We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 34
HRERA
Gurugram
1. Name and registered
address of the company
(Annex a copy in Folder A)
2. Managing
Director/HOD/CEO:
Temp Project Id : RERA-GRG-PROJ-341-
2019
Submission Date : 27-11-2019 07:14:32
AM
Applicant Type : Company
Project Type: NEW
FORM REP-|
Part-A
S V HOUSING PRIVATE
LIMITED
303, 3RD FLOOR, LAXMI
TOWER, C 1/3, NANIWALA
BAGH, AZADPUR , DELHI
-110033
Phone(Landline) 01244554811
9910947166 (Number Shared by
Phone(Mobile) Promoter in Public)
Email ID svhousing83@gmail.com
Website https:/www.83metrostreet.com
Pan No.
(Annex a copy in Folder XXXX536J
A)
CIN No.
(Annex a copy in Folder U70109DL2006PTC150816
A)
Name : ASHOK C JAISINGHANI
Residential Address : HOUSE NO. 6814 GROUND FLOOR
DLF PHASE-IV GALLERIA DLF-IV GURGAON HARYANA-
122009
Phone (landline) 01244554811
Phone (Mobile) 9910947166 (Number Shared by Promoter
in Public)3. Director 1:
4, Director 2:
nel
5. Director 3:
Email ID svhousing83@gmail.com
PAN No. XXXX487J
(Annex a copy in Folder A)
Name : AAKASH JAISINGHANI
Residential Address : HOUSE NO. 6814 GROUND FLOOR
DLF PHASE-IV GALLERIA DLF-IV GURGAON HARYANA-
122009
Phone (landline) 01244554811
Phone (Mobile) 9999609612 (Number Shared by Promoter
in Public)
Email ID aakash@svhousing.in
PAN No. XXXX724F
(Annex a copy in Folder A)
Name : SAHEED KHAN
Residential Address : HOUSE NO. 437 E-1 NAND NAGRI
MANDOLI SABOLI SEEMA PURI NORTH EAST DELHI-
110093
Phone (landline) 01244554811
Phone (Mobile) 9310084858 (Number Shared by Promoter
in Public)
Email ID
PAN No. XXXX874E
(Annex a copy in Folder A)
Name : VIJAYKUMAR RAMESHCHAND CHAWLA
Residential Address : 419420 2ND FLOOR DOUBLE
STOREY NEW RAJENDER NAGAR DELHI-1100606. Authorised reprsentative
for correspondance with
Authority:
Phone (landline) 01244554811
Phone (Mobile) 9953534100 (Number Shared by Promoter
in Public)
Email ID
PAN No. XXXX913H
(Annex a copy in Folder A)
Name : ASHOK C JAISINGHANI
Residential Address : HOUSE NO. 6814 GROUND FLOOR
DLF PHASE-IV GALLERIA DLF-IV GURGAON HARYANA-
122009
Phone (landline) 01244554811
Phone (Mobile) 9910947166 (Number Shared by Promoter
in Public)
Email ID svhousing83@gmail.com
PAN No. XXXX487J
(Annex a copy in Folder A)
Thereby declare that the above information and particulars ase based on record and are
true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant!
authorised representative
Stamp
DateFORM REP-|
Pai
Location and Address of the project:
1, Name of the project 83METROSTREET
2. Address of the site of the SECTOR-83, VILLAGE-
project SIHI, GURUGRAM,
(Annex a copy in Folder A) HARYANA
Tehsil GURGAON
District GURUGRAM
3. Contact details of the site
office of the project:
Phone(Landline) 01244554811
9818709717 (Number
Phone(Mobile) Shared by Promoter in
Public)
Email svhousing83@gmail.com
4. Contact person at the site
office:
Name PIYUSH SAHNI
Phone(Landline) 01244554811
9818709717 (Number
Phone(Mobile) Shared by Promoter in
Public)
Email piyush@svhousing.in
I hereby declare that the above information and particulars are based on record and are
true to the best of my knowledge and belief and nothing has been concealed.
