0% found this document useful (0 votes)
652 views2 pages

Certificate of Completion: (Electrical Works)

This certificate certifies that the electrical installation at a construction project located in Quezon City has been completed according to approved plans and complies with electrical codes. The installation includes wiring, transformers, generators, and meters with a total connected load of [NUMBER] kVA. An electrical professional and the owner or representative have confirmed the completion and readiness for inspection.

Uploaded by

Rolando Villas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
652 views2 pages

Certificate of Completion: (Electrical Works)

This certificate certifies that the electrical installation at a construction project located in Quezon City has been completed according to approved plans and complies with electrical codes. The installation includes wiring, transformers, generators, and meters with a total connected load of [NUMBER] kVA. An electrical professional and the owner or representative have confirmed the completion and readiness for inspection.

Uploaded by

Rolando Villas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

Quezon City
DEPARTMENT OF THE BUILDING OFFICIAL

CERTIFICATE OF COMPLETION
(ELECTRICAL WORKS)

This is to certify that the electrical installation/works of the building covered by Building Permit No. ________________
issued on _______________ has been completed in accordance with the approved plans and specifications on file with the
Department of the Building Official in accordance with Philippine Electrical Code Provisions, the National Building Code (P.D. 1096)
and its implementing rules and regulations, and that the said installation/works is ready for final inspection.

NAME OF OWNER:
PROJECT TITLE:
LOCATION OF CONSTRUCTION:

USE OR CHARACTER OF OCCUPANCY:


TOTAL LOAD CONNECTED: KVA.
TOTAL TRANSFORMER CAPACITY: KVA.
TOTAL GENERATOR/UPS CAPACITY: KVA.
TYPE OF INSTALLATION: TEMPORARY NEW REMODEL/ALTERATION
SEPARATION OF METER OTHERS (SPECIFY): _____________________________
TYPE/S OF WIRING: OPEN WIRING CONDUIT CABLE ARMORED CABLE
RACEWAY OTHERS (SPECIFY): _____________________________
VOLTAGE: PHASE:
NO. & SIZE OF WIRE/PHASE:
SIZE OF GROUNDING WIRE:
RATING OF MAIN CIRCUIT BREAKER:
NO. OF METER/S: NO. OF SUB METER/S:

CONFORME:

Affiant (PEE/REE/RME) Owner / Applicant


PRC NO. or Authorized Representative
(Print Name and Signed Above)
PTR NO.
Issued on:
Issued at
TIN

SUBSCRIBED AND SWORN to before me this ________ day of _________________20_______


at________________, with the affiants exhibiting to me their respective identification cards above stated as proof of their
personal identities.

Doc. No. __________


Book No. __________
Page No. __________
Series No. __________
Notary Public

You might also like