# Units per man-hour % Production schedule attainment % Slow moving stock # Production plants % Recovery
yield rate of returned products % Production uptime % Production schedule adherence # Ideal run rate # Production
capacity % Machine utilization in production % Production capacity utilization % Unplanned maintenance # Decoupling
stock # Frequency of production delays due to inventory shortages or supply delays # Unused production capacity $
Production costs per unit # Unit production time # Working stock % Products for which common production processes
are used % Production delays due to raw material shortage $ Value of work in progress % Work in progress days
% Unplanned downtime in production $ Penalties cost due to unsatisfied demand % Boomerang return rate # Units
per man-hour % Production schedule attainment % Slow moving stock # Production plants % Recovery yield rate
of returned products % Production uptime % Production schedule adherence # Ideal run rate # Production capacity
% Machine utilization in production % Production capacity utilization % Unplanned maintenance # Decoupling
stock # Frequency of production delays due to inventory shortages or supply delays # Unused production capacity
$ Production costs per unit # Unit production time # Working stock % Products for which common production
processes are used % Production delays due to raw material shortage $ Value of work in progress % Work in progress
days % Unplanned downtime in production $ Penalties cost due to unsatisfied demand % Boomerang return rate
This report is the result of primary research conducted by the KPI Institute. It is available in PDF format on the smartKPIs.com
website. Terms of use available at: http://www.smartkpis.com/terms-of-use.html (‘Premium content terms’).
Indemnity statement
The KPI Institute has taken due care in preparing the analysis contained in this report. However, noting that some of the data
used for the analysis has been provided by third parties, The KPI Institute gives no warranty to the accuracy, reliability, fitness
for purpose, or otherwise of the information. The KPI Institute shall have no liability for errors, omissions or inadequacies in the
information contained herein or for interpretations thereof. The opinions expressed herein are subject to change without notice.
For the latest version of the documentation, smartKPIs Premium should be consulted.
Published by:
www.kpiinstitute.org | www.smartKPIs.com
Table of Contents
page 2 Executive Summary
3 About Key Performance Indicators (KPIs)
4 KPIs ... Naturally
6 smartKPIs.com Community Profile
8 2011-2012 smartKPIs.com Functional Areas Taxonomy
9 2011-2012 smartKPIs.com Industries Taxonomy
10 KPI Documentation Form Explained
12 Production as a Functional Area
13 Top 25 Production KPIs of 2011 List
14 # Units per man-hour
16 % Production schedule attainment
18 % Slow moving stock
20 # Production plants
22 % Recovery yield rate of returned products
24 % Production uptime
26 % Production schedule adherence
28 # Ideal run rate
30 # Production capacity
32 % Machine utilization in production
34 % Production capacity utilization
36 % Unplanned maintenance
38 # Decoupling stock
40 # Frequency of production delays due to inventory shortages or supply delays
42 # Unused production capacity
44 $ Production costs per unit
46 # Unit production time
48 # Working stock
50 % Products for which common production processes are used
52 % Production delays due to raw material shortage
54 $ Value of work in progress
56 % Work in progress days
58 % Unplanned downtime in production
60 $ Penalties cost due to unsatisfied demand
62 % Boomerang return rate
64 Appendix A: Related reports
66 Appendix B: Training courses
68 Appendix C: Advisory services
70 Appendix D: Technology solutions
72 Appendix E: Glossary of terms
Executive Summary
Given the economic context and the competitive market nowadays, organizations increasingly focus on managing and measuring performance
as a key component in achieving the desired performance results for generating business value. Key Performance Indicators (KPIs) represent
a critical element for any performance management strategy in today’s challenging environment and many organizations have diverse
performance management initiatives, including the measurement of results against targets by using KPIs.
To provide a glimpse into the use of KPIs in practice, smartKPIs.com has launched in March 2011 the first edition of a series of reports
dedicated to analyzing the most popular KPIs across major functional areas and industries. The Top KPIs report series, now at second
edition, are a synthesis of what smartKPIs.com is all about: they form an overview of how KPIs are used in practice today, by combining input
from the online community with analysis and insights from our research team.
The Top 25 Production KPIs of 2011-2012 report compiles the most popular 25 KPIs used by the Production function. The methodology used
to conduct the research consisted of ranking the KPI examples published in the Production functional area of smartKPIs.com, based on their
number of views in 2011. The hundreds of thousands of visits to smartKPIs.com and the thousands of KPIs visited, bookmarked and rated
by members of this online community in 2011 provided a rich data set, which combined with further analysis from the editorial team, formed
the basis of these research reports. Out of more than 97 Production KPIs available on smartKPIs.com, the 25 most viewed by the members
and visitors of smartKPIs.com were selected and analysed in detail in this report.
Production Efficiency 7
Top 5 Production KPIs of 2011-2012
Production Timeline 7 # Units per man-hour
% Production schedule attainment
Inventory 5
% Slow moving stock
Maintenance 3 # Production plants
Production Costs 3 % Recovery yield rate of returned
Production KPIs are reflective of production related functions and are grouped into subcategories, such as Production Efficiency, Production
Timeline, Inventory, Maintenance and Production Costs. From these subcategories, Production Efficiency, Production Timeline and Inventory
indicators were the most popular of Production, in 2011. This illustrates that optimizing the efficiency within production based organizations
while maintaining a high level of productivity is an area of interest for many organizations.
One of the most important benefits that this report brings is the international perspective it offers on the most popular KPIs for Production
Management. Production KPIs provide quantifiable measurements of factors determined to be important for Production strategy successful
implementation. The skill in applying KPIs is in the selection of the optimum number and appropriateness of KPIs.
While centered around the KPIs that in 2011 received the highest number of visits on smartKPIs.com, the Top KPIs of 2011-2012 reports
contain in addition to KPI names, a detailed description of each KPI, as documented in smartKPIs Premium (the premium content section of
smartKPIs.com) and other relevant content.
By discussing the use of KPIs today, presenting the best practice in documenting them and listing the most popular KPIs of 2011, the Top
25 Production KPIs of 2011-2012 report is a valuable resource in promoting the informed use of KPIs or refreshing the existing performance
measurement and management practice in any organization.
Both academic and practitioner literature uses interchangeably these terms, oftentimes even within the same organization.
Measure - A number or a quantity that records a directly observable value. All measures are composed of a number and a unit of measure.
The number provides magnitude (how much) for the measure, while the unit gives the number a meaning (what). Examples of unit
measures are: dollars, hours, meters, inches, etc.
Indicator - Indicators are defined in many ways, but the common meaning for all of them is that they refer to specific information. Thus, the
Organisation for Economic Co-operation and Development (OECD) defines an indicator as “a qualitative or quantitative factor or variable
that provides a simple and reliable means to measure achievement, to reflect changes connected to an intervention, or to help assess the
performance of a development actor”.1
Metric, Performance Measure or Performance Indicator - A generic term encompassing the quantitative basis by which objectives are
established and performance is assessed. It helps quantify the achievement of a result, the quantifiable component of an organization’s
performance. In the context of measuring and managing performance these terms are used interchangeably.
Key Performance Indicator (KPI) - A selected indicator considered key for monitoring the performance of a strategic objective, outcome,
or key result area important to the success of an activity and growth of the organization overall. KPIs make objectives quantifiable,
providing visibility into the performance of individuals, teams, departments and organizations and enabling decision makers to take action
in achieving the desired outcomes. Typically, KPIs are monitored and communicated through dashboards, scorecards and other forms of
performance reports.
While on paper the terms listed above can be differentiated, in practice, the difference between them is blurred and, at some extent,
irrelevant. As long as their purpose and use is clear and understood by members of the organization, whether they are called performance
measures or KPIs is a matter of preference.
At smartKPIs.com, we assess each example entered in the online database and label it as measure, performance indicator or KPI. It is an
empirical and subjective approach to catalogue each entry based on relevance. Ultimately, all entries in the online database are considered
KPI examples. In addition, to single out the entries that stand out in terms of relevance, we introduced a new label:
• Fulfillment of the criteria of how good KPIs should be defined and used.
1. Organisation for Economic Co-operation and Development, 2002, Glossary of Key Terms in Evaluation and Results Based Management, OECD
Publications, Paris, France
KPIs … Naturally
Measurement as a human activity is not new. It emerged in early history as a mean for discovery and sense making.
Archaeologists consider the first measurement tool used in human history to be the Lebombo bone, a baboon fibula
containing 29 cut notches. Dated 35,000 BC, this tally stick was discovered in the Lebombo mountains in Swaziland.
Evaluation, as a form of measurement was used as early as the 3rd century AD, when emperors of the Wei Dynasty
rated the performance of the official family members. The biased nature of individual performance evaluation was
noticed by Chinese philosopher Sin Yu, who reportedly criticized a rater employed by the Wei Dynasty with the
following words: “The Imperial Rater of Nine Grade seldom rates men according to their merits, but always according
to his likes and dislikes”.
A major milestone in making the connection between measuring as a human activity and performance was in
1494, when Luca Pacioli published in Venice ‘Summa de arithmetica, geometrica, proportioni et proportionalita’ (‘Everything on arithmetic,
geometry, proportions and proportionality’). It detailed a practice the Venetian sailors had in place to evaluate the performance of their sailing
expeditions, which became the basis of the double-entry accounting system.
In time, the subjective nature of individual performance evaluations and the dominance of financial indicators for evaluating enterprise
performance became stepstones for performance management in human activities.
The industrial revolution added to this combination the “organization as a machine” metaphor that played a major role in driving improvements
in efficiencies and effectiveness. The result was an organizational performance management model based on mechanistic, command-and-
control thinking, driven by subjective individual performance assessments and financial indicators and crowned by pay-for-performance
arrangements.
