Curing Compound Checklist

Contract number 66000353000 between Saudi Aramco and Azmeel Contracting Company is for the Saudi Aramco Home Ownership Project in Al Mutrafiah, Jubail, KSA. This document provides a checklist for monitoring concrete curing over 7 days at the project location, with requirements to keep the concrete fully covered with hessian cloth/burlap, covered with a polyethylene sheet, and the surface kept wet or using chemical curing. The checklist is to be signed by Azmeel and AECOM representatives daily to record compliance.

Uploaded by

Mohammed Arish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views1 page

Curing Compound Checklist

Contract number 66000353000 between Saudi Aramco and Azmeel Contracting Company is for the Saudi Aramco Home Ownership Project in Al Mutrafiah, Jubail, KSA. This document provides a checklist for monitoring concrete curing over 7 days at the project location, with requirements to keep the concrete fully covered with hessian cloth/burlap, covered with a polyethylene sheet, and the surface kept wet or using chemical curing. The checklist is to be signed by Azmeel and AECOM representatives daily to record compliance.

Uploaded by

Mohammed Arish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Contract No:- 66000353000 Client : Saudi Aramco

Saudi Aramco Home Ownership Project, Contractor : Azmeel Contracting Company


Project Title :-
Al Mutrafiah, Jubail , K.S.A Format No. AZ-QD-711-CKL-CP-60

Attachment to RFI # :
Monitoring /Checklist for Concrete Curing

Concrete Pouring Date: __________________________ Curing Start : _____________________________________

Curing Finish : _____________________________________


Concrete Curing Location: _________________________________________________________________________________________________________________________________

__________________________________________________________________________________________________________

CURING PERIOD
ITEM CURING REQUIREMENT Remarks
Day 1 Day2 Day 3 Day 4 Day 5 Day 6 Day 7

Concrete Curing completely


1
covered with hessian cloth /burlap

Hessian cloth / Burlap covered with


2
polythylene sheet

Concrete surface with water


3
ponding / wet

4 Chemical curing using cico cure Apply Cico Cure

AZMEEL QA/QC REPRESENTATIVE AECOM APPROVED

Printed Name:- Mohammed Salim Khan Printed Name:-

Signature:- Signature:-

Date:- Date:-