0% found this document useful (0 votes)
126 views34 pages

SVH 83 Metrostreet

Uploaded by

Anup Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
126 views34 pages

SVH 83 Metrostreet

Uploaded by

Anup Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 34
HRERA Gurugram 1. Name and registered address of the company (Annex a copy in Folder A) 2. Managing Director/HOD/CEO: Temp Project Id : RERA-GRG-PROJ-341- 2019 Submission Date : 27-11-2019 07:14:32 AM Applicant Type : Company Project Type: NEW FORM REP-| Part-A S V HOUSING PRIVATE LIMITED 303, 3RD FLOOR, LAXMI TOWER, C 1/3, NANIWALA BAGH, AZADPUR , DELHI -110033 Phone(Landline) 01244554811 9910947166 (Number Shared by Phone(Mobile) Promoter in Public) Email ID svhousing83@gmail.com Website https:/www.83metrostreet.com Pan No. (Annex a copy in Folder XXXX536J A) CIN No. (Annex a copy in Folder U70109DL2006PTC150816 A) Name : ASHOK C JAISINGHANI Residential Address : HOUSE NO. 6814 GROUND FLOOR DLF PHASE-IV GALLERIA DLF-IV GURGAON HARYANA- 122009 Phone (landline) 01244554811 Phone (Mobile) 9910947166 (Number Shared by Promoter in Public) 3. Director 1: 4, Director 2: nel 5. Director 3: Email ID svhousing83@gmail.com PAN No. XXXX487J (Annex a copy in Folder A) Name : AAKASH JAISINGHANI Residential Address : HOUSE NO. 6814 GROUND FLOOR DLF PHASE-IV GALLERIA DLF-IV GURGAON HARYANA- 122009 Phone (landline) 01244554811 Phone (Mobile) 9999609612 (Number Shared by Promoter in Public) Email ID aakash@svhousing.in PAN No. XXXX724F (Annex a copy in Folder A) Name : SAHEED KHAN Residential Address : HOUSE NO. 437 E-1 NAND NAGRI MANDOLI SABOLI SEEMA PURI NORTH EAST DELHI- 110093 Phone (landline) 01244554811 Phone (Mobile) 9310084858 (Number Shared by Promoter in Public) Email ID PAN No. XXXX874E (Annex a copy in Folder A) Name : VIJAYKUMAR RAMESHCHAND CHAWLA Residential Address : 419420 2ND FLOOR DOUBLE STOREY NEW RAJENDER NAGAR DELHI-110060 6. Authorised reprsentative for correspondance with Authority: Phone (landline) 01244554811 Phone (Mobile) 9953534100 (Number Shared by Promoter in Public) Email ID PAN No. XXXX913H (Annex a copy in Folder A) Name : ASHOK C JAISINGHANI Residential Address : HOUSE NO. 6814 GROUND FLOOR DLF PHASE-IV GALLERIA DLF-IV GURGAON HARYANA- 122009 Phone (landline) 01244554811 Phone (Mobile) 9910947166 (Number Shared by Promoter in Public) Email ID svhousing83@gmail.com PAN No. XXXX487J (Annex a copy in Folder A) Thereby declare that the above information and particulars ase based on record and are true to the best of my knowledge and belief and nothing has been concealed. Signature of the Applicant! authorised representative Stamp Date FORM REP-| Pai Location and Address of the project: 1, Name of the project 83METROSTREET 2. Address of the site of the SECTOR-83, VILLAGE- project SIHI, GURUGRAM, (Annex a copy in Folder A) HARYANA Tehsil GURGAON District GURUGRAM 3. Contact details of the site office of the project: Phone(Landline) 01244554811 9818709717 (Number Phone(Mobile) Shared by Promoter in Public) Email