This document outlines safety hazards and control measures for various activities involved in a pipe erection and equipment installation project. It identifies hazards such as protruding objects, sharp edges, slips/trips/falls, improper manual handling, welding fumes/gases/particles, untrained gas cutting operators, damaged grinding wheels, falls from height, and falling objects. Control measures include barricading work areas, using proper PPE, conducting toolbox talks and inspections, following permit procedures, and using certified lifting equipment and rigging plans. The goal is to minimize risks and protect workers from injuries like punctures, burns, lung disease, and fatalities during the project work.

Uploaded by

Naitik Desai48
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
354 views7 pages

JSA Machinal Piping

This document outlines safety hazards and control measures for various activities involved in a pipe erection and equipment installation project. It identifies hazards such as protruding objects, sharp edges, slips/trips/falls, improper manual handling, welding fumes/gases/particles, untrained gas cutting operators, damaged grinding wheels, falls from height, and falling objects. Control measures include barricading work areas, using proper PPE, conducting toolbox talks and inspections, following permit procedures, and using certified lifting equipment and rigging plans. The goal is to minimize risks and protect workers from injuries like punctures, burns, lung disease, and fatalities during the project work.

Uploaded by

Naitik Desai48
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Rev:-02

INDANA ENGINEERING PRIVATE LIMITED


01.

JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.

Project Name: - DIC India Limited @ Sayakha GIDC


Sr. No. ACTIVITIES HAZARD RISK CONTROL MEASURES
 Protruding
 Area to be hard barricaded and entry restricted
objects
 Bend down all nails / cover protruding objects with protection caps
Puncture injury  Back pain
to avoid any possible injury
 Sharp edges  Personal injury
 Step and ramp shall be provided for asses
1
Manual  Slip trip and  Puncture
 All asses and egress shall be clear from material, tools and equipment
handling falls  Damage
follow proper manual handling techniques
 Improper property
 plan the route to be taken while handling
manual  Electric shock
 Avoid twisting awkward positioning sufficient work space to be ensure
handling

 Work permit procedure should be followed


 Tool box meeting should be conducted
 Welding machine shall be inspected
 Proper PPE’s should be warned
 Health effect  Persons working should be trained
 Electric shock
 Lungs disease  Signboards / cautionary boards should be displayed at working location
 Fire
2  Fire explosion  Competent supervision is required at location
Welding work  Dangerous Fumes
 burn / eye  Good housekeeping is should be maintained at working location
& gases
injury  Working area should be barricaded & put sign board of ‘’ Hot work in
 Flying particles
progress ‘
 All flammable material should be removed before start the work
 Provide fire blanket If needed
 Provide fire extinguisher job location
 Electrical live Cable should not have any joint

Page:-1
Rev:-02

INDANA ENGINEERING PRIVATE LIMITED


01.

JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.

 Well ventilated area to be used for welding work


 Provide proper electrical connection through ELCB
 Provide job specific training all engaged person
 Work permit procedure should be followed
 Provide job specific PPE’s to engage workers
 Trained & experience holder person should be deploying to the work
 Burn injury
 Tool box meeting should be conducted
 Serious injury
 Gas cutting set should be inspected before use
 Untrained  Burn injury
 Provide flash back arrester to cylinder both side
operator/  Lungs
Gas Cutting  Both cylinders should have kept always in vertical position on trolley
person disease
3 proper chain.
work  Explosion  Loose of  Check against hose pipe for gas leakage with soap water
 Back fire properties  Ensure that valve protection to fitted on cylinder
due to fire  Working area should be barricaded & put sign board of ‘’ Hot work in
Lungs disease progress ‘
 Provide fire extinguisher job location
 Provide job specific training to all engaged person
 Work should be going under supervision
 Check grinding wheel expiry date
 Check grinding wheel clean & dry before test.
 Personal
Grinding work  Grinding wheel mounted by only trained worker according to
4 injury
Inspection of  Crack Out/ manufactures instructions.
 Damage
Cutting, damaged wheel  Ensure speed of grinding wheel should not less than speed of grinding
properties
grinding wheel m/c
 Electric shock
 Only inspected m/c, wheels shall be used
 Ensure protective guard is in place.

Page:-2
Rev:-02

INDANA ENGINEERING PRIVATE LIMITED


01.

JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.

 Tool box talk & briefly of JSA before start of job

 Fatality  Appropriate PPEs


 Burn
 Fall of  Use of full body harness
 Personal
personnel
injury  Ensure proper hook up of full body safety harness / Shock absorber

 Proper rigging plan & certified lifting gears


Erection /  Area barricading and safety signs
5
Dismantling of  Cut hand / leg
existing  Damage  Nut & bolt to be shifted in proper bags
structure, piping property
 Falling and  Do not throw tolls and spares
and equipment  Eye injury
damaging of
material /  Tools to be tied with rope while work at height
tools
 Use of chain strip while working at height

 Close monitoring by competent supervisor

Page:-3
Rev:-02

INDANA ENGINEERING PRIVATE LIMITED


01.

JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.