Did it work? To a certain extent, yes. Many organizations flourished and matured based on this model.
Does it have flaws? Many. And while historical circumstances attenuated them in time, today’s environment amplifies and exposes them at
an accelerated rate.
Is there a better way? Yes, but it is not simple. It requires a change at multiple levels, from the underlying philosophy of performance, to
mentalities and processes. This is not easy.
Over time, the use of Key Performance Indicators (KPIs) became synonym to performance measurement and management. KPIs are the
link between the old and the new in performance management. Their use, however, is much richer and rewarding in an environment based
on organic performance architecture principles:
Organizations are echo-systems in their own right. They vary in terms of maturity and the environment in which they operate. As such,
their use of performance management systems should reflect their own “personality”. You can try to build an igloo in Sahara, but it won’t be
sustainable. The performance architecture of each organization needs to be unique and to reflect its internal and external environment.
Systems thinking provides a much richer context for understanding and improving performance. Command-and-control worked
in time for the army, for increasing productivity of unskilled workers during the industrial revolution and for managing large organizations
(such as the public service). Today, knowledge workers form the majority of the workforce in developed economies, operate in a much more
interconnected environment and have to make decisions at an accelerated pace. Understanding the systems in which we operate, analyzing
flow and learning based on data become ever more important today and complement the traditional simplistic managerial approach of
executing orders from above.
KPIs should be used primarily for learning. The role of KPIs should be the one of providing the required information to assist in navigating
towards the desired results. The same principle is used by ants, who leave pheromone trails to assist each other in navigating towards the
food source. Similarly, the nerve impulses travel through the different points of the nervous system, transmitting information. KPIs results
should travel through the organization, facilitating communication, providing a base for analysis / synthesis and ultimately decision making
across all levels of the organization.
Data accuracy in human administration is an elusive desideratum. Neils Bohr once said: “Accuracy and clarity of statement are mutually
exclusive”. Accuracy is a challenge in exact sciences and even more in human administration. Striving to obtain any KPI data is a challenge
in itself for many organizations and data accuracy is an even bigger ask. The use of KPIs should acknowledge this aspect and be oriented
towards making the most out of existent data, oftentimes by using variance intervals. This approach is used by the human body. If the
temperature drops under a safe limit, we shiver. If the temperature increases, we sweat. Both are performance improvement initiatives of the
body, aimed to regulate its temperature back to safe limits. The KPI here is the temperature. While it is not a constant, its trend is good when
within certain safe limits.
The use of KPIs for rewards and punishment should be limited and driven by self-assessment. Purposeful oriented behavior is a
characteristic of living organisms. For humans and many other species, this behavior is amplified by rewards and punishment. Along with this
amplification, risks are amplified, too. Gaming of results, lack of cooperation, decreased morale and work accidents are some of the undesired
consequences. On the other hand, the majority of nerve impulses in the human body transmit general information. Only in particular situations
pleasure or pain signals. Similarly, the use of KPIs for rewards and punishment should be the exception to the rule, rather than the norm.
Embedding KPIs in organizations through visualization and communication of KPIs results is the key to maximizing their value
added. Variations in the KPIs used by the human body are felt by our senses as their impact is sensory rich. Similarly, KPIs used in
an organizational context should be embedded in everyday use and be a part of the working experience. The most important aspect of
communicating KPI results is their visual representation. This is key, both in terms of optimizing the layout of the data representation and
the presence of visual displays in the working environment. The range of media is diverse today: posters, whiteboards, banners, LED and
LCD monitors should be combined to bring results to life across the organization. KPI results should not be restricted to paper reports and
computer screens anymore.
New philosophy of performance, driven by self-assessment and purposeful achievement as a mean to happiness. While happiness
means many things to many, a common expression of this feeling is the result of the purposeful achievement of a desideratum. Achieving
something we want, while shared with others, is about us and reverberates strongly in our inner self. Transposing this powerful catalyst of
performance in both our personal and organizational life is facilitated by a new paradigm: Happiness is driven by achievement. Achievement
is an expression of performance. If we want to be in control of our happiness, we should be in control of our performance.
Self-assessment of performance results is not easy. However, if more emphasis is placed on building this capability in each employee,
organizations can benefit by creating a rewarding environment conducive to happiness. In this environment, managers can focus on
understanding and improving the working system, while employees can focus on self-assessment of the results’ achievement, learning and
communicating. Purposeful achievement of results in a well-structured working system would bring both individuals and organization much
closer to happiness and fulfilment compared to the payment of bonuses in the current command-and-control driven dominant paradigm.
KPIs are here to stay. The question we have to answer is how do we want to use them: mechanistically or naturally?
Aurel Brudan,
Performance Architect
smartKPIs.com
What sets the smartKPIs.com community apart is the profile of its members.
smartKPIs.com is a truly global community, with relatively uniformly spread representation in terms of membership around the world. While
the highest number of members comes from English speaking countries, no single country dominates in terms of representation. The
same applies in terms of the size of the organizations to which smartKPIs.com members belong. While membership is the highest among
companies with 11 to 500 employees, both small and large organizations in terms of headcount are well represented.
Country breakdown
43.90%
15.79%
13.09%
5.76% 7.32%
2.19% 2.21% 2.32% 2.82% 2.93% 3.85%
South Saudi Indonesia Canada United Arab Malaysia United Australia India United Others
Africa Arabia Emirates Kingdom States
Organization size
11-100 employees 20.17%
Self-employed 7.87%
Unspecified 0.79%
Industry affiliation
Food, Beverages & Tobacco 1.78%
Not-for-profit 1.90%
Government - State & Federal 2.00%
Construction / Capital Works 2.32% In terms of industry affiliation, the majority
Energy 2.79% of smartKPIs.com community members
Banking, Mortgages & Credit 3.19%
Engineering 3.53% operate in the consulting industry. The ICT,
Retail 3.67% manufacturing and education / training
Transportation / Logistics 3.73%
Telecommunications 3.80%
sectors follow in this hierarchy, which also
Finance 3.93% reflects wide interest from both the public
Healthcare
Other professional services
4.27%
4.65%
and not-for-profit sectors.
Education / Training 5.23%
Manufacturing 9.24%
Technology 9.90%
Consulting 12.72%
Other 21.36%
Job title
Engineer 2.83%
Manager 23.77%
Other 43.70%
Managerial role
QA Manager 0.79%
Product Manager 1.00% Overall, the profile of the smartKPIs.com
Quality Manager 1.17% community paints the picture of a global,
Marketing Manager 1.20%
diverse and highly qualified membership
Finance Manager 1.47%
base. Tapping into the collective
Operations Manager 1.51%
Sales manager 1.67%
intelligence of this community by analyzing
Senior Manager 1.70% visit trends is a reflection of both trends in
General Manager 2.39% performance management at international
IT Manager 4.45% level across industries / functional areas
Project manager 5.45% and of the relevance of the smartKPIs.com
HR Manager 6.01%
content.
Manager 19.95%
Other 51.26%
Key Performance Indicator (KPI) example unique Classification of performance indicators based Type of measurement unit to reflect results
identification number assigned
Name automatically
Functional Areas on their relevance
Sub-categories and level of analysis. Industries (number, percentage, monetary value).
when entered in the database.
%
N/A Hospital bed occupancy rate
Hospitals Healthcare
KPI record Indicator type Unit type
Name of the indicator, a brief
sK41 Succinct
smartKPI description of the indicator, % Other versions of the indicator name, as
Definition and variations
representation of its role. clarifying in business terms its name. used in practice.
Definition
Name
Measures the percentage
Functional Areas of beds in the hospital that are occupied by patients, from overall number of hospital
Sub-categories beds.
Industries
%
N/A Hospital bed occupancy rate
Hospitals Healthcare
Variations
KPI record Indicator type Unit type
% Bed occupancy rate - long-term patients
Definition and variations
% sK41
Bed occupancy rate - short-term patients smartKPI %
Definition
Related KPIs
#Name
Hospital the
Measures bedpercentage
capacity of beds in the hospital that are occupied by patients, from overall number of hospital beds.
$ Hospital operating profit per bed
% Hospital bed occupancy rate
#Variations
Functional
Hospital Areas rate per 10,000 inhabitants
admission Sub-categories Industries
% N/A
Bed occupancy rate - long-term patients Hospitals Healthcare
Tags
Definition
% KPI
Bed andrate
occupancy variations
- short-term patients
record Indicator type Unit type
hospital, occupancy
sK41 smartKPI %
Related KPIs
Definition
# Hospital bed capacity
Calculation
Measures the percentage of beds in the hospital that are occupied by patients, from overall number of hospital beds.
$ Hospital operating profit per bed
Name
#Subordinate
Hospital admission rate used
per 10,000 inhabitants
Variations measures for calculation
%
A % Hospital bed occupancy rate
=Bed occupancy
# Hospital
Tags rate -beds
inpatient long-term patients
occupied
% =Bed
B occupancy
# Hospital rate -beds
inpatient short-term patients
hospital, occupancy
Definition and variations
Related KPIs
List of other related indicators in the
Calculation
Calculation
# Hospital
database,
formula
bed capacity
either upstream (influenced
Formula type KeywordsTrend
relevant to thewhen
is good indicator, useful for navigating
by this indicator), or downstream
$ Hospital (with
Definition
(A/B)*100 influence
operating on bed
profit per this indicator). Rate by thematic clusters of similar examples.