svhousing83@gmail.com 4. Contact person at the site office: Name PIYUSH SAHNI Phone(Landline) 01244554811 9818709717 (Number Phone(Mobile) Shared by Promoter in Public) Email piyush@svhousing.in I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. Signature of the Applicant / Authorised Representative Stamp Date FORM REP-| Pai Fee Details As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows: 2. The aforesaid fees is hereby deposited vide following Drafts/ Banker's Cheques:- Ro en Choate Prat Amount|Payee Bank Payable tc. HRERA {118797 Ho. |595000 JBANK OF BARODA HRERA ba. HRERA I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. Signature of the Applicant Mobile no. Email ID FORM REP-| Pai Information relating to the project land and license: 1, Land area of the project 4.20 (Acre) 2. Permissible FAR 175 3, FAR proposed to be utilized in the project 178 4, Total licensed area, if the land area of the present 4.20 (Acre) project is a part thereof 5, License number granted by the Town & Country Planning Department for the project/Allotted By Municipal 140 OF 2012 Corporation/Permission by Local (26/10/2012) Bodies (Annex copy in folder B) 6. Is the applicant owner-licensee of the land for which the Yes registration is being sought. I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. Signature of the Applicant / Authorised Representative Stamp Date FORM REP-| Pai Project Details: 1, Estimated cost of the project: (Annex a copy of the project in Folder C) i, Cost of the land (if included in the estimated cost) ii, Estimated cost of construction of apartments iil, Estimated cost of infrastructure and other structures iv, Other Costs including EDC, Taxes, Levies etc. 25620.18 Lakhs 4380.23 Lakhs 13901.00 Lakhs 3549.19 Lakhs 3217.00 Lakhs 2. The total land of the project measuring 16996.77 Square Meters will be utilised in the following manner: INS. Land area under usage \Sauare Motors) h |pLots To BE SOLD lo lo renee BE USED FOR CONSTRUCTION OF 5588.492 8 |CONSTRUCTION OF ROADS 513,330 4 PAVEMENTS 0 5 |PARKS AND PLAYGROUNDS lv70.372 |GREEN BELTS \VEHICLE PARKINGS \2372.156 ELECTRICITY SUB-STATION \CLUB HOUSE Ho |SEWAGE AND SOLID WASTE TREATMENT FACILITY 4 |AREA TO BE LEFT FOR TRANSFERRING TO THE |GOVERNMENT FOR COMMUNITY SERVICES 2 IANY OTHER 14752.420 {Total 16996.77 3.Approvals/ NOCs from various agencies for connecting external services. Eterna Whether Approval ioe ti 2 itaken from the agency Facility provide aby. concerned. Yes/No fvame the (Annex details in folder! lagency) ROADS IHSVPIGMDA [No |WATER SUPPLY IHSVP \Yes ELECTRICITY IDHBVN \Yes ISEWAGE DISPOSAL IHSVPIGMDA Yes ISTORM WATER DRAINAGE IHSVP/GMDA [No 4.Details of services and facilities which will be provided inside the project area as per service plan estimates and/or the project report: |Remarks: Yet to be lprepared / Submitted Estimated |to HUDA, Town & lcost (In |Country Planning sr. ai Lakhs) [Department/ as per No. [Name of the facility Within [project report etc. the project|(Annex relevant larea