100% found this document useful (2 votes)
425 views2 pages

Protocolo EPS 200: Prueba Inyector Common Rail

This document summarizes the results of a common rail injector test conducted on four injectors. Key measurements taken include actuator resistance, injection duration, pressure, time, and flow rate. The test results show that injectors 1-3 mostly met specifications except for some flow rate measurements outside tolerance. Injector 3 was noted to have a deformed and leaking nozzle. Injector 4 met all specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
425 views2 pages

Protocolo EPS 200: Prueba Inyector Common Rail

This document summarizes the results of a common rail injector test conducted on four injectors. Key measurements taken include actuator resistance, injection duration, pressure, time, and flow rate. The test results show that injectors 1-3 mostly met specifications except for some flow rate measurements outside tolerance. Injector 3 was noted to have a deformed and leaking nozzle. Injector 4 met all specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Protocolo EPS 200

Prueba inyector Common Rail Fecha  20-01-2022 9:35:13

Expedido por
Diesel Puerto Montt SpA Tel.: 65 - 2 237782 Inspector: 
Santa Ines 442 Fax: 
  Puerto Montt Email:  dieselpuertomontt@gmail.com

Datos cliente
Mauricio Navarro Tel.:  No.cliente:  1990
  Fax: 
Email: 

Inyector Common Rail


No.tipo-pieza:  0445116035
Fabricante:  Bosch
Perfil activación:  ----
Descripción:  CRI 3-18
Resultados medición
Número de serie: 1
Valor nominal Valor real Evaluación
Código ISA ---- I —
Resistencia de actuador 170 - 200kΩ 181,6kΩ ✔
Paso de Duración activación Presión Tiempo Caudal inyección Caudal retorno Evaluación
prueba medic.
Valor nominal Valor real Valor nominal Valor real
(µs) (MPa) (s) (mm³/H) (mm³/H) (mm³/H) (mm³/H)
Leak test 0 160 60 ---- ± ---- ---- 0,1 ± 0,1 ---- ✔
Start test 2500 30 10 65,0 ± 35,0 55,85 ---- ± ---- ---- ✔
Back
pressure
2500 30 40 ---- ± ---- 58,97 ---- ± ---- ---- —
ISA
detection
700 160 40 5,0 ± 5,0 1,05 ---- ± ---- ---- ✔
VL 535 180 10 46,0 ± 4,5 40,95 11,0 ± 4,0 11,14 ✘
VE 180 120 10 1,5 ± 1,2 1,07 ---- ± ---- ---- ✔
LL 495 30 10 3,8 ± 2,2 3,73 ---- ± ---- ---- ✔
EM 475 80 10 18,2 ± 3,6 16,62 ---- ± ---- ---- ✔
Número de serie: 2
Valor nominal Valor real Evaluación
Código ISA ---- I —
Resistencia de actuador 170 - 200kΩ 183,3kΩ ✔
Paso de Duración activación Presión Tiempo Caudal inyección Caudal retorno Evaluación
prueba medic.
Valor nominal Valor real Valor nominal Valor real
(µs) (MPa) (s) (mm³/H) (mm³/H) (mm³/H) (mm³/H)
Leak test 0 160 60 ---- ± ---- ---- 0,1 ± 0,1 ---- ✔
Start test 2500 30 10 65,0 ± 35,0 54,93 ---- ± ---- ---- ✔
Back
pressure
2500 30 40 ---- ± ---- 55,08 ---- ± ---- ---- —
ISA
detection
700 160 40 5,0 ± 5,0 0,87 ---- ± ---- ---- ✔
VL 535 180 10 46,0 ± 4,5 40,50 11,0 ± 4,0 10,36 ✘
VE 180 120 10 1,5 ± 1,2 1,01 ---- ± ---- ---- ✔

Página1de2
Protocolo EPS 200
Prueba inyector Common Rail Fecha  20-01-2022 9:35:13

Paso de Duración activación Presión Tiempo Caudal inyección Caudal retorno Evaluación
prueba medic.
Valor nominal Valor real Valor nominal Valor real
(µs) (MPa) (s) (mm³/H) (mm³/H) (mm³/H) (mm³/H)
LL 495 30 10 3,8 ± 2,2 3,27 ---- ± ---- ---- ✔
EM 475 80 10 18,2 ± 3,6 16,70 ---- ± ---- ---- ✔
Número de serie: 3
Valor nominal Valor real Evaluación
Resistencia de actuador 170 - 200kΩ 183,5kΩ ✔
Paso de Duración activación Presión Tiempo Caudal inyección Caudal retorno Evaluación
prueba medic.
Valor nominal Valor real Valor nominal Valor real
(µs) (MPa) (s) (mm³/H) (mm³/H) (mm³/H) (mm³/H)
Leak test 0 160 60 ---- ± ---- ---- 0,1 ± 0,1 ---- ✘
Start test 2500 30 10 65,0 ± 35,0 ---- ---- ± ---- ---- —
Back
pressure
2500 30 40 ---- ± ---- ---- ---- ± ---- ---- —
ISA
detection
700 160 40 5,0 ± 5,0 ---- ---- ± ---- ---- —
VL 535 180 10 46,0 ± 4,5 ---- 11,0 ± 4,0 ---- —
VE 180 120 10 1,5 ± 1,2 ---- ---- ± ---- ---- —
LL 495 30 10 3,8 ± 2,2 ---- ---- ± ---- ---- —
EM 475 80 10 18,2 ± 3,6 ---- ---- ± ---- ---- —
Comentario: Tobera deformada y presenta pérdida.

Número de serie: 4
Valor nominal Valor real Evaluación
Código ISA ---- L —
Resistencia de actuador 170 - 200kΩ 187kΩ ✔
Paso de Duración activación Presión Tiempo Caudal inyección Caudal retorno Evaluación
prueba medic.
Valor nominal Valor real Valor nominal Valor real
(µs) (MPa) (s) (mm³/H) (mm³/H) (mm³/H) (mm³/H)
Leak test 0 160 60 ---- ± ---- ---- 0,1 ± 0,1 ---- ✔
Start test 2500 30 10 65,0 ± 35,0 52,80 ---- ± ---- ---- ✔
Back
pressure
2500 30 40 ---- ± ---- 55,63 ---- ± ---- ---- —
ISA
detection
700 160 40 5,0 ± 5,0 1,14 ---- ± ---- ---- ✔
VL 535 180 10 46,0 ± 4,5 43,23 11,0 ± 4,0 10,78 ✔
VE 180 120 10 1,5 ± 1,2 1,13 ---- ± ---- ---- ✔
LL 495 30 10 3,8 ± 2,2 3,63 ---- ± ---- ---- ✔
EM 475 80 10 18,2 ± 3,6 17,18 ---- ± ---- ---- ✔

Página2de2