Signature of the
Applicant / Authorised
RepresentativeStamp
DateFORM REP-|
Pai
Fee Details
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development)
Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker's Cheques:-
Ro en Choate Prat Amount|Payee Bank Payable
tc. HRERA
{118797 Ho. |595000 JBANK OF BARODA HRERA
ba. HRERA
I hereby declare that the above information and particulars are based on record and are
true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant
Mobile no.
Email IDFORM REP-|
Pai
Information relating to the project land and license:
1, Land area of the project 4.20 (Acre)
2. Permissible FAR 175
3, FAR proposed to be utilized in
the project 178
4, Total licensed area,
if the land area of the present 4.20 (Acre)
project is a part thereof
5, License number granted by the
Town & Country Planning
Department for the project/Allotted
By Municipal 140 OF 2012
Corporation/Permission by Local (26/10/2012)
Bodies
(Annex copy in folder B)
6. Is the applicant owner-licensee
of the land for which the Yes
registration is being sought.
I hereby declare that the above information and particulars are based on record and are
true to the best of my knowledge and belief and nothing has been concealed.
Signature of
the Applicant /
Authorised
Representative
Stamp
DateFORM REP-|
Pai
Project Details:
1, Estimated cost of the project:
(Annex a copy of the project in
Folder C)
i, Cost of the land (if included in
the estimated cost)
ii, Estimated cost of
construction of apartments
iil, Estimated cost of
infrastructure and other
structures
iv, Other Costs including EDC,
Taxes, Levies etc.
25620.18 Lakhs
4380.23 Lakhs
13901.00 Lakhs
3549.19 Lakhs
3217.00 Lakhs
2. The total land of the project measuring 16996.77 Square Meters will be utilised in the
following manner:
INS. Land area under usage \Sauare Motors)
h |pLots To BE SOLD lo
lo renee BE USED FOR CONSTRUCTION OF 5588.492
8 |CONSTRUCTION OF ROADS 513,330
4 PAVEMENTS 0
5 |PARKS AND PLAYGROUNDS lv70.372|GREEN BELTS
\VEHICLE PARKINGS
\2372.156
ELECTRICITY SUB-STATION
\CLUB HOUSE
Ho
|SEWAGE AND SOLID WASTE TREATMENT FACILITY
4
|AREA TO BE LEFT FOR TRANSFERRING TO THE
|GOVERNMENT FOR COMMUNITY SERVICES
2
IANY OTHER
14752.420
{Total
16996.773.Approvals/ NOCs from various agencies for connecting external services.
Eterna Whether Approval
ioe ti 2 itaken from the agency
Facility provide aby. concerned. Yes/No
fvame the (Annex details in folder!
lagency)
ROADS IHSVPIGMDA [No
|WATER SUPPLY IHSVP \Yes
ELECTRICITY IDHBVN \Yes
ISEWAGE DISPOSAL IHSVPIGMDA Yes
ISTORM WATER DRAINAGE IHSVP/GMDA [No4.Details of services and facilities which will be provided inside the project area as
per service plan estimates and/or the project report:
|Remarks: Yet to be
lprepared / Submitted
Estimated |to HUDA, Town &
lcost (In |Country Planning
sr. ai Lakhs) [Department/ as per
No. [Name of the facility Within [project report etc.
the project|(Annex relevant
larea only) |documents showing
costing details ete. in
frolder Cc)
INTERNAL ROADS AND PAVEMENTS 173.05 [SUBMITTED TO HUDA
2 WATER SUPPLY SYSTEM 179.90 [SUBMITTED To HUDA
STORM WATER DRAINAGE 36.83 [SUBMITTED TO HUDA
IYET TO BE
4 |ELECTRICITY SUPPLY SYSTEM 1364.92 IPREPARED
SEWAGE TREATMENT & GARBAGE
5 [Sewwace 171.95 [SUBMITTED To HUDA
ls [STREET LIGHTING 16.12 SUBMITTED To HUDA
YET TO BE
7 |SECURITY AND FIRE FIGHTING lszo49 KET TOBE
YET TO BE
ls. [PLAYGROUNDS AND PARKS lo Neeparen
YET TO BE
lo cLUB HOUSE/COMMUNITY CENTRE lo NREpaRep
IYET TO BE
110 |SHOPPING AREA 0 IPREPARED
YET TO BE
lit [RENEWABLE ENERGY SYSTEM lso.00 = KET TOBE
VET TO BE
2 |scHooL lo Met TOBE13. |HOSPITALIDISPENSARY lo YET TO BE
PREPARED
YET TO BE
4. |ANY OTHER lo PREPARED
HS [HORTICULTURE 13.53 [SUBMITTED TO HUDA
YET TO BE
M6 [HVAC 992.40 BREPARED
5. (a) Date of approval of latest layout plans granted by Town &
Country Planning Department on the basis of which the project will be
executed.