only) |documents showing costing details ete. in frolder Cc) INTERNAL ROADS AND PAVEMENTS 173.05 [SUBMITTED TO HUDA 2 WATER SUPPLY SYSTEM 179.90 [SUBMITTED To HUDA STORM WATER DRAINAGE 36.83 [SUBMITTED TO HUDA IYET TO BE 4 |ELECTRICITY SUPPLY SYSTEM 1364.92 IPREPARED SEWAGE TREATMENT & GARBAGE 5 [Sewwace 171.95 [SUBMITTED To HUDA ls [STREET LIGHTING 16.12 SUBMITTED To HUDA YET TO BE 7 |SECURITY AND FIRE FIGHTING lszo49 KET TOBE YET TO BE ls. [PLAYGROUNDS AND PARKS lo Neeparen YET TO BE lo cLUB HOUSE/COMMUNITY CENTRE lo NREpaRep IYET TO BE 110 |SHOPPING AREA 0 IPREPARED YET TO BE lit [RENEWABLE ENERGY SYSTEM lso.00 = KET TOBE VET TO BE 2 |scHooL lo Met TOBE 13. |HOSPITALIDISPENSARY lo YET TO BE PREPARED YET TO BE 4. |ANY OTHER lo PREPARED HS [HORTICULTURE 13.53 [SUBMITTED TO HUDA YET TO BE M6 [HVAC 992.40 BREPARED 5. (a) Date of approval of latest layout plans granted by Town & Country Planning Department on the basis of which the project will be executed. 25-10-2019 (date) 6, Date of approval of Building Plans 10-10-2017 (date) 7. New projects: i) Likely date of starting the construction work ii) Likely date of completing the project il) Sizes of the plots to be offered in the project 14-03-2018 30-09-2022 Plot Area(in Square Meter) Number of plots in the project iv. Type of apartments to be constructed in the project Buildings Irype ICarpet area(In Square [Number of Number of yp IMeter) lapartments lowers JApartment/Shops/Other —|1 5.99 gaa loo i (vi) Quarterly schedule of development of whole/remaining part of the project: (c) Apartments/Shops/Other Buildings Expenditure incurred till the date of application (In Lakhs) Particulars Expenditure [Apartments lo IShops lo Plots lo ICost of Construction 1656.39 IExternal Development Charges 1721.50 infrastructure Development Charges \204.00 Land Cost [4380.23 [Other Costs [978.53 Expenditure to be made in each quarter (In Lakhs) Year-2019 Particulars Nan ber \July-Sep |Oct-Dec JApariments lo IShops lo Plots lo ICost of Construction 490.00 Other Costs including EDC and IDC and taxes eso Particulars —_—|Year-2020 Jan-Mar —«‘|Apr-June Jul-Sep [Oct-Dec [Apartments [0 lo lo lo IShops lo lo lo lo Plots lo lo lo lo coset tion 1300.00 (350.00 \400.00 1900.00 lOther Costs [rea EOC eso le.s0 1160.00 6.50 taxes ete [Year-2021 Particulars = | Jan-Mar [Apr-June July-Sep [Oct-Dec [Apartments [0 lo lo lo IShops lo lo lo lo Plots lo lo lo lo Cost sion 1000.00 1200.00 1400.00 1440.00 lOther Costs tree EOC eso 6.50 6.50 6.50 ltaxes ete lYear-2022 Particulars = | Jan-Mar [Apr-June July-Sep [Oct-Dec [Apartments [0 lo lo IShops lo lo lo Plots lo lo o Coster ion (1220.00 1855.00 1689.61 lOther Costs ‘(6.50 [60.00 [34.47 including EDC land IDC and ltaxes ete (d) Infrastructure Expenditure incurred till the date of application (In Lakhs) Particulars Expenditure Roads & Pavements |Water Supply System |Sewerage treatment & garbage disposal [Electricity Supply System IStorm Water Drainage [Parks and Playgrounds IClubhouse/community centres [Shopping area S| S/ SP Srey es se, ere Other Expenditure to be made in each quarter (In Lakhs) \Year-2021 Particulars pos Jan-Mar |Apr-June July-Sep [Oct-Dec Roads & Pavements lo |Water Supply System lo ISewerage treatment & garbage disposal lo [Electricity Supply System \40.00 [Storm Water Drainage lo [Parks and Playgrounds lo IClubhouse/community centres lo [Shopping area lo lOther lo HVAC 120.00 \Year-2022 Particulars ae Pe Ee fesoe [Roads & Pavements jo [70.00 103.05 |Water Supply System 20.00 60.00 99.90 ISewerage treatment & garbage disposal |0 30.00 [41.95 [Electricity Supply System [200.00 |500.00 |624.92 IStorm Water Drainage 10.00 [10.00 [16.83 [Parks and Playgrounds lo 0 lo IClubhouse/community centres lo o lo [Shopping area lo 0 lo lOther lo 0 lo ISecurity and Fire Fighting 150.00 [200.00 {370.49 Renewable Energy System 110.00 {80.00 IStreet Lighting i500 [14.12 HVAC 1100.00 [300.00 {572.40 Horticulture 3.53 Itis hereby stated and declared and the above information is correct and true and nothing has been concealed or misrepresented. Signature of the Applicant / Authorised Representative Stamp Date FORM REP-| Pai Accounts related information: 1, Annex copy of the balance sheet of last 3 years Yes 2. In case of on-going projects,cash flow statement since start of the project up-to-date in folder D. Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form No 3, Bank account to which the deposits received from apartment buyers will be credited BANK OF BARODA, Bank and Branch address KAROL BAGH, NEW DELHI-110005 Bank Account number 0097020000631 IFSC code BARBOKAROLB MICR code 110012020 Branch code KAROLB 4. Name and address of the person/persons who would ordinarily paxasi be operating the account (Change at any time must be intimated SAIS INGHANI to the Authority) 5, Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five UPLOADED years in folder D. (In case of default, give details) Thereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. Signature of the Applicant / Authorised Representative Stamp Date FORM REP-| Part -E Details of the statutory approvals: 1. Annex copies of the following in Folder E: i. Lay out Plan No ii. Demarcation Plan No ili, Zoning Plan Yes iv. Building Plan Yes Site Plan Yes Floor Plan Yes Apartment Plans No Elevation Section Yes Detail of Permissible FAR Yes Detail of covered area achieved FAR Yes 2. Annex copies of the following in Folder E: |, ROADS AND PAVEMENT PLAN ll. ELECTRICITY SUPPLY PLAN Ill. WATER SUPPLY PLAN IV, SEWERAGE AND GARBAGE DISPOSAL PLAN V. STROM WATER DRAINAGE VI. 10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITY VI. STREET LIGHTING PLAN VII. PARKING PLAN No No No No No No No No 3. Statutory Approvals Status [Statutory Approvals, Istatutory Approvals Status Date ALREADY BEEN \26-10- |. LICENSE OBTAINED 2012 ALREADY BEEN \06-04- Il. BUILDING PLAN APPROVAL ALREADY pe ALREADY BEEN \25-10- Ill. REVISED BUILDING PLAN APPROVAL ALR pee JALREADY BEEN [30-01- lv. ENVIRONMENT CLEARANCE ae po ALREADY BEEN i21-03- lV. HEIGHT CLEARANCE ae