Increasing
#Measures
Subordinate the measures
percentage
Hospital admission of beds
rate used
per forin
10,000 the hospital that are occupied by patients, from overall number of hospital beds.
calculation
inhabitants
Names of the measures TagsA =
used# Hospital inpatient
in calculating
Focus beds occupied
Variations
B = # Hospital inpatient beds
the indicator (if applicable).
% Bed occupancy
hospital, occupancyrate - long-term patients
Purpose
% Bed occupancy rate - short-term patients
To indicate the
Calculation hospital’s efficiency regarding bed management
formula Formula type and its spare capacity. Trend is good when
Calculation
Related KPIs
(A/B)*100
BSC perspective Rate
Measurement focus Increasing
Impact stage
# Hospital bed capacity
Subordinate measures used for calculation
Customer Volume Process
$ Hospital operating profit per bed
A Focus
#= # Hospital
Hospital
Indicator
inpatient
admission
focus
beds
rate peroccupied
10,000 inhabitants Measurment type Level
B = # Hospital inpatient beds
Leading
Purpose
Tags Quantitative Strategic
To indicate
hospital, the hospital’s efficiency regarding bed management and its spare capacity.
occupancy
Calculation formula Formula type Trend is good when
BSC
Data profile
perspective Measurement focus Impact stage
(A/B)*100
Calculation Rate Increasing
Customer Volume Process
Data capture period Standard reporting frequency Data integrity
as Focus
Expresses the indicator Indicator
a formula linking
Subordinate
Spot focusmeasures used for calculation DailyType of calculation
Measurment type formula, based on the combination
Level
High of Direction in which the results of the indicator
the subordinate measures
A =(if# applicable).
Leading Hospital inpatient beds occupied
Automation fit
subordinate measures (rate, ratio, index, composition).
Quantitative
Limitations
Strategic need to move for a positive result.
Purpose
B = # Hospital inpatient beds
Recommended
To Accurate reporting
indicate the hospital’s efficiency regarding bed management for this
and its spare KPI requires real-time registration of inpatients, so that no lag exists
capacity.
Explanation of the reason or business
Data profile Classification
between the actualofhospitalization
performance (and
indicators based onofwhat
the occupancy Strength
the bed) and registering it inofthe
thebed
indicator based on the stage of
justification for using theBSC perspective
indicator.
Calculation formula
Measurement
dimension
management
Formula
focus Impact stage
of an activity or result they are measuring.
typesystem. Trend is good when evaluation: input, process, output or outcome.
Customer
Data capture period Volume
Standard reporting frequency Process
Data integrity
(A/B)*100 Rate Increasing
Spot
Indicator focus Daily
Measurment type High
Level
Focus fit
Leading
Automation Quantitative
Limitations Strategic
Recommended Accurate reporting for this KPI requires real-time registration of inpatients, so that no lag exists
Purpose
Standard Balanced Data profile between the actual hospitalization (and the occupancy of the bed) and registering it in the bed
To indicate the hospital’s efficiency regarding bed management
managementand its spare capacity.
system.
Scorecard perspective
where the indicator BSC perspective
Data capture period Measurement
Standard focusfrequency
reporting Impact
Data stage
integrity
fits best. Customer
Spot Volume
Daily Process
High
Indicator focus
Automation fit Measurment type
Limitations Level
Leading
Recommended Quantitative
Accurate reporting for this KPI requires real-timeStrategic
registration of inpatients, so that no lag exists
between the actual hospitalization (and the occupancy of the bed) and registering it in the bed
management system.
Type of indicator based on the emphasis
Data profile of Measurement approach for the KPI Organizational level at which the indicator is
past activity or future performance. (Quantitative or qualitative). measured (strategic or operational).
Data capture period Standard reporting frequency Data integrity
Spot Daily High
Focus
Data profile
Suitability for automated data gathering by importing Other limitations (data or reporting system related) to be
data in the centralized reporting tool. considered during the use of the indicator.
Subjective evaluation of the suitability for benchmarking Additional information related to the Thresholds outlining the limits for positive and
based on indicator reporting standardization in the industry. target setting for this indicator. negative results, as well as the tolerance interval.
Targets
Statistics
Rating & bookmarking Views Last updated
smartKPIs
Rating (1/5)
Community 1780
Views 03 February
Last updated 2011
Other
Add popular KPI examples
rating (1/5) 1780
Share Save
03 February 2011
• # Average length of stay in ER
Add rating
• % Emergency Share admissions
Department visits resulting in hospital Save
• % Employee turnover
Rating button. smartKPIs Community Share button, for social media Option to save the indicator in a preferred list
Comments communication. available online at smartKPIs.com.
Other popular
smartKPIs KPI examples
Community
• # Average length of stay in ER
•Other popular KPI
% Emergency examples
Department visits resulting in hospital admissions
•%# Average
Employeelength of stay in ER
turnover
• % Emergency Department visits resulting in hospital admissions
Comments
• % Employee turnover
Comments
Other indicators saved in the preferred list along with the current Option to comment, provide feedback and engage with other members of the smartKPIs.com
example by smartKPIs.com community members. community on topics relating the documentation and use of the indicator.
Sub-categories
Production Efficiency - Ensures that the production locations are always running at full parameters.
Production Timeline - Indicates all the time-related aspects of the production process.
Inventory - Describes the amount of products on stock either from returns or demand, excluding the safety stock.
Maintenance - Monitors the upkeep of the production plant and equipment.
Production Costs - Refers to expenses implied by the production processes.
History
The production process refers to the stages required to complete a product. This generally involves the use of raw materials, machinery
and manpower. The main stages of production are pre-production, production and post-production. Throughout time, starting with foragers
and ending with industrialists, production methods have changed from complete labor intensive methods to extreme mechanical operation
methods. The Industrial Revolution between 1750 and 1850 has changed considerably production processes in agriculture, transportation,
mining and technology. As production processes changed mass production was possible through the development of the machine-tool
industry. A series of 19th century innovators introduced machine tools capable of cutting and shaping hard metals to precise tolerances,
which permitted the production of large numbers of identical parts. This system of production came to be called the American System, for it
was in the United States where it reached its fullest maturity. The development of mass production transformed the way work was organized
in several ways: first, tasks were subdivided and performed by unskilled workers, since machines were capable of performing advanced
operations. Second, with the development of manufacturing processes, a large hierarchy of supervisors and managers became necessary.
Third, the increasing complexity of operations required employment of engineers, accountants, chemists and other professionals, in addition
to a large distribution and sales force.
1
Functional Areas Sub-categories
sK443 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the number of completed units realized per hour of work. A man-hour is the amount of work done by one person in one hour.
Variations
# Units/MH
# Pieces per labor hour
Related KPIs
% Production first time yield (FTY)
Tags
construction, man-hour, productivity
Calculation
Focus
Purpose
To assess labor productivity in terms of output per man-hour.
Data profile
Targets
Threshold example
Red: <15 Yellow: 15-20 Green: >20
Overall notes
Along with the volume of units, the units/MH reporting method is one of the two basic reporting methods used in the construction and manufacturing
industries. This KPI can be influenced by factors unrelated to the labor force, such as equipment downtime, which can decrease man-hour productivity.
Additional resources
http://www.jstor.org/pss/4225514
http://books.google.com/books?id=KQToFyMfZdYC&printsec=frontcover&dq=Production+And+Operations+Management&hl=en&ei=upw9TY6yLIaI5AbJmLz
CCg&sa=X&oi=book_result&ct=result&resnum=1&ved=0CCcQ6AEwAA#v=onepage&q&f=false
References
1. Cox, R., Issa, R. and Ahrens, D. (2003), Management���s perception of key performance indicators for construction. Journal of Construction
Engineering and Management, 129(2): 142-151
2. Jawahar, L. and Srivastava, S. (2008), Cost Accounting. New Delhi: Tata McGraw-Hill
3. Murthy, P. R. (2005), Production And Operations Management. New Delhi: New Age International Publishers
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/units-per-man-hour-443.html
15
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
2
Functional Areas Sub-categories
sK1744 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures how much of the production schedule is actually achieved.
Variations
% Schedule attainment in production
Related KPIs
% Production delays due to raw material shortage
Tags
production plan tracking
Calculation
Focus
Purpose
To evaluate the production schedule attainment and accuracy.
Data profile
Targets
Threshold example
Red: <70% Yellow: 70-90% Green: >90%
Overall notes
Monitoring this KPI supports improvement in production planning and schedule attainment. Production changes should be monitored and documented for
root cause analysis, understanding accuracy and developing a plan for improvements.
Additional resources
Bragg, S. M. (2002), Business ratios and formulas: a comprehensive guide. John Wiley and Sons
http://www.ohcow.on.ca/press_release/RSI/RSI_day/2009/ROI.pdf
References
1. APQC (2007), Supply chain definitions and key measures, available at:
http://www.apqc.org/knowledge-base/documents/supply-chain-definitions-and-key-measures
2. Bakar, A., Hakim, L., Chong, S. and Binshan, L. (2004), Measuring supply chain performance among public hospital laboratories, International Journal of
Productivity and Performance Management, Vol. 59 Iss: 1, pp.75 - 97, available at:
http://www.emeraldinsight.com/journals.htm?articleid=1829560&show=html
3. Bragg, S. (2002), Business ratios and formulas: A comprehensive guide, New Jersey: John Wiley & Sons, Inc.
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/production-schedule-attainment-1744.html
17
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
3
Functional Areas Sub-categories
sK651 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Supply Chain, Procurement, Distribution Inventory Management Any
Production & Quality Management Production
Name
Definition
Measures the percentage of stock that has not moved in the defined number of days, out of the overall stock. The defined number of days are less than the
ones established for obsolete items.