25-10-2019
(date)
6, Date of approval of Building Plans 10-10-2017 (date)7. New projects:
i) Likely date of starting the construction work
ii) Likely date of completing the project
il) Sizes of the plots to be offered in the project
14-03-2018
30-09-2022
Plot Area(in Square Meter)
Number of plots in the project
iv. Type of apartments to be constructed in the project
Buildings
Irype ICarpet area(In Square [Number of Number of
yp IMeter) lapartments lowers
JApartment/Shops/Other —|1 5.99 gaa loo i(vi) Quarterly schedule of development of whole/remaining part of the project:
(c) Apartments/Shops/Other Buildings
Expenditure incurred till the date of application (In Lakhs)
Particulars Expenditure
[Apartments lo
IShops lo
Plots lo
ICost of Construction 1656.39
IExternal Development Charges 1721.50
infrastructure Development Charges \204.00
Land Cost [4380.23
[Other Costs [978.53
Expenditure to be made in each quarter (In Lakhs)
Year-2019
Particulars Nan ber \July-Sep |Oct-Dec
JApariments lo
IShops lo
Plots lo
ICost of Construction 490.00
Other Costs including EDC and IDC and taxes esoParticulars —_—|Year-2020
Jan-Mar —«‘|Apr-June Jul-Sep [Oct-Dec
[Apartments [0 lo lo lo
IShops lo lo lo lo
Plots lo lo lo lo
coset tion 1300.00 (350.00 \400.00 1900.00
lOther Costs
[rea EOC eso le.s0 1160.00 6.50
taxes ete
[Year-2021
Particulars = |
Jan-Mar [Apr-June July-Sep [Oct-Dec
[Apartments [0 lo lo lo
IShops lo lo lo lo
Plots lo lo lo lo
Cost sion 1000.00 1200.00 1400.00 1440.00
lOther Costs
tree EOC eso 6.50 6.50 6.50
ltaxes ete
lYear-2022
Particulars = |
Jan-Mar [Apr-June July-Sep [Oct-Dec
[Apartments [0 lo lo
IShops lo lo lo
Plots lo lo o
Coster ion (1220.00 1855.00 1689.61
lOther Costs ‘(6.50 [60.00 [34.47
including EDCland IDC and
ltaxes ete(d) Infrastructure
Expenditure incurred till the date of application (In Lakhs)
Particulars Expenditure
Roads & Pavements
|Water Supply System
|Sewerage treatment & garbage disposal
[Electricity Supply System
IStorm Water Drainage
[Parks and Playgrounds
IClubhouse/community centres
[Shopping area
S| S/ SP Srey es se, ere
OtherExpenditure to be made in each quarter (In Lakhs)
\Year-2021
Particulars pos
Jan-Mar |Apr-June July-Sep [Oct-Dec
Roads & Pavements lo
|Water Supply System lo
ISewerage treatment & garbage disposal lo
[Electricity Supply System \40.00
[Storm Water Drainage lo
[Parks and Playgrounds lo
IClubhouse/community centres lo
[Shopping area lo
lOther lo
HVAC 120.00
\Year-2022
Particulars
ae Pe Ee fesoe
[Roads & Pavements jo [70.00 103.05
|Water Supply System 20.00 60.00 99.90
ISewerage treatment & garbage disposal |0 30.00 [41.95
[Electricity Supply System [200.00 |500.00 |624.92
IStorm Water Drainage 10.00 [10.00 [16.83
[Parks and Playgrounds lo 0 lo
IClubhouse/community centres lo o lo
[Shopping area lo 0 lo
lOther lo 0 loISecurity and Fire Fighting 150.00 [200.00 {370.49
Renewable Energy System 110.00 {80.00
IStreet Lighting i500 [14.12
HVAC 1100.00 [300.00 {572.40
Horticulture 3.53
Itis hereby stated and declared and the above information is correct and true and nothing
has been concealed or misrepresented.