ae JALREADY BEEN 114-03- IVI. MINING PERMISSION AORRINED. Cae [ALREADY BEEN i08-03- Vil. CONSENT To ESTABLISH ARIES. oe [ALREADY BEEN i30-05- Vill. ARAVALI NOC AO RRINED. poe [ALREADY BEEN He-04- Ix. FOREST Noc eeRieD. bee [ALREADY BEEN H2-10- )X. ASSURANCE OF FRESH WATER SUPPLY lOBTAINED 12017 Ix, ASSURANCE FOR STP WATER FOR [ALREADY BEEN H6-10- CONSTRUCTION OBTAINED l2017 [ALREADY BEEN lo5-12- XI. ASSURANCE OF ULTIMATE POWER LOAD lOBTAINED 12014 Ixill, ASSURANCE FOR SEWERAGE [ALREADY BEEN 6-10- CONNECTION OBTAINED l2017 Itis undertaken that the project shall be completed within the time schedule given in Part C and the same will not be delayed on account of non- receipt of any of the statutory approval. The liability for the non-receipt of any of the statutory approval shall be that of the promoter and in case of delay, compensation as per law may be given to the allottees. Signature Seal Date FORM REP-| Part 1. A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the. apartment buyers. (Annex a copy in Folder F) Yes 2. A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model Yes agreement prescribed in the Rules) (Annex a copy in Folder F) BOTH PARTIES WILL PAY SAME AMOUNT OF PENALTIES ON THE DEFAULT Possession Date- September,2022 3. Gist of the important provisions of the Draft Agreement (Annex a copy in Folder F) ' hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. Signature of the Applicant / Authorised Representative Stamp Date FORM REP-| Part-G Projects launched by the promoter in last five years: (No Projects) hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. Signature of the Applicant / Authorised Representative Stamp Date FORM REP-| Pai SPECIFICATION OF CONSTRUCTION |Specification of apartments and other buildings including the following: FLOORING DETAILS OF IVARIOUS PARTS OF HOUSE [STONE / TILE FLOORING IN COMMON |AREAS WALL FINISHING DETAILS |CEMENT PLASTER & PAINT IN COMMON |AREAS 8 KITCHEN DETAILS INIA 4 [BATHROOM FITTINGS WHITE CHINAWARE WITH CP FITTINGS 5 [WOOD WORK ETC INIA 6 [DOORS AND WINDOS FRAMES [ALUMINIUM FRAMES WITH GLASS TTOUGHENED GLASS 6MM THICK AND 7 |ctass work ouct ELECTRICAL FITTINGS & FIXTURES NOT ls |evectRIc FiTTINGs Bares Jo [SONDUCTING AND WIRING [aye CONDUCTING WITH COPPER WIRING IDETAILS 10 |CUPBOARD DETAILS N/A 400K. FIRE TANK, 150KL DOMESTIC TANK, 1 JWATER STORAGE HS0KL RAW WATER TANK 2 [LIFT DETAILS Ho NOS HS |EXTERNAL GLAZINGS CURTAIN / STRUCTURAL GLAZING 3.1 |WINDOWS/GLAZINGS [ALUMINIUM FRAMES WITH GLASS ICOMMERGIAL FLUSH DOOR SHUTTERS / 4 Poors GLASS DOORS ICOMMERGIAL FLUSH DOOR SHUTTERS / 114.1 |MAIN DOORS COMMERCIAL f 14.2 INTERNAL DOORS ICOMMERGIAL FLUSH DOOR SHUTTERS / IGLASS DOORS 15 |AIR CONDITIONING |CHILLED WATER & DX SYSTEM 6 ELECTRICAL FITTINGS [ELECTRICAL FITTINGS & FIXTURES NOT PROVIDED M7 ICNG PIPE LINE INIA. 18, PROVISION OF WIFI AND IBROADBAND FACILITY \YES PROVISION IS THERE 9 EXTERNAL FINISHING/COLOUR ISCHEME PLASTER & PAINT, GLAZING, ACP / STONE ICLADDING \20 INTERNAL FINISHING ICEMENT / GYPSUM PLASTER