Variations
% Slow moving stock rate
Related KPIs
% Obsolete items in inventory
Tags
inventory
Calculation
Focus
Purpose
To assess the inventory management capability. The slow moving stock can result into obsolete stock and generate financial losses.
Data profile
Targets
Threshold example
Red: >30% Yellow: 10-30% Green: <10%
Overall notes
Slow-moving items are still valuable. If letting them pile up for long periods of time, without producing profit, they become worthless. The emphasis should be
on selling them, even with lower prices. As a last resort, if the slow moving items cannot be sold and are in good condition still, they can be donated to charity
and realize tax advantages- where state allows it.
Additional resources
Dolgui, A., Morel. G. and Pereira, C. E. (2006), Information control problems in manufacturing. A Proceedings Volume from the 12th IFAC Conference,
Saint-Etinne, France, 17-19 May 2006, Elsevier, Oxford. UK
References
1. Burgd, H. B. (1985), Strategic identification of domestic air express markets: Assessing Alabama's market demand. The Alabama Business & Economic
Journal, 8(3): 13 - 24, available at: http://www.aum.edu/uploadedFiles/SBEJ_Vol8_3.pdf
2. HM Revenue and Customs (2012), BIM33145 - Stock: valuation: net realisable value: use of formulas, slow moving stock, acceptable accuracy, available
at: http://www.hmrc.gov.uk/manuals/bimmanual/bim33145.htm
3. Thummalapalli, R. (2010), A methodology to evaluate obsolete inventory in health care. Industrial and Management Systems Engineering - Dissertations
and Student Research, Paper 7, available at: http://digitalcommons.unl.edu/cgi/viewcontent.cgi?article=1008&context=imsediss
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/slow-moving-stock-651.html
19
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
4
Functional Areas Sub-categories
sK6834 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Manufacturing
Name
# Production plants
Definition and variations
Definition
Measures the number of manufacturing plants available and functional for production process.
Variations
# Manufacturing plants
# Breweries
# Plants for production
# Operational plants
Related KPIs
# Production capacity
Tags
production, manufacturing
Calculation
Focus
Purpose
To indicate the production capacity of the organization.
Data profile
Targets
Threshold example
Red: <1;>5 Yellow: 1-2;4-5 Green: 2-4
Overall notes
One instance for using this KPI is when the management needs to consider the optimal number of plants, in order to maintain effectiveness and efficiency of
resource allocation.
Additional resources
http://www.volkswagenag.com/vwag/vwcorp/content/en/the_group/production_plants.html
References
1. U.S. Environmental Protection Agency (1991), Alternative control techniques document - Nitric and adipic acid manufacturing plants, available at:
http://www.epa.gov/ttn/catc/dir1/nitric.pdf
2. The United States Department of Energy National Energy Technology Laboratory (2002), Hydrogen production facilities plant performance and cost
comparisons, available at: http://www.netl.doe.gov/energy-analyses/pubs/finalcompreport.pdf
3. U.S. Department of Energy (2012), Ethanol production and distribution, available at:
http://www.afdc.energy.gov/afdc/ethanol/production_starch_sugar.html
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/production-plants-6834.html
21
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
5
Functional Areas Sub-categories
sK6600 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Supply Chain, Procurement, Distribution Logistics / Distribution Manufacturing
Production & Quality Management Production
Name
Definition
Measures the percentage of product returns that were valued again, from overall returned products.
Variations
% Recovery yield rate
% Recovery yield
Related KPIs
% Final products which do not meet quality criteria
Tags
reverse logistics
Calculation
Focus
Purpose
To monitor the effectiveness of logistics supply of returned products.
Data profile
Targets
Threshold example
Red: <40% Yellow: 40-60% Green: >60%
Overall notes
This KPI may influence the repricing of the returned products. It is commonly used in industries like automobile manufacturing.
Additional resources
http://repub.eur.nl/res/pub/19888/StrategicIssues.pdf
References
1. Kulkarni, A. (2005), The impact of networked RFID on product remanufacturing, available at: http://www.autoidlabs.org.uk/presentations/AKCLSC.pdf
2. Ondemir, O. and Gupta, S. (2009), Cost-benefit analysis of sensor-embedded products based disassembly-to-order system, available at:
http://iris.lib.neu.edu/cgi/viewcontent.cgi?article=1012&context=mech_ind_eng_fac_pubs
3. De Boever, G. and Van de Velde, T. (2009), Organizing closed-loops for the retrieval of waste products: Reverse logistics, available at:
http://lib.ugent.be/fulltxt/RUG01/001/392/240/RUG01-001392240_2010_0001_AC.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/recovery-yield-rate-of-returned-products-6600.html
23
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
6
Functional Areas Sub-categories
sK1604 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
% Production uptime
Definition and variations
Definition
Measures the percentage of utilized operation time, from the planned available production time.
Variations
% Actual uptime
% Production availability utilization
Related KPIs
# Production operating time
Tags
production plan tracking
Calculation
Focus
Purpose
To indicate the utilization rate of the production plant availability.
Data profile
Targets
Threshold example
Red: <60% Yellow: 60-80% Green: >80%
Overall notes
Uptime can be calculated for individual operations also, this being very useful for identifying the time lost per individual operation.
Additional resources
http://www.sciencedirect.com/science/article/pii/S0895717705005418
References
1. Tapping, D., Luyster, T. and Shuker, T. (2002), Value stream management: Eight steps to planning, mapping, and sustaining Lean improvements. New
York: Productivity Press
2. Khan, R. and Sarker, A. (2002), An optimal batch size for a JIT manufacturing system, available at:
https://docs.google.com/viewer?a=v&q=cache:nSwE-moGy-oJ:citeseerx.ist.psu.edu/viewdoc/download?doi%3D10.1.1.95.2097%26rep%3Drep1%26type%3
Dpdf+%22%25+Production+uptime%22+site:edu&hl=en&pid=bl&srcid=ADGEESgjUaY1MFy4k3PythsCrw5ooN437pbpcYAH8g9GyOJ-jEie5bmpqB6VvDVC
ULEGKwLluXzG7ReUKZ8pVsM3lGEEbaDtAoYLpa6ceX2gOtfmiLkTTn0WjLz83Q4WriA2MmE07r1e&sig=AHIEtbRVP2tQuMiz0H21Sc2bzOM9ooJdIw
3. Nguyen, Q., Brammer, C. and Bagajewicz, M. (2008), New tool for the evaluation of the scheduling of preventive maintenance for chemical process plants,
available at: http://www.ou.edu/class/che-design/pub-papers/Preventive%20Maintenance%20Evaluation%28Nguyen%20et%20al%29-08.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/production-uptime-1604.html
25
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
7
Functional Areas Sub-categories
sK1627 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the absolute variance in actual production, as percentage of scheduled production.
Variations
% Production plan adherence
% Manufacturing plan adherence
Related KPIs
% Production orders finished ahead time
Tags
production plan tracking
Calculation
Focus
Purpose
To track the operational discipline in coordinating and executing a production process according with the planned schedule.
Data profile
Targets
Threshold example
Red: +/- (>15%) Yellow: +/- (10-15%) Green: +/- (5-10%)
Overall notes
This indicator can be measured both during and at the end of the production process for tracking the status of compliance with schedule.
Additional resources
http://books.google.ro/books?id=0ZD7rOWiYZEC&pg=PA437&lpg=PA437&dq=Production+schedule+adherence&source=bl&ots=gK0n3-8vlH&sig=gaKunm_
8D6CgI6LxCZTfpKlguG8&hl=ro&ei=bPBGS9DUEYSwnQOhr-jNCg&sa=X&oi=book_result&ct=result&resnum=8&ved=0CDAQ6AEwBw#v=onepage&q=Prod
uction%20schedule%20adherence&f=false
http://books.google.ro/books?id=dSz2-1KQcOkC&pg=PT133&lpg=PT133&dq=Production+schedule+adherence+formula&source=bl&ots=cVGC19VFVI&sig=
g94FNK94Ii0B_HJ72t4LCFmp0gM&hl=ro&ei=ivFGS9W4AZOKnQPfne3yAg&sa=X&oi=book_result&ct=result&resnum=9&ved=0CDcQ6AEwCA#v=onepage
&q=&f=false
http://www.taylor.com/about/news.php?&flag=3&news=40
http://www.tempe.gov/publicbodies/docs/council/SupportingDocuments/20090122fslg09a.pdf
References
1. Dalrymple, J. (2004), Performance measurement for SME growth - A business profile benchmarking approach, Second World Conference on POM and
15th Annual POM Conference, Cancun, Mexico, available at:
http://www.pomsmeetings.org/ConfProceedings/002/POMS_CD/Browse%20This%20CD/PAPERS/002-0164.pdf
2. SM Thacker and Associates (2012), Achievable benchmarks, available at: http://www.smthacker.co.uk/achievable_benchmarks.htm
3. Suri, V. (2010), Supply chain benchmarking process and methodology, available at:
http://www.conference-board.org/pdf_free/councils/TCBCP021.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/production-schedule-adherence-1627.html
27
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
8
Functional Areas Sub-categories
sK1738 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the theoretical ideal production rate, expected to achieve in optimal circumstances.
Variations
# Ideal production run rate
Related KPIs
# Unit production time
Tags
production plan tracking
Calculation
Focus
Purpose
To indicate the performance efficiency to reach the ideal state of production rate expected.
Data profile
Targets
Threshold example
Red: <70 Yellow: 70-90 Green: >90
Overall notes
Ideal production run rate is not necessarily the same with the maximum run rate of the machine, because the final output to achieve is the customer take
time.
