S A NGOM A R FIEL D - SEN AG A L :
FPSO Sangomar
External Turret
Under •
Construction
Scope of Work Installation Date: Planned for 2023
SOFEC will design, construct, and fabricate an external turret for the First Oil: Planned for 2023
Sangomar (formerly SNE) Field Development Phase 1 project located Vessel Size: 282,000 dwt
in the Sangomar Offshore and Sangomar Offshore Deep oil blocks, Storage Capacity: 1,300,000 bbls
located offshore Senegal. Water Depth: 780 m (2,558ft)
Fabrication: Turret - TBD
The FPSO will be deployed at the Sangomar field located Topsides - TBD
approximately 100 kilometers south of Dakar, Senegal. The Sangomar Vessel - TBD
Field Development is expected to be Senegal's first offshore oil
development. Scheduled for delivery in early 2023, the FPSO vessel Design Environmental Criteria (100-year storm)
will be permanently moored at a water depth of approximately 780 Sig. Wave Height: 6.9 m (22.6 ft)
meters. Wind Velocity: 19.5 m/s (38 kts)
Current: 1.16 m/s (2.3 kts)
The FPSO will be capable of processing 100,000 barrels of crude
oil per day, 130 million standard cubic feet of gas per day, 145,000 Mooring System
barrels of water injection per day and will have minimum storage 3x3 mooring legs with suction piles
capacity of 1,300,000 barrels of crude oil.
Fluid Swivel Assembly
TBD
The SOFEC external turret mooring system will be ABS classed.
General Description Riser System
Fifteen risers and umbilicals
Client Name: Woodside Energy
Contract Award: December 2019