Signature of the Applicant / Authorised Representative
Stamp
DateFORM REP-|
Pai
Accounts related information:
1, Annex copy of the balance sheet of last 3 years Yes
2. In case of on-going projects,cash flow statement since start of
the project up-to-date in folder D.
Total receipt of funds, sources of funds and deployment of funds
should be stated in tabulated form
No
3, Bank account to which the deposits received from apartment
buyers will be credited
BANK OF BARODA,
Bank and Branch address KAROL BAGH, NEW
DELHI-110005
Bank Account number 0097020000631
IFSC code BARBOKAROLB
MICR code 110012020
Branch code KAROLB
4. Name and address of the person/persons who would ordinarily paxasi
be operating the account (Change at any time must be intimated SAIS INGHANI
to the Authority)
5, Attach certificate issued by a Chartered Accountant that the
applicant has not defaulted in its debt liabilities in the past five UPLOADED
years in folder D. (In case of default, give details)
Thereby declare that the above information and particulars are based on record and are
true to the best of my knowledge and belief and nothing has been concealed.
Signature of the
Applicant /
Authorised
RepresentativeStamp
DateFORM REP-|
Part -E
Details of the statutory approvals:
1. Annex copies of the following in Folder E:
i. Lay out Plan No
ii. Demarcation Plan No
ili, Zoning Plan Yes
iv. Building Plan Yes
Site Plan Yes
Floor Plan Yes
Apartment Plans No
Elevation Section Yes
Detail of Permissible FAR Yes
Detail of covered area achieved FAR Yes2. Annex copies of the following in Folder E:
|, ROADS AND PAVEMENT PLAN
ll. ELECTRICITY SUPPLY PLAN
Ill. WATER SUPPLY PLAN
IV, SEWERAGE AND GARBAGE DISPOSAL PLAN
V. STROM WATER DRAINAGE
VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY
FACILITY
VI. STREET LIGHTING PLAN
VII. PARKING PLAN
No
No
No
No
No
No
No
No3. Statutory Approvals Status
[Statutory Approvals,
Istatutory Approvals Status Date
ALREADY BEEN \26-10-
|. LICENSE OBTAINED 2012
ALREADY BEEN \06-04-
Il. BUILDING PLAN APPROVAL ALREADY pe
ALREADY BEEN \25-10-
Ill. REVISED BUILDING PLAN APPROVAL ALR pee
JALREADY BEEN [30-01-
lv. ENVIRONMENT CLEARANCE ae po
ALREADY BEEN i21-03-
lV. HEIGHT CLEARANCE ae ae
JALREADY BEEN 114-03-
IVI. MINING PERMISSION AORRINED. Cae
[ALREADY BEEN i08-03-
Vil. CONSENT To ESTABLISH ARIES. oe
[ALREADY BEEN i30-05-
Vill. ARAVALI NOC AO RRINED. poe
[ALREADY BEEN He-04-
Ix. FOREST Noc eeRieD. bee
[ALREADY BEEN H2-10-
)X. ASSURANCE OF FRESH WATER SUPPLY lOBTAINED 12017
Ix, ASSURANCE FOR STP WATER FOR [ALREADY BEEN H6-10-
CONSTRUCTION OBTAINED l2017
[ALREADY BEEN lo5-12-
XI. ASSURANCE OF ULTIMATE POWER LOAD lOBTAINED 12014
Ixill, ASSURANCE FOR SEWERAGE [ALREADY BEEN 6-10-
CONNECTION OBTAINED l2017
Itis undertaken that the project shall be completed within the time schedule given in Part
C and the same will not be delayed on account of non- receipt of any of the statutory
approval. The liability for the non-receipt of any of the statutory approval shall be that of
the promoter and in case of delay, compensation as per law may be given to the allottees.Signature
Seal
DateFORM REP-|
Part
1. A copy of the draft allotment letter by which the
apartment shall be allotted/ booked in favour of the.
apartment buyers.
