O N S T R             C E L L E N              E   C  O   N S T           S T R U C  T I          T RU  C T I O           E XC E L L E          N E XC E L
I O N  E X              L L E N  C                  C E C O  N                C O N  S               C T I O N             U C T I O
STRUCTTRUCTION EXCTEION EXCELLENO                                N  E  XC E L L E N C E
                                                                                        E N C E  CO  N S T R  U
                                                                                                              L L E N C E C O N S T R
 CONS AWARD        N  S T R U C              S T  R   U  C T I           N E X C  E L L        I O N  E XC E
          C  E C O                E C O  N                     U C T I O               R U C T
 ELLEN N EXCELLENC ENCE CONSTR LENCE CONST
 RUCTIOCTION BECXA CELLRUCTION EXE CAWEALRD
O N S T R U          E C O  N  S T              L L E N C
             L E N C                     E XC E
N EXCEL
                                                                                              Key Features
     The Fullerton Bay Hotel
     Commercial / Mixed Development       Builder                      Quantity Surveyor      •   A commercial / hotel development comprising the conservation of the Clifford Pier and former Custom
     Buildings Category                   Kim Seng Heng                Davis Langdon KPK          Building Branch, as well as the construction of a 6-storey hotel block, single story Café, landing area,
                                          Engineering Construction     (Singapore) Pte Ltd        North Deck, promenades and other ancillary facilities over Marina Bay.
                                          (Pte) Ltd
                                                                                              •   Main constraints were the managing of heavy activities in the Central Business District as well as the
                                                                       Landscape Consultant
                                                                                                  challenges of construction over Marina Bay and along the existing seawall. Special attention was also
                                          Developer                    Ong&Ong Pte Ltd            required to avoid affecting existing underground services.
                                          Precious Quay Pte Ltd
                                                                       Lighting Consultant    •   Materials and equipment were delivered on a just-in-time basis due to site congestion.
                                          Principal Consultant         Light Cibles Pte Ltd
                                          DP Architects Pte Ltd                               •   The coordination of high end interior finishes required careful planning and installation as most materials
                                                                       Construction Cost          were imported.
                                          Architectural Consultant     S$134.9 million
                                          DP Architects Pte Ltd                               •   Stringent safety standards and special environmental control measures were implemented e.g. installation
                                                                       Construction Period        of perimeter underwater silt/debris control fence to prevent water pollution.
                                          Structural Consultant        32.0 months
                                                                                              •   Adopted a top-down construction and converted some structural components to precast to minimise
                                          Beca Carter Hollings &
                                                                                                  hazards of working above water.
                                          Ferner (S.E. Asia) Pte Ltd   Gross Floor Area
                                                                       10,000 m2              •   Constructed a robust temporary construction deck for construction vehicles, material storage and steel
                                          M&E Consultant                                          framing supports for “hanging” formwork.
                                          Beca Carter Hollings &
                                          Ferner (S.E. Asia) Pte Ltd                          •   Converted spun piles to micro piles for the North Deck Promenade where the micro piles also support the
                                                                                                  extension of the temporary construction deck over water.
                                                                                              •   Converted spun piles to bored piles with left-in fiberglass-reinforced plastic casing for higher loading
                                                                                                  capacity and protection against deterioration.
                                                                                              •   System formworks were used for construction of round columns for better finishing.
                                                                                                                                                                                                        177