Additional resources
http://books.google.ro/books?id=ci0e2WubJ0sC&pg=PA39&lpg=PA39&dq=ideal+run++rate&source=bl&ots=YgysG58mG1&sig=wgb0Ef0ZZYhyu-XFIZsotxqf
4DQ&hl=ro&ei=a1VGS7GpB4KgnQP4z_3_Ag&sa=X&oi=book_result&ct=result&resnum=10&ved=0CDwQ6AEwCQ#v=onepage&q=ideal%20run%20%20rat
e&f=false
References
1. Anderson, D. and Sweeney, D. (2010), Quantitative methods for business. Mason: South-Western Cengage Learning
2. Maskell, B. and Baggaley, B. (2004), Practical Lean accounting: A proven system for measuring and managing the Lean enterprise. New York:
Productivity Press
3. Office of Federal Procurement Policy (OFPP), Office of Management and Budget (OMB), Executive Office of the President (1998), A guide to best
practices for performance-based service contracting, available at: http://www.whitehouse.gov/omb/procurement_guide_pbsc
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/ideal-run-rate-1738.html
29
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
9
Functional Areas Sub-categories
sK1750 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
# Production capacity
Definition and variations
Definition
Measures the total volume of products that one plant or company can produce with its actual resources.
Variations
# Annual production capacity
Related KPIs
# Production plants
Tags
production efficiency
Calculation
Focus
Purpose
To indicate the volume of products a plant can produce.
Data profile
Targets
Benchmarking fit is suitable with manufacturing plants from the same industry, addressing similar
markets.
Threshold example
Red: <1000 Yellow: 1000-10000 Green: >10000
Overall notes
This KPI can be used in governmental statistics to calculate the industrial production capacity at national level per industry or product.
Additional resources
http://www.federalreserve.gov/releases/g17/
References
1. U. S. Energy Information Administration Independent Statistics and Analysis (2012), Short-term energy outlook, available at:
http://www.eia.doe.gov/emeu/steo/pub/cf_tables/steotables.cfm?periodType=Annual&startYear=2004&startMonth=1&endYear=2008&endMonth=12&tableNu
mber=7
2. U.S. Census Bureau (2006), Annual survey of Plant Capacity Utilization (PCU), available at: http://www.census.gov/econ/overview/ma0500.html
3. Congressional Budget Office (2008), U.S. policy regarding pandemic-influenza vaccines, available at:
http://www.cbo.gov/ftpdocs/95xx/doc9573/Chapter3.7.1.shtml
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/production-capacity-1750.html
31
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
10
Functional Areas Sub-categories
sK1631 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the utilization level of the machines and equipment capacity in production.
Variations
% Capacity / machine utilization
% MU
Related KPIs
# Daily production
Tags
production efficiency
Calculation
Focus
Purpose
To provide an indication of the efficient utilization of the machines and equipment within the production process.
Data profile
Targets
Threshold example
Red: <80% Yellow: 80-90% Green: >90%
Overall notes
The capacity utilization is an economic concept that shows the relationship between actual output produced and the potential output that could be achieved
assuming that current equipment remains constant- 100% indicates "full capacity".
Additional resources
http://www.springerlink.com/content/t2j4l5n73h53265r/
References
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/machine-utilization-in-production-1631.html
33
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
11
Functional Areas Sub-categories
sK1752 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the percentage of the production volume actually realized, from the total production capacity.
Variations
% Plant production capacity utilization
Related KPIs
% Lost manufacturing capacity
Tags
production efficiency
Calculation
Focus
Purpose
To assess the utilization level of the production capacity.
Data profile
Targets
Threshold example
Red: <80% Yellow: 80-90% Green: >90%
Overall notes
The capacity utilization is an economic concept that shows the relationship between actual output produced and the potential output that could be achieved
assuming that current equipment remains constant- 100% indicates "full capacity".
Additional resources
References
1. U.S. Census Bureau (2006), Annual survey of Plant Capacity Utilization (PCU), available at: http://www.census.gov/econ/overview/ma0500.html
2. Upadhyaya, S. (2010), Harmonization of statistical methods related to measurement of production capacity utilization, available at:
http://webcache.googleusercontent.com/search?q=cache:2NN-jouNpzcJ:unstats.un.org/unsd/industry/meetings/china2010/AC215-21.PPS+%22%25+Produc
tion+capacity+utilization%22&cd=10&hl=en&ct=clnk
3. U. S. Energy Information Administration Independent Statistics and Analysis (2012), Short-term energy outlook, available at:
http://www.eia.doe.gov/emeu/steo/pub/cf_tables/steotables.cfm?periodType=Annual&startYear=2004&startMonth=1&endYear=2008&endMonth=12&tableNu
mber=7
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/production-capacity-utilization-1752.html
35
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
12
Functional Areas Sub-categories
sK1606 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
% Unplanned maintenance
Definition and variations
Definition
Measures the percentage of maintenance activities that are unplanned and due to spontaneous occurrence, from overall maintenance activities.
Variations
% Unplanned versus planned maintenance
Related KPIs
% Laptop rebuilds to address stability issues
Tags
production plan tracking
Calculation
Focus
Purpose
To indicate the effectiveness of the maintenance planning, as the costs of unplanned maintenance can be even two times more than the planned one.
Data profile
Targets
Threshold example
Red: >30% Yellow: 10-30% Green: <10%
Overall notes
Maintenance might not be easy to predict, however some activities can be based on past performance. A high level of unplanned maintenance can be due to
unexpected situations, therefore this might not have been included in the maintenance plan.
Additional resources
http://books.google.com/books?id=aCChjk_JgKcC&pg=PA194&lpg=PA194&dq=%25+Unplanned+versus+planned+maintenance&source=bl&ots=WNXIEFL
XS6&sig=p2qkULgkWo9PuUUj1pAXs9NQnRE&hl=en&ei=90ciS9XFNpL6_AaInIGwCg&sa=X&oi=book_result&ct=result&resnum=9&ved=0CCMQ6AEwCA#
v=onepage&q=%25%20Unplanned%20versus%20planned%20maintenance&f=false
http://fpm-webstage.fpm.wisc.edu/physical_plant/Services/BuildingMaintenance/tabid/73/Default.aspx
References
1. Committee on Predicting Outcomes of Investments in Maintenance and Repair for Federal Facilities; National Research Council (2012), Outcomes and
risks associated with investments in maintenance and repair. Predicting outcomes from investments in maintenance and repair for federal facilities, available
at: http://www.nap.edu/openbook.php?record_id=13280&page=27
2. Leachman, C. (2011), Maintenance models, available at: http://www.ieor.berkeley.edu/~ieor130/maintenance_models.pdf
3. Integrated Resource Information Systems (2012), IRIS R/3 and BW reports, available at: http://myhelp.uky.edu/rwd/HTML/Reports.html
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/unplanned-maintenance-1606.html
37
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
13
Functional Areas Sub-categories
sK639 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Supply Chain, Procurement, Distribution Inventory Management Manufacturing
Production & Quality Management Production
Name
# Decoupling stock
Definition and variations
Definition
Measures the amount of inventory that exists inside a company during the various stages in its manufacturing system, or even distribution system. By having
a decoupling stock the need for output synchronization is reduced.
Variations
# De-coupling stock
# De-coupling
# Intermediate stock
Related KPIs
$ Stock value
Tags
inventory management, decoupling
Calculation
Focus
Purpose
To indicate the effectiveness of production plan adherence.
Data profile
Targets
In order to reduce the amount of decoupling inventory, the preventive maintenance program should be
improved, and the new production equipment should be selected in such a manner, that it will provide
production rates that can be balanced with existing equipment production rates.
Threshold example
Red: >15% Yellow: 5-15% Green: <5%
Overall notes
Decoupling inventory separates one process from another and ensures the independence of operations, smooths the production requirements and
decouples operations. It exists in manufacturing facilities that have an imbalance between production rates of multiple work centers or unreliable equipment.
Additional resources
http://ecommons.cornell.edu/bitstream/1813/9076/1/TR001192.pdf
References
1. LGO-SDM Alumni (2000), Network representation of a supply chain. Online Seminar Series, available at:
http://docs.google.com/viewer?a=v&q=cache:UqfT2xEV6o4J:lgosdm.mit.edu/VCSS/html/OLS/Sgraves_12_15_00.ppt+%22%23+Decoupling+stock%22+site:
edu&hl=en&pid=bl&srcid=ADGEESj1Nwjgm5MKtFRvxvBFM55kLY94RIaQ0w-gZOhps85Pf3kNx_CroSwgt0qIovXaSY59sTjtz5iCVULkeC-him2L2oOUytPRy_
bnQCC1PhTY2c8iguVumrxIXfkd0SNzI2Or6kkR&sig=AHIEtbRtChswAm0B6yjluEUPdtzM-6dsyw
2. Graves, S. C. (1999), A single-item inventory model for a nonstationary demand process. Manufacturing & Service Operations Management, 1(1): 50-61,
available at: http://web.mit.edu/sgraves/www/ASingle-ItemInventory_article.pdf
3. Lawrence, S. (2012), MBAC6080 Decision modeling, available at:
http://webcache.googleusercontent.com/search?q=cache:wD83L1uIkhsJ:leeds-faculty.colorado.edu/lawrence/OM/Lectures/Exams/Final%2520Review%252
0S04%2520short.ppt+%22%23+Decoupling+stock%22+site:edu&cd=9&hl=en&ct=clnk
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available
KPI Institute
at: 2012
http://www.smartkpis.com/kpi-key-performance-indicator/decoupling-stock-639.html
39
IDIndicator sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
number:documentation
Top 25 Production KPIs of 2011-2012
14
Functional Areas Sub-categories
sK6363 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the total number of production delays recorded in a certain period of time due to inventory shortages or delays in the supply of needed materials or
components.
Variations
# Production delays due to inventory shortages
Related KPIs
% Production delays due to substandard materials or parts
Tags
delays, production
Calculation
Focus
Purpose
To calculate the performance of inventory management, as an important part of supply chain management.
Data profile
Targets
Overall notes
Raw materials shortage problem plays an important role in long term planning of the company's success. According to Nadarajan and Chandren (2011),
causes of materials shortages can be:
* Short packing;
* Schedule change;
* Shorter lead time;
* Design change;
* Supplier capacity;
* Materials defective;
* Wrong materials;
* Parts missing;
* Materials spoilage;
* Demand for critical materials;
* Expiration;
* Natural disaster;
* Transportation delay.
Additional resources
http://www.europeanjournalofscientificresearch.com/ISSUES/EJSR_66_2_05.pdf
References
1.The 51 Fatal Business Errors and How To Avoid Them (2012), Critical performance indicators, available at: http://www.51errors.com/KPIList.pdf
2. Bullseye Business Solutions (2006), Table of key performance indicators, available at:
http://teamtza.com/pics/teamtza/707/sba_TableOfKPIs_checklist_am_050802.doc
3. Rolfe, T. (2007), Cima learning system 2007 financial accounting and tax Principles, available at:
http://books.google.com/books?id=G3_tibwc6ZYC&pg=PA408&lpg=PA408&dq=%22++production+delays+due+to+inventory+shortages%22&source=bl&ots
=3NOoDLY7bY&sig=lCO2dzmj8HVvCWLt7DjdSyh-oPI&hl=en&ei=0SQuTejoIsfMcKXE-fIH&sa=X&oi=book_result&ct=result&resnum=5&sqi=2&ved=0CCsQ
6AEwBA#v=onepage&q=%22%20%20production%20delays%20due%20to%20inventory%20shortages%22&f=false
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
15
Functional Areas Sub-categories
sK1754 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the difference in volume between production capacity and actual production realized.
Variations
# Unused capacity in production
Related KPIs
$ Unused production capacity costs
Tags
production efficiency
Calculation
Focus
Purpose
To indicate the efficiency of production capacity utilization or the loss in production due to unused capacity.
Data profile
Targets
Threshold example
Red: >1000 Yellow: 100-1000 Green: <100
Overall notes
Unused production capacity is directly correlated with the costs encountered by the organization. This is due to the difference of what the organization could
produce with the resources and the actual volume of products.
Additional resources
http://books.google.ro/books?id=ZeVcYteHJKcC&pg=PA240&lpg=PA240&dq=unused+production+capacity&source=bl&ots=EjfWNLXYDy&sig=z4THhFvo81
vomso2aY6enUzsNfk&hl=en&ei=ZtkqTd2xOIau8gOf54n5Ag&sa=X&oi=book_result&ct=result&redir_esc=y#v=onepage&q=unused%20production%20capaci
ty&f=false
References
1. Board of Governors of the Federal Reserve (2012), Industrial production and capacity utilization: Summary, available at:
http://www.federalreserve.gov/releases/g17/current/
2. Tracy, T. C. and Tracy, J. A. (2007), Indirect manufacturing overhead cost. Small business financial management kit for dummies. Indianapolis: Willey
Publising, pp.264-266
3. The Bureau of Fisheries Management and Habitat Protection (1998), Production capacities of the Wisconsin Department of Natural Resources' fish
propagation facilities, available at: http://dnr.wi.gov/topic/Fishing/documents/publications/productioncapacity.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/unused-production-capacity-1754.html
43
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
16
Functional Areas Sub-categories
sK1628 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Manufacturing
Name
Definition
Measures the total costs for producing one unit of final product.
Variations
$ Production costs per final product
Related KPIs
$ Incremental cost
Tags
production efficiency
Calculation
Focus
Purpose
To provide an indication of the cost efficiency of producing an item of final product.
Data profile
Targets
The level of this indicator should be compared with a standard or an average cost for similar products, in
a similar context. The higher this cost is, the lower is the profit per product.
Threshold example
Red: >65 Yellow: 50-65 Green: <50
Overall notes
The production cost per unit is a direct financial indication of the production process efficiency in terms of cost optimization. Variable cost per unit can be
calculated by splitting total variable cost per number of units produced. The variable cost categories include raw materials, labor and packaging costs.
Additional resources
http://books.google.ro/books?id=XkA27vQDgo0C&pg=PA254&lpg=PA254&dq=Production+costs+per+unit&source=bl&ots=UqderWFP_0&sig=1oTnoRyQtSI
06MSkedAAKgjmhwA&hl=ro&ei=xRBGS-30JqXsmgPFxcj2Ag&sa=X&oi=book_result&ct=result&resnum=10&ved=0CDEQ6AEwCTgK#v=onepage&q=Produ
ction%20costs%20per%20unit&f=false
http://www.who.int/immunization_financing/options/en/briefcase_vacproduction.pdf
http://books.google.com/books?id=W1SruJW5tNAC&pg=PA378&lpg=PA378&dq=%22%24+Production+costs+per+unit+%22&source=bl&ots=0oQvhOlcSq&
sig=eUkXRgwjWoeA6MDWZoMRULcz4oc&hl=en&ei=Qrv6TOLXH8zjrAfqgtSVCA&sa=X&oi=book_result&ct=result&resnum=5&sqi=2&ved=0CCQQ6AEwBA
#v=onepage&q=%22%24%20Production%20costs%20per%20unit%20%22&f=false
References
1. Frank, G. (1998), Cost of production versus cost of production, available at: http://cdp.wisc.edu/pdf/cstvscst.pdf
2. Mehta, S. (2012), How to calculate cost per unit, available at: http://www.ehow.com/how_5100715_calculate-cost-per-unit.html
3. Davis, B. B. and Guenthner, J. F. (1992), A primer on costs, available at: http://www.cals.uidaho.edu/edcomm/pdf/CIS/CIS0949.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/production-costs-per-unit-1628.html
45
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
17
Functional Areas Sub-categories
sK84 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Manufacturing
Name
Definition
Measures the time needed to produce one item.
Variations
# Production time
# Unit manufacturing time
# Manufacturing time
Related KPIs
% Products for which common production processes are used
Tags
production, time
Calculation
Focus
Purpose
To compare different production lines and improve order fulfillment management.
Data profile
Targets
Threshold example
Red: >2.5 Yellow: 2-2.5 Green: <2
Overall notes
In order to improve the unit production time, all the factors that lead to a lower level or can be improved should be taken into consideration. It is well known
that using production equipment intensely can increase the production time, and downtime will also increase production time.
Additional resources
Rakar, A. et al. (2004), Assessment of production performance by means of KPI. UK:University of Bath
References
1. Rakar, A., Zorzut, S. and Jovan, V. (2004), Assessment of production performance by means of KPI, available at:
http://ukacc.group.shef.ac.uk/proceedings/control2004/Papers/073.pdf
2. Pochet, Y. and Wolsey, L. (2000), Production planning by mixed integer programming. USA: Springer.
3. Andreson, D. R., Sweeney, D. J., Williams, T. A., Camm, J. D. and Martin, R. K. (2010), Quantitative Methods for Business, eleventh edition. Mason:
South-Western Cengage Learning
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/unit-production-time-84.html
47
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
18
Functional Areas Sub-categories
sK638 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Supply Chain, Procurement, Distribution Inventory Management Manufacturing
Production & Quality Management Production Retail
Name
# Working stock
Definition and variations
Definition
Measures the amount of stock available (or planned to be available) for the normal demand, excluding excess stock and safety stock. It is formed by
products that are arriving infrequently and in large quantities, to meet frequent but small-quantity demands.
Variations
# Cycle stock
# Cycle inventory
# Lot size stock
# Working inventory
# Batch stock
Related KPIs
% Level of stock-outs
Tags
inventory management, working
Calculation
Focus
Purpose
To provide an indication of the amount of stock that is available for normal demand.
Data profile
Targets
Threshold example
Red: <500 Yellow: 500-800 Green: >800
Overall notes
Inventory can be considered a very important asset that most businesses possess, as the inventory turnover is one of the primary sources of revenue
generation. Inventory is considered a liquid asset, since it can be converted into cash quite easily.
Additional resources
http://www.businesslink.gov.uk/bdotg/action/layer?topicId=1074039371
References
1. Food and Feed Grains Institute Manhattan (1991), National food security stock policies and procedures in Sub-Saharan Africa, available at:
http://pdf.usaid.gov/pdf_docs/PNABJ937.pdf
2. Financial Management Service (2012), Status report of U.S. Treasury-owned gold, available at: http://www.fms.treas.gov/gold/current.html
3. Stochastic Models (2012), Materials management, available at: http://classweb.gmu.edu/aloerch/Inventory.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/working-stock-638.html
49
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
19
Functional Areas Sub-categories
sK6365 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the percentage of products for which common production processes are used.
Variations
% Products using common production processes
Related KPIs
# Unit production time
Tags
production, processes
Calculation
Focus
Purpose
To monitor the level of process shared in production, indicating the efficiency of resource allocation.
Data profile
Targets
Threshold example
Red: <20% Yellow: 20-50% Green: 50%
Overall notes
This indicator measures the flexibility of the production process design. A high level of this KPI shows high quality of production design, thus indicating a high
efficiency of production.
Additional resources
http://www.nap.edu/openbook.php?record_id=6258&page=1
References
1. Bullseye Business Solutions (2006), Table of key performance indicators, available at:
http://teamtza.com/pics/teamtza/707/sba_TableOfKPIs_checklist_am_050802.doc
2. Karmakar, U. S., Lederer, P. J. and Zimmerman, J. (1990), Choosing manufacturing production control and cost accounting systems, available at:
http://www.simon.rochester.edu/fac/lederer/SimonFacultyWeb/LedererPapers/ChoosingManufacturingProductionControlandCostAccountingSystems.pdf
3. Panel on Manufacturing Process Controls, Committee on Industrial Technology Assessments, Commission on Engineering and Technical Systems,
National Research Council (1998), Manufacturing process controls for the industries of the future. Washington: National Academy Press
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/products-for-which-common-production-processes-are-used-6365.html
51
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
20
Functional Areas Sub-categories
sK1603 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the percentage of the delays in production schedule due to a raw material shortage within the production process.
Variations
% Production schedule delays because of material shortages
Related KPIs
% Production schedule attainment
Tags
production plan tracking
Calculation
Focus
Purpose
To reflect the effectiveness of production planning regarding the raw material used in production.
Data profile
Targets
Threshold example
Red: >10% Yellow: 5-10% Green: <5%
Overall notes
Production planning and scheduling is critical to the success of business. When planning amount of raw materials to be purchased, other factors can be
considered to facilitate decision making, such as production quantities, inventory level and possible demand fluctuation.
Additional resources
http://books.google.com/books?id=YVW02D29n_8C&pg=PT357&lpg=PT357&dq=Production+schedule+delays+because+of+material+shortages&source=bl
&ots=vUXQUfP1bk&sig=Ka_Bb_sZ6TJMuQ_Z-8AWmQJwazo&hl=en&ei=0mUnS_61DsPK_gaPiaiqDQ&sa=X&oi=book_result&ct=result&resnum=8&ved=0
CCwQ6AEwBzgK#v=onepage&q=Production%20schedule%20delays%20because%20of%20material%20shortages&f=false
http://docs.google.com/viewer?a=v&q=cache:0VOSJIELVasJ:www.clicksoft.org/Download/Warehouse/Store%2520House%2520Inventory%2520MIS.doc+%
22%25+Production+delays+due+to+raw%22&hl=en&pid=bl&srcid=ADGEESjybjbIm3Z6acJPN7mVdM-ZDU9YzPg_HXZdVIR4FCbyrGFcq5UAsIhS-ShH_jIF_
SMxWYcb9O-Zbbw_bh1PqpwPKgeaOzzUopIa9wR8Tao34SAlGGf08IF2ryQINMf78CcPUYhx&sig=AHIEtbSjErSP1JB6_Ax_MpYgYVqFqnJIKw
References
1. Duenas, A., Petrovic, D., Petrovic, S. ( 2005), Analysis of performance of fuzzy logic-based production scheduling by simulation, Lecture notes in
Computer Science, 2005, Volume 3789, MICAI 2005: Advances in Artificial Intelligence, Pages 234-243, available at:
http://www.springerlink.com/content/y4832m1u8l1388m0/
2. Yeh, C. (1997), Schedule based production. International Journal of Production Economics Volume 51, Issue 3, 15 September 1997, Pages 235-242,
available at: http://www.sciencedirect.com/science/article/pii/S0925527397000790
3. East, R. E. (2005), Level production schedules. A base for improvement, available at:
http://ellisandurry.com/UserFiles/File/Articles/Level%20Production%20rev2.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/production-delays-due-to-raw-material-shortage-1603.html
53
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
21
Functional Areas Sub-categories
sK1609 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Manufacturing
Name
Definition
Measures the value of units that are in production process, not yet completed.
Variations
$ Cost of work in progress
$ Work in progress
$ Value of WIP
Related KPIs
% Work in progress days
Tags
production plan tracking
Calculation
Focus
Purpose
To provide an indication of the financial investment within the production process, that can not yet be commercialized in order to generate revenue.
Data profile
Targets
Threshold example
Red: <75,000; >150,000 Yellow: 75,000-100,000; 125,000-150,000 Green: 100,000-125,000
Overall notes
Most frequently, this KPI is considered a cost calculation measure. Estimating the Work In Progress (WIP) process provides a clearer picture of the
organization's inventory for financial reporting.
Additional resources
http://books.google.ro/books?id=8SaARYOflPIC&pg=PT133&lpg=PT133&dq=%24+Value+of+work+in+progress+(%24)production&source=bl&ots=-h-LVf1PI
a&sig=2KmTB_rqE4Xs81u_NnUM3oEGdVc&hl=en&ei=yFoiS5XZDteW_QbzwPGxCg&sa=X&oi=book_result&ct=result&redir_esc=y#v=onepage&q=%24%2
0Value%20of%20work%20in%20progress%20(%24)production&f=false
http://books.google.ro/books?id=-gyAzGD7JPIC&pg=PA167&lpg=PA167&dq=%24+Value+of+work+in+progress+(%24)+in+production&source=bl&ots=JvGu
Lrr-pB&sig=_soZurnG1TF0cDtPDTHqwM7xPxs&hl=en&ei=xl0iS-6KBpeL_Aaq9S8Cg&sa=X&oi=book_result&ct=result&redir_esc=y#v=onepage&q=%24%2
0Value%20of%20work%20in%20progress%20(%24)%20in%20production&f=false
References
1. Future Accountant (2012), Closing stock (at Work in Progress stage) in Process Account, available at:
http://www.futureaccountant.com/process-costing/study-notes/closing-stock-in-process-account-work-in-progress-stage.php
2. Drury, C. (2006), Cost and management accounting: An introduction. London: Thomson Learning
3. Lowndes, V. and Berry, S. (2012), Designing a constant Work in Progress production control system, available at:
http://ducati.doc.ntu.ac.uk/uksim/ESM2003/Papers/Track-General/CS-22/paper%20CR.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/value-of-work-in-progress-1609.html
55
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
22
Functional Areas Sub-categories
sK1605 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the percentage of days during which units are in the production process, without being completed as final products.
Variations
% WIP days
Related KPIs
$ Value of work in progress
Tags
production plan tracking
Calculation
Focus
Purpose
To reflect the invoicing efficiencies of the firm and job turnaround time.
Data profile
Targets
Threshold example
Red: >60 Yellow: 40-60 Green: <40
Overall notes
This KPI has a significant connection with cashflow and working capital in a business. A high level of this KPI gets working capital stretched with costs (e.g.
labor and materials). Additionally, customers get annoyed quickly when jobs are not completed properly, on time. This has an impact on payment collection
days, which further adds to cashflow issues.
Additional resources
http://www.smallbusinesshq.com.au/factsheet/12063-work-in-progress-and-working-capital.htm
References
1. Benchmarking Succes (2012), Improving via Benchmarking using KPIs, available at: http://www.benchmarkingsuccess.com/info/kabout.asp
2. IBalance Business Institute (2012), How to reduce work in progress days in professional firms, available at:
http://www.ibalancebusinessinstitute.com/index2.php?option=com_content&do_pdf=1&id=21
3. Semenov, G. A. and Nagorianskii, L. A. (1974), Industrial Safety Calculating the optimum scales of work in progress, available at:
http://www.springerlink.com/content/u288184j46764060/
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/work-in-progress-days-1605.html
57
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
23
Functional Areas Sub-categories
sK1675 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Production & Quality Management Production Any
Name
Definition
Measures the duration of unscheduled downtime, when the system is not available to perform its function, often due to machine failure.
Variations
% Unplanned downtime
Related KPIs
# Scheduled maintenance related downtime
Tags
production plan tracking
Calculation
Focus
Purpose
To indicate the effectiveness of maintenance planning and implementation, since unplanned downtime, depending on its gravity, can impact the production
volume and duration.
Data profile
Targets
Threshold example
Red: >20% Yellow: 10-20% Green: <10%
Overall notes
Monitoring this indicator supports the improvement in maintenance planning and schedule attainment. Changes in production due to unplanned maintenance
are related to production volume and lead time, which generate further negative impact on production contracts and client relationship management.
Additional resources
http://www.maoz.com/~dmm/complexity_and_the_internet/downtime.pdf
References
1. Andersson, C. and Bellgran, M. (2012), Managing production performance with Overall Equipment Efficiency (OEE) - Implementation Issues and Common
Pitfalls, available at: http://msep.engr.wisc.edu/phocadownload/cirp44_managing%20production%20performance.pdf
2. Vorne Industries, Inc. (2012), Reduce downtime, available at: http://www.vorne.com/solutions/improvement/reduce-down-time.htm
3. PC-WARE (2012), Server virtualization, available at: http://www.pc-ware.com/pcw/com/en/services-solutions/virtualisation/server-virtualisation.htm
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/unplanned-downtime-in-production-1675.html
59
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
24
Functional Areas Sub-categories
sK3707 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Supply Chain, Procurement, Distribution Logistics / Distribution Any
Production & Quality Management Production
Name
Definition
Measures the penalties value due to poor performance of satisfying demand.
Variations
% Average weight utilization
Related KPIs
$ Penalties paid for poor performance
Tags
penalties
Calculation
Focus
Purpose
To monitor the quality of production as shown by value of penalties incurred.
Data profile
Targets
Threshold example
Red: >1,000,000 Yellow: 500,00-1,000,000 Green: <500,000
Overall notes
A high level of this KPI not only shows heavy financial burden on the organization, but also indicates low customer satisfaction.
Additional resources
http://www.dot.state.mn.us/ofrw/PDF/Twin%20Ports%20Intmdl%20Terminal%20Study%20-%20FINAL.pdf
http://help.sap.com/printdocu/core/print46c/en/data/pdf/LOLIS/LOLIS_KOMPONENTEN%20DES%20LIS.pdf
References
1. Dekker, R., Fleischmann, M., Inderfurth, K. and Wassenhove, L. eds. (2004), Reverse logistics: Quantitative models for closed loop supply chains. Berlin:
Springer-Verlagis
2. Richard J. (1970), Stochastic capacity models. Management Science, 17(3):174-184
3. Ben-Daya, M. and Raouf, A. (1993), On the constrained multi-item single-period inventory problem, International Journal of Operations & Production
Management, 13(11):104 - 112
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/penalties-cost-due-to-unsatisfied-demand-3707.html
61
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Production KPIs of 2011-2012
25
Functional Areas Sub-categories
sK707 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Supply Chain, Procurement, Distribution Logistics / Distribution Any
Production & Quality Management Production
Name
Definition
Measures the percentage of products that are being returned for a second time from the customer, from the overall number of products delivered.
Variations
% Second return time
% BRR
Related KPIs
$ Repair cost per return
Tags
logistics, reverse logistics, return rate
Calculation
Focus
Purpose
To assess the efficacy in the repairing or replacing process for the products that were already returned once.
Data profile
Targets
A high percentage of the boomerang return rate will have a negative impact on brand loyalty and
customer retention. Its level should be close to 0%.
Threshold example
Red: >5% Yellow: 2-5% Green: <2%
Overall notes
The return policy and repair depot are very relevant for decreasing the level of this indicator. Since most supply chains are not designed to handle reverse
material flows effective, this is an important aspect to consider for the reverse logistics.
Additional resources
http://www.enggjournals.com/ijet/docs/IJET11-03-03-25.pdf
http://www.personal.psu.edu/drg16/Reverse%20SC%20-%20Returns-CMR.pdf
http://www.remanufacturing.org.uk/pdf/story/1p293.pdf
References
1. Davey, K., Hirschfeld, C. and Posazhennikova, V. (2010), Catching the boomerang: The product return process of Swedish e-retailers, available at:
http://www.akeri.se/files/bilder/sa/Catching_the_Boomerang.pdf
2. Dekker, R., Fleischmann, M., Inderfurth, K., Wassenhove, L. eds. (2004), Reverse logistics quantitative models for closed loop supply chains.
Berlin:Springer-Verlagis
3. Yellepeddia, S. S. (2006), Methodology for evaluating the performance of reverse supply chains in consumer electronics industry, available at:
http://dspace.uta.edu/bitstream/handle/10106/307/uta-etd-1430.pdf?sequence=1
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/boomerang-return-rate-707.html
63
IDIndicator
number:documentation
sK0128281 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Human
Top 25 Production
Resources KPIs of 2011-2012
Customer Academic
comprehensive and well documented selection of Key Performance Indicator (KPI) examples in the world, the ‘gold standard’ in KPI
documentation.
Service Education
KPIs of 2010 KPIs of 2010 KPIs of 2010 KPIs of 2010 KPIs of 2010
PurposefulIdentity.com contains a free online catalogue illustrating the use of corporate identity elements in practice by organizations
KPIs of 2010
from around the world. Registered users can explore, bookmark and comment on hundreds of referenced online resources that contain
organizational values, mission statements, value drivers and vision statements used in actual business context.
Culori
R=110 R=176
IntegratingPerformance.com is an online platform for integrating performance management knowledge, at strategic, operational and
G=110 G=176
# Berry ratioindividual
# Laborlevels. It reviews the evolution of Performance
ratio #Management as well
% as the key tools,expense
systems and software
(MER)used
# at discipline
B=109 B=176
$ Cost of goods sold (COGS) # Days in accounts receivable % Billing accuracy $ Selling, general and administrative % On-time delivery # Time to rectify defects % Customer complaints due to poor service or product quality # Call multiplier % Capital acquisition Liquidity ratio Management ratio % Attendance rate per course % Drop-out rate # National examination score % Student acceptance rate % Gradu- %Agent utilization $ Revenue per successful call # Call handling time # Hourly sales per agent # Call volume % First $ Revenue per available seat hour (RevPASH) % Canceled reservations # Complaints per restaurant order % Posi-
at each of these levels. It combines the analysis of theory and architecture with insights regarding good practice and key directions, ation rate % Student scholarships per year % Students participating in research activities # Students grades %
expenses (SG&A expenses) $ Working capital per employee $ Working capital $ Fixed assets $ Operating expenses handling time % First contact resolution rate % Complaints resolved # Longest call hold % Customer satisfaction Altman Z-Score (for privately held manufacturing companies) % Sustainable growth rate (SGR) % Return on capital call resolution rate # Longest call hold % Call abandon rate # Longest delay in queue % Customer calls answered tive feedback from guests % Reserved tables # Guests per table # Tables served per waiter $ Revenue per available
enabling visitors to gain comprehensive insights into the nature of Performance Management as an integrating discipline. Students involved in extracurricular activities % Student satisfaction rate # Extracurricular activities per student #
$ Net income after taxes (NIAT) # Breakeven point (BEP) $ Financial expenses % Aging of uncollected bills $ Fixed with service levels % Orders delivered with damaged products % Call abandon rate # Complaints received # Pick-to- employed (ROCE) % Gross profit margin $ Net cash flow $ Free cash flow (FCF) $ EBIT (Earnings Before Interest and in the first minute # Service requests per agent % Calls answered within service level time # Talk time % Blockage # square meter (RevPAM) % Customers satisfied with the time to be served % Restaurants that apply principles of
assets per FTE (Full Time Equivalent) % Invoices under query # Days in accounts payable # Days of purchases paid ship cycle time for customer orders # Longest delay in queue % Customer calls answered in the first minute % Work Taxes) $ Earnings per share (EPS) $ Economic value added (EVATM) # Asset turnover % Return on investment (ROI) Students per class % Students - professor ratio # Students to computer ratio % Entering students through transfer Average speed of answer (ASA) $ Cost per call (CPC) # On-hold time % Call completion rate # After call work time % workplace safety and sanitation % Unavailability of menu items % Restaurants that apply principles of menu plan-
$ Fixed costs % Contribution margin ratio % Financial reports submitted as correct and on time $ Earnings before orders closed within the specified time period % Service charges of profits # Service requests per agent % Calls % Cash-on-cash return (CCR) # Altman Z-Score (for public manufacturing companies) # Price to sales ratio # Acid
Culori $ Academic activity cost per student % Ethnic minority students % Student repetition rate # Teaching experience % Call transfer rate % Agent availability rate # Dials per hour # Web call-backs handled % Repeat calls % Agent sched- ning $ Revenue per table # Time per table turn % Restaurants that apply principles of managing the purchasing pro-
interest, taxes, depreciation and amortization (EBITDA) # Sales to general and administrative expenses $ Expenses answered within service level time % Sales invoices issued on time # Talk time % Timeliness of issues resolution % test ratio % Net profit margin # Interest
R=109 R=255
cover % Annual equivalent rate # Benefit cost ratio (BCR) % Total expense Graduate employment rate # Time to graduate % International students % National accreditation study programs # ule adherence %Agent utilization $ Revenue per successful call # Call handling time # Hourly sales per agent # Call cess $ Amount of dining % Food service strike rate % Food loss % Tips from total collected % Food costs from food
# Working capital turnover # Current ratio # Average days past-due invoices $ Cost of goods sold (COGS) # Days in Blockage % Resolution of queries the same day # Orders processed # Average speed of answer (ASA) % On-time ratio (TER) # Berry ratio
G=33
# Labor multiplier
G=0
% Capital acquisition ratio # Liquidity ratio % Management expense ratio Students enrolled per academic year # Male to female student ratio % Attendance rate per course % Drop-out rate volume % First call resolution rate # Longest call hold % Call abandon rate # Longest delay in queue % Customer sales # New menu items # Guests # Product quality uniformity % Beverage loss % Front of house labor $ Revenue
accounts receivable % Billing accuracy $ Selling, general and administrative expenses (SG&A expenses) $ Working delivery # Time to rectify defects % Customer complaints due to poor service or product quality # Call handling time (MER) # Altman Z-Score B=20
(for privatelyB=0
held manufacturing companies) % Sustainable growth rate (SGR) % Return on # National examination score % Student acceptance rate % Graduation rate % Student scholarships per year % calls answered in the first minute # Service requests per agent % Calls answered within service level time # Talk time per available seat hour (RevPASH) % Canceled reservations # Complaints per restaurant order % Positive feedback
BalancedScorecardReview.com is the most comprehensive online resource dedicated to the Balanced Scorecard. It contains a review Students participating in research activities # Students grades % Students involved in extracurricular activities %
capital per employee $ Working capital $ Fixed assets $ Operating expenses $ Net income after taxes (NIAT) # Break- % First contact resolution rate % Complaints resolved # Longest call hold % Customer satisfaction with service capital employed (ROCE) % Gross profit margin $ Net cash flow $ Free cash flow (FCF) $ EBIT (Earnings Before Inter- % Blockage # Average speed of answer (ASA) $ Cost per call (CPC) # On-hold time % Call completion rate # After call from guests % Reserved tables # Guests per table # Tables served per waiter $ Revenue per available square meter
of this popular management concept following its evolution and use around the world in various industries or companies. It presents its Student satisfaction rate # Extracurricular activities per student # Students per class % Students - professor ratio
even point (BEP) $ Financial expenses % Aging of uncollected bills $ Fixed