(Annex a copy in Folder F)
Yes
2. A copy of the Draft Agreement which shall be made
before seeking any deposit exceeding 10% of the
cost of the apartment. (Based on the model Yes
agreement prescribed in the Rules)
(Annex a copy in Folder F)
BOTH PARTIES WILL PAY SAME
AMOUNT OF PENALTIES ON
THE DEFAULT Possession Date-
September,2022
3. Gist of the important provisions of the Draft
Agreement
(Annex a copy in Folder F)
' hereby declare that the above information and particulars are based on record and are
true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant /
Authorised Representative
Stamp
DateFORM REP-|
Part-G
Projects launched by the promoter in last five years: (No Projects)
hereby declare that the above information and particulars are based on record and are
true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp
DateFORM REP-|
Pai
SPECIFICATION OF CONSTRUCTION
|Specification of apartments and other buildings including the following:
FLOORING DETAILS OF
IVARIOUS PARTS OF HOUSE
[STONE / TILE FLOORING IN COMMON
|AREAS
WALL FINISHING DETAILS
|CEMENT PLASTER & PAINT IN COMMON
|AREAS
8 KITCHEN DETAILS INIA
4 [BATHROOM FITTINGS WHITE CHINAWARE WITH CP FITTINGS
5 [WOOD WORK ETC INIA
6 [DOORS AND WINDOS FRAMES [ALUMINIUM FRAMES WITH GLASS
TTOUGHENED GLASS 6MM THICK AND
7 |ctass work ouct
ELECTRICAL FITTINGS & FIXTURES NOT
ls |evectRIc FiTTINGs Bares
Jo [SONDUCTING AND WIRING [aye CONDUCTING WITH COPPER WIRING
IDETAILS
10 |CUPBOARD DETAILS N/A
400K. FIRE TANK, 150KL DOMESTIC TANK,
1 JWATER STORAGE HS0KL RAW WATER TANK
2 [LIFT DETAILS Ho NOS
HS |EXTERNAL GLAZINGS CURTAIN / STRUCTURAL GLAZING
3.1 |WINDOWS/GLAZINGS [ALUMINIUM FRAMES WITH GLASS
ICOMMERGIAL FLUSH DOOR SHUTTERS /
4 Poors GLASS DOORS
ICOMMERGIAL FLUSH DOOR SHUTTERS /
114.1 |MAIN DOORS COMMERCIAL f
14.2 INTERNAL DOORS ICOMMERGIAL FLUSH DOOR SHUTTERS /
IGLASS DOORS15
|AIR CONDITIONING
|CHILLED WATER & DX SYSTEM
6
ELECTRICAL FITTINGS
[ELECTRICAL FITTINGS & FIXTURES NOT
PROVIDED
M7
ICNG PIPE LINE
INIA.
18,
PROVISION OF WIFI AND
IBROADBAND FACILITY
\YES PROVISION IS THERE
9
EXTERNAL FINISHING/COLOUR
ISCHEME
PLASTER & PAINT, GLAZING, ACP / STONE
ICLADDING
\20
INTERNAL FINISHING
ICEMENT / GYPSUM PLASTER IN COMMON
|AREASSPECIFICATION UNIT WISE
it . LIVING/DINING/FOYER/FAMILY LOUNGE
4 |FLOOR INIA
.2 WALLS INIA
1.3 [CEILING INIA
2. MASTER BEDROOM/DRESSROOM
2.1 |FLOOR INIA
2.2 |WALLS INIA
2.3 |CEILING INIA
2.4 |MODULAR WARDROBES INIA
Is. MASTER TOILET
8.1 |FLOOR INIA
3.2 [WALLS INIA
8.3 [CEILING INIA.
