Junction at 27.600

This document contains design specifications for a road curve, including the design speed of 100 km/hr, a superelevation rate of 5%, a delta angle of 0 degrees 58 minutes 03 seconds, and a curve length of 27+600 meters. The design shows the vertical and horizontal alignments relative to existing ground levels.

Uploaded by

Er navneet jassi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

Junction at 27.600

This document contains design specifications for a road curve, including the design speed of 100 km/hr, a superelevation rate of 5%, a delta angle of 0 degrees 58 minutes 03 seconds, and a curve length of 27+600 meters. The design shows the vertical and horizontal alignments relative to existing ground levels.

Uploaded by

Er navneet jassi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ROW

PC

ROW
SUPERELEVATION (e %)

FINISHED ROAD LEVEL.


GROUND LEVEL
EXISTING ROAD /
VERTICAL ALIGNMENT

HORIZONTAL ALIGNMENT
SCALE:
DATE:

Design Speed 100 km/hr

R (m)
Curve No.
e
Delta (deg.) 0^58'03"

Lc (m)

GAJOL
27+600

ROW

ROW
D :\ UJJW AL \3 76 2_ WE ST BENGAL_ 81 \R E-3\download.jpg

PI

5000
2.5%

13
84.440
27+622.177

22.00 M

24.00 M

26.00 M

28.00 M

30.00 M

32.00 M

34.00 M

ROW

ROW
27+600 25.393 27.852 27+650

ROW
27+664.396

R 5000.00
L 84.44

ROW
PT

27+625 24.959 27.916

ROW

ROW
27+650 25.028 27.981
27+655.6
e 2.5% 27+700

ROW

ROW
27+675 25.098 28.046
27+681.9 PVC 27+682
e 2.5% Elev 28.064

ROW
27+700 25.195 28.110

ROW
27+750

ROW
L2 50.000
L1 50.000

27+725 25.062 28.174


L100.000

PVI 27+732

ROW
Elev 28.194

New construct
ROW
27+750 24.370 28.237

ROW
27+800
27+775 24.201 28.300

ion
ROW
PVT 27+782
Elev 28.318

ROW
27+800 24.833 28.362

ROW

ROW
27+850
27+825 24.920 28.424

ROW

ROW
27+850 25.171 28.486

ROW
27+900

ROW
27+875 25.421 28.548
Slp0.248%
L224.521

L 224.521m
Slp 0.248%

ROW
27+900 25.631 28.610

ROW
NH-81 Starting from chainage 19.205 kmp to chainage 46.550 kmp (Existing Ch.)

ROW
27+925 25.517 28.672 27+950

ROW
ROW
27+950 25.316 28.734

ROW
Km. 27+600 to Km. 28+300

27+975 25.541 28.796


PLAN & PROFILE

ROW

28+000

ROW
28+000 25.882 28.858
PVC 28+007
ROW

Elev 28.875
28+016.4
e 2.5% ROW
28+045.036
28+025 25.948 28.920 TS
28+050
ROW

ROW
L2 50.000
L1 50.000
L100.000

28+050 26.005 28.982


PVI 28+057
Elev 28.999
ROW
A 225.55
L 55.00

28+073.7
ROW

28+075 e 2.5% 26.209 29.045


28+100.036
SC 28+100
ROW

28+100.0
28+100 26.191 29.109
ROW

e 4.8% PVT 28+107


Elev 29.126
ROW

28+125 26.099 29.172


RO W

28+150
DWG. NO. CET/2016/3762/NH-81/DPR/PP-13
Drawn By.
U.Malik

ROW
ER

28+150 26.205 29.236


O
W

ROW

G=2.1
ER

28+175 26.046 29.299


ROW
OW

RO W

28+200
HARISH CHANDRAPUR
ER

28+200 26.097 29.363


Design By.

OW
G.Banerjee

ROW

G=1.6
EXISTING ROAD / GROUND LINE
FINISHED ROAD LINE

G=1.8
RO W
OW
ER

28+225 26.147 29.426


G=0.9

RO
W
0
28+25
RO W

G=2.4
OW

G=0.8

G=1.0
Checked By.

G=1.1
ER

28+250 26.284 29.490


RO
W
B.Das

Slp0.254%
L349.333

G=1.4
G=2.2
OW

RO W
L 349.334m
Slp 0.254%

ER

G=1.2

28+275 26.224 29.554


RO
W

00
OW

28+3
RO W
ER

28+300 26.200 29.617


RO
Approved By.

W
A Nayek

W
O
28+325 26.090 29.681 ER
RO W

G=1.7
RO
W

50