IN COMMON |AREAS SPECIFICATION UNIT WISE it . LIVING/DINING/FOYER/FAMILY LOUNGE 4 |FLOOR INIA .2 WALLS INIA 1.3 [CEILING INIA 2. MASTER BEDROOM/DRESSROOM 2.1 |FLOOR INIA 2.2 |WALLS INIA 2.3 |CEILING INIA 2.4 |MODULAR WARDROBES INIA Is. MASTER TOILET 8.1 |FLOOR INIA 3.2 [WALLS INIA 8.3 [CEILING INIA. 8.4 [COUNTERS INIA 8.5 [SANITARY WAREICP FITTINGS INIA 8.6 |FITTING/FIXTURES INIA 4. BED ROOMS 4.1 |FLOOR INIA l4.2 |WALLS INIA l4.3 [CEILING INIA 4.4 |WARDROBES INIA 5. TOILET 5.1 |FLOOR INIA 5.2 [WALLS INIA 5.3 [CEILING INIA 5.4 [COUNTERS INIA 5.5 [SANITARY WAREICP FITTINGS INIA 5.6 |FIXTURES INIA 6 . KITCHEN 6.1 |FLOOR INIA j6.2 |WALLS INIA 6.3 [CEILING INIA 6.4 |COUNTERS. INIA 6.5 |FIXTURES INIA 6.6 |KITCHEN APPLIANCES INIA 7 . UTILITY ROOMS/UTILITY BALCONY/TOILET 7.1 |FLOOR INIA 7.2 WALLS & CEILING INIA 7.3 [TOILET INIA 7.4 [BALCONY INIA ls. SIT-OUTS jg.1 FLOOR INIA 8.2 |WALLS & CEILING INIA js.3 RAILINGS INIA 8.4 |FIXTURES INIA Thereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. Signature of the Applicant / Authorised Representative Stamp Date List of Uploaded Documents [Date of Re Document Description Pecument New ent 1 |SERVICE PLAN DRAWING-1 11-02-2020 2 |SERVICE PLAN DRAWING-2 11-02-2020 3 [SERVICE PLAN DRAWING-3 11-02-2020 4 |SERVICE PLAN DRAWING-4 11-02-2020 s NON DEFAULT CERTIFICATE FROMA CHARTERED |, 11.2919 [View \6 |SITE PLAN 122-411-2019 7 [BUILDING PLAN APPROVAL 122-411-2019 p PERIRAONSEFOEDEY EPOMTDUY besiaore Ra p OREO SROUOENSTSOUERORL —besvaore Ry HO [DETAIL OF PERMISSIBLE FAR i22-11-2019 [11 [REVISED BUILDING PLANS APPROVAL 122-411-2019 2 DETAIL OF COVERED AREA ACHIEVED FAR 122-411-2019 3. JENVIRONMENT CLEARANCE 122-117-2019 fa [COPY OF LICENSE ALONG WITH SCHEDULE OF lop 44.2049 iiaw 5 ZONING PLAN 22-11-2019 [ew [Document he [A COMPLETE SET OF THE LAST APPROVED a 7 [HEIGHT CLEARANCE i22-11-2019 118 [MINING PERMISSION [22-11-2019 19 |RERA REGISTRATION CERTIFICATE [23-11-2019 |20 |CONSENT TO ESTABLISH [22-11-2019 |21 |ARAVALI NOC [22-11-2019 |22 |FOREST NOC. [22-11-2019 |23 |NON-ENCUMBRANCE CERTIFICATE 11-02-2020 |24 |SERVICE PLAN DRAWING-5 11-02-2020 25 |ASSURANCE OF FRESH WATER SUPPLY \22-11-2019 26 CONSTRUCTION STP WATER FOR l22-11-2019 |27 |ASSURANCE OF ULTIMATE POWER LOAD \22-11-2019 |28 |ASSURANCE FOR SEWERAGE CONNECTION \22-11-2019 |29 |ELEVATION SECTION [22-11-2019 [30 |COPY OF THE BALANCE SHEET OF LAST 3 YEARS [23-11-2019 31 |PROJECT REPORT [22-11-2019 [32 |COPY OF THE DRAFT ALLOTMENT LETTER [22-11-2019 [33 |COPY OF THE DRAFT AGREEMENT [22-11-2019 - 34 avour. Sane COLONY, THE LATEST lo7-11-2019 Dew nent 35 INVENTORY SHEET (03-01-2020 36 |SERVICE PLAN ESTIMATE (03-01-2020 27 CORSON AS ANOS Ir azanz [38 JENTRY OF LICENSE IN REVENUE RECORD 11-02-2020 39 |FIRE SCHEME APPROVAL, 11-02-2020 |40 |LC-IV 11-02-2020 [41 |SERVICE PLAN DRAWINGS 12-02-2020 |42 |LOI 11-02-2020 |43 |SERVICE PLAN APPROVAL LETTER 11-02-2020 I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed. Signature of the Applicant / Authorised Representative Stamp Date

You might also like