8.4 [COUNTERS INIA
8.5 [SANITARY WAREICP FITTINGS INIA
8.6 |FITTING/FIXTURES INIA
4. BED ROOMS
4.1 |FLOOR INIA
l4.2 |WALLS INIA
l4.3 [CEILING INIA
4.4 |WARDROBES INIA
5. TOILET
5.1 |FLOOR INIA
5.2 [WALLS INIA
5.3 [CEILING INIA
5.4 [COUNTERS INIA
5.5 [SANITARY WAREICP FITTINGS INIA5.6 |FIXTURES INIA
6 . KITCHEN
6.1 |FLOOR INIA
j6.2 |WALLS INIA
6.3 [CEILING INIA
6.4 |COUNTERS. INIA
6.5 |FIXTURES INIA
6.6 |KITCHEN APPLIANCES INIA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7.1 |FLOOR INIA
7.2 WALLS & CEILING INIA
7.3 [TOILET INIA
7.4 [BALCONY INIA
ls. SIT-OUTS
jg.1 FLOOR INIA
8.2 |WALLS & CEILING INIA
js.3 RAILINGS INIA
8.4 |FIXTURES INIA
Thereby declare that the above information and particulars are based on record and are
true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp
DateList of Uploaded Documents
[Date of
Re Document Description Pecument New ent
1 |SERVICE PLAN DRAWING-1 11-02-2020
2 |SERVICE PLAN DRAWING-2 11-02-2020
3 [SERVICE PLAN DRAWING-3 11-02-2020
4 |SERVICE PLAN DRAWING-4 11-02-2020
s NON DEFAULT CERTIFICATE FROMA CHARTERED |, 11.2919 [View
\6 |SITE PLAN 122-411-2019
7 [BUILDING PLAN APPROVAL 122-411-2019
p PERIRAONSEFOEDEY EPOMTDUY besiaore Ra
p OREO SROUOENSTSOUERORL —besvaore Ry
HO [DETAIL OF PERMISSIBLE FAR i22-11-2019
[11 [REVISED BUILDING PLANS APPROVAL 122-411-2019
2 DETAIL OF COVERED AREA ACHIEVED FAR 122-411-2019
3. JENVIRONMENT CLEARANCE 122-117-2019
fa [COPY OF LICENSE ALONG WITH SCHEDULE OF lop 44.2049 iiaw
5 ZONING PLAN 22-11-2019 [ew
[Document
he [A COMPLETE SET OF THE LAST APPROVED a
7 [HEIGHT CLEARANCE i22-11-2019118 [MINING PERMISSION [22-11-2019
19 |RERA REGISTRATION CERTIFICATE [23-11-2019
|20 |CONSENT TO ESTABLISH [22-11-2019
|21 |ARAVALI NOC [22-11-2019
|22 |FOREST NOC. [22-11-2019
|23 |NON-ENCUMBRANCE CERTIFICATE 11-02-2020
|24 |SERVICE PLAN DRAWING-5 11-02-2020
25 |ASSURANCE OF FRESH WATER SUPPLY \22-11-2019
26 CONSTRUCTION STP WATER FOR l22-11-2019
|27 |ASSURANCE OF ULTIMATE POWER LOAD \22-11-2019
|28 |ASSURANCE FOR SEWERAGE CONNECTION \22-11-2019
|29 |ELEVATION SECTION [22-11-2019
[30 |COPY OF THE BALANCE SHEET OF LAST 3 YEARS [23-11-2019
31 |PROJECT REPORT [22-11-2019
[32 |COPY OF THE DRAFT ALLOTMENT LETTER [22-11-2019
[33 |COPY OF THE DRAFT AGREEMENT [22-11-2019 -
34 avour. Sane COLONY, THE LATEST lo7-11-2019 Dew nent
35 INVENTORY SHEET (03-01-2020
36 |SERVICE PLAN ESTIMATE (03-01-2020
27 CORSON AS ANOS Ir azanz
[38 JENTRY OF LICENSE IN REVENUE RECORD 11-02-2020
39 |FIRE SCHEME APPROVAL, 11-02-2020
|40 |LC-IV 11-02-2020
[41 |SERVICE PLAN DRAWINGS 12-02-2020
|42 |LOI 11-02-2020
|43 |SERVICE PLAN APPROVAL LETTER 11-02-2020I hereby declare that the above information and particulars are based on record and are
true to the best of my knowledge and belief and nothing has been concealed.
Signature of the Applicant / Authorised Representative
Stamp
Date