 Trip / Asses  Giddiness  All material to be stacked properly


blocked
 Tiredness  All the asses / ways must be open in case of emergency (Emergency exit
poster to be posted.
 Giddiness
 Material to be barricaded

 Other  Certified lifting tools and equipment


diseases and  Certified crane operator
 Dropping of health  Area barricading + safety signs
load during problems  No personal under suspended load
lifting  Close monitoring by competent supervisor

Erection of steel  Slip / trip  Check position of crane and trailer


structure piping  Fatality  Experience & certified crane operator and signal man compact the
and equipment  Personal ground
 Swinging of injury  Approve rigging plan
load  Damage  Two man with tag line for control load movement
property  Close monitoring by area supervisor
6
 No work during high wind and rain
 Area barricaded for crane and load movement
 Fatality  3rd party certified crane and lifting tools
 Equipment  Damage  Crane and lifting tools inspected by SK

Page:-7
Rev:-02

INDANA ENGINEERING PRIVATE LIMITED


01.

JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.

failure property  Qualified crane operator and signal man


 Eye injury
 Personal injury  The flange joints shall be visually checked before starting hydro test,
 Blasting of
 Damage water testing area martial’s covered, hydraulic machine inspected
7 pipes and
Hydrotesting property  Water testing area barricading, housekeeping team ready for water
blown out of
leakage cleaning
blinds
 Lungs disease  Adequate ventilation
 Inhale fumes
 Provide rubber hand gloves and face shield while painting down hand
8 Pipe painting  Skin irritation  Burn
 Rubber hand gloves & goggles to avoid direct contact to paint
 Eye injury
 Scattered  Slip & trip  Arrange the recovery and safe disposal of spent grit.
House keeping
9 materials  Ensure proper wind up of equipment, tool and tidiness of the work area.
And windup

In case of  Confusion  Personal  Give awareness about emergency evacuation plan, keep emergency
10
Emergency injury contact number. Aware about assembly point
 Loose hose  Slip & trip  Ensure uncoiled hoses will not be a tripping hazard.
 Ensure there are no kinks, cracks or damage to hoses.
 Gas leak  Explosion  Ensure adjustment screws on regulators are backed off.
11 Argon Welding  Check against hose pipe for gas leakage with soap water
 Provide flash back arrester to cylinder both side
 Dangerous  Health effect  Persons working should be trained
Fumes & gases  Lungs disease  Manage the work hours and duration to minimize fatigue

Page:-8
Rev:-02

INDANA ENGINEERING PRIVATE LIMITED


01.

JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.

 Fire  Fire explosion  Work permit procedure should be followed


 Tool box meeting should be conducted
 Welding machine shall be inspected
 Proper PPE’s should be warned
 Competent supervision is required at location
 Good housekeeping is should be maintained at working location
 Working area should be barricaded & put sign board of ‘’ Hot work in
progress
 All flammable material should be removed before start the work
 Provide fire blanket If needed
 Provide fire extinguisher job location
 Personal  Health effect  While working blaster should wear blasting hood.
injuries  Lungs disease  Starting the operation the helmet, visor, breathing tube respirator hose,
 Fire explosion air enter ports and fittings must be thoroughly inspected and cleaned of
 burn / eye all dust and debris.
injury  Draining the moisture from the filter every four hours.
Sand Blasting by
12 pneumatic blast Area to be barricaded by ac sheets appropriately. Sign board to be
gun.  Area to be barricaded by ac sheets appropriately. Sign board to be
provided.
 “NO UNAUTHORISED ENTRY” board to be displaced at visible places.
 Deploy only the trained and experienced persons only.
 Standard Chicago Coupling with proper washers. and additional clamps

Page:-9
Rev:-02

INDANA ENGINEERING PRIVATE LIMITED


01.

JOB TITLE – Erection Of Pipes At Spool Over The Pipe Rack, Equipment Installation & Touch Up Paint
.
.

 Cleaning of the nozzle during the blasting to be avoided.

 Bursting of  Incorrect  First stop the Compressor.


hose installation  Close the valve at the compressor end take off point for any change over
 Material and do not remove the hose under pressure
fatigue
 Whiplash arrestor must be fitted.
 External
damage  Check the condition of hose on daily basis.
 Flying of the  Irritation of  All persons working in the area should wear dust musk & ear plugs
dust the eyes during the operation.
 Coughing  Proper ventilation, exhaust fan shall be provided.
 Sneezing
 Medical health checkup of workers to be carry out in regular interval.
 Maintain the good housekeeping
 Generation of  Fire explosion  Keep fire extinguisher near the work spot / compressor
sparking  Provide earthling to the job.
 Hitting of the  Personal injury  No horseplay.
jet against  Damage  “NO UNAUTHORISED ENTRY” board to be displaced at visible places.
person property
13 Spray painting
 Gas release.  Explosion  Ensure adjustment screws on regulators are backed off.
 Check against hose pipe for gas leakage with soap water
 paint, oil spills.  Slip & trip  Check and clean any paint oil / grease spill / deposition on working area.

Prepared By Checked by Approved By