LONG SPAN
COLUMN STRIP ALONG LONG
SPAN
FC3C1
FAB3C1
COLUMN
BAR C, TOP BARS @ (CUT @ LL / 4)
COLUMN
STRIP
LS /4
COLUMN STRIP 11-20mmØ
STRIP
LS /4
ALONG LONG SPAN 9-20mmØ
22-20mmØ
22-20mmØ
BAR F, CONTINUOUS TOP BARS @
COLUMN STRIP ALONG SHORT
1.43 1.63
SPAN
TYPICAL TWO-WAY SLAB DETAIL TYPICAL ONE-WAY SLAB DETAIL 4.10 3.26
SCHEDULE OF SLAB
SPACING NOTES:
MARK
THICKNESS Ø REBAR
BOTTOM BARS (mm) TOP BARS (mm) 1. "S - 2" MARK IS A TWO-WAY SLAB
2. "S - 1" MARK IS ONE-WAY SLAB
4 SCHEDULES OF FOOTINGS
(mm) (mm)
S-1 100 10
BAR A
350
BAR B
350
BAR C
---
BAR D
150
BAR E
100
BAR F
---
3. BAR B IS ON TOP OF BAR A
4. BAR D IS ON TOP OF BAR E
5. BAR C IS ON TOP OF BAR F
ST
S-2 100 10 350 350 150 150 100 100
4 SCHEDULES OF SLABS
ST
GROUP NO. 4 PROJECT TITLE: PROJECT OWNER: SHEET CONTENT: DESIGNED BY: BSCE - 3F SHEET NO:
CAMAYAR, OMAR P. PROPOSED THREE STOREY TARLAC STATE UNIVERSITY DRAWN BY: GROUP 4
DUPITAS, MARK JAMES U.
SCHEDULES OF BEAMS
GORDOVIN, JOHN KENNETH COMMERCIAL BUILDING COLLEGE OF ENGINEERING AND TECHNOLOGY SCHEDULES OF SLABS
SCHEDULES OF FOOTINGS
CHECKED BY: ENGR. ORLANDO C. SICO JR. ST - 4
OFOOB, SERENE THARA C. DATE: 09 - 23 - 2020
LOCATION: BRGY. SAN JOSE DE URQUICO, BLK 4 INSTRUCTOR: ENGR. ORLANDO C. SICO JR.