0% found this document useful (0 votes)
157 views1 page

FPSO Sangomar External Turret: Sangom Ar Field - Senagal

The document provides details about the FPSO Sangomar external turret project in Senegal including: - SOFEC will design, construct, and fabricate an external turret for the Sangomar FPSO located 100km off the coast of Dakar, Senegal, with first oil planned for 2023. - The 282,000 DWT FPSO will be permanently moored in 780m of water and capable of processing 100,000 bbls/day of oil. - The SOFEC external turret mooring system will utilize a 3x3 suction pile foundation and be ABS classed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
157 views1 page

FPSO Sangomar External Turret: Sangom Ar Field - Senagal

The document provides details about the FPSO Sangomar external turret project in Senegal including: - SOFEC will design, construct, and fabricate an external turret for the Sangomar FPSO located 100km off the coast of Dakar, Senegal, with first oil planned for 2023. - The 282,000 DWT FPSO will be permanently moored in 780m of water and capable of processing 100,000 bbls/day of oil. - The SOFEC external turret mooring system will utilize a 3x3 suction pile foundation and be ABS classed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

S A NGOM A R FIEL D - SEN AG A L :

FPSO Sangomar
External Turret

Under •
Construction

Scope of Work Installation Date: Planned for 2023


SOFEC will design, construct, and fabricate an external turret for the First Oil: Planned for 2023
Sangomar (formerly SNE) Field Development Phase 1 project located Vessel Size: 282,000 dwt
in the Sangomar Offshore and Sangomar Offshore Deep oil blocks, Storage Capacity: 1,300,000 bbls
located offshore Senegal. Water Depth: 780 m (2,558ft)
Fabrication: Turret - TBD
The FPSO will be deployed at the Sangomar field located Topsides - TBD
approximately 100 kilometers south of Dakar, Senegal. The Sangomar Vessel - TBD
Field Development is expected to be Senegal's first offshore oil
development. Scheduled for delivery in early 2023, the FPSO vessel Design Environmental Criteria (100-year storm)
will be permanently moored at a water depth of approximately 780 Sig. Wave Height: 6.9 m (22.6 ft)
meters. Wind Velocity: 19.5 m/s (38 kts)
Current: 1.16 m/s (2.3 kts)
The FPSO will be capable of processing 100,000 barrels of crude
oil per day, 130 million standard cubic feet of gas per day, 145,000 Mooring System
barrels of water injection per day and will have minimum storage 3x3 mooring legs with suction piles
capacity of 1,300,000 barrels of crude oil.
Fluid Swivel Assembly
TBD
The SOFEC external turret mooring system will be ABS classed.

General Description Riser System


Fifteen risers and umbilicals
Client Name: Woodside Energy