0% found this document useful (0 votes)
254 views1 page

Journey Management Log Sheet: Jazan - Abha Refined Products Pipeline Project

This document is a journey management log sheet for employees traveling between Jazan and Abha in Saudi Arabia. It requires travelers to confirm they have a valid Saudi driver's license and DIP/DIRS documents before traveling. It records travel details like expected check-in times, nominated journey coordinators, fatigue management plans, additional travel information, and equipment. The JMC must sign off to confirm the traveler's safe arrival or return.

Uploaded by

Farrukh Ijaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
254 views1 page

Journey Management Log Sheet: Jazan - Abha Refined Products Pipeline Project

This document is a journey management log sheet for employees traveling between Jazan and Abha in Saudi Arabia. It requires travelers to confirm they have a valid Saudi driver's license and DIP/DIRS documents before traveling. It records travel details like expected check-in times, nominated journey coordinators, fatigue management plans, additional travel information, and equipment. The JMC must sign off to confirm the traveler's safe arrival or return.

Uploaded by

Farrukh Ijaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

#

JAZAN – ABHA REFINED PRODUCTS PIPELINE PROJECT

Journey Management Log Sheet


By signing this form, you confirm that you are fit to travel (physically & mentally), your Saudi Arabian driver's license and your DIP/DIRS are current. If any of these are not current, immediately advise your supervisor and DO NOT TRAVEL. If in doubt - complete a full LPD Journey Management Form.
Note: Expected check-in time is arrival at proponent/LPD offices/facility, airport, seaport or bus/train station.

Expected Expected CONFIRMED Survival


Nominated JM CHECK-IN & TIME Satellite/
Fatigue Management Additional travel information: Equipment as Off-road
Date Name Vehicle ID# Destination / Purpose Time Out check-in check-in 4x4 AVL thria phone
Coordinator (e.g., sign back in or get (e.g. required stay in area or rest periods, use of
(e.g., destination contact and number, route details, satellite/thria
per Appendix training
Y N
time time someone to sign to confirm bus service or car pool, etc.)
phone number, etc.)
number
(JMC) you have arrived/returned D
(arrival) (return) safely)

JMC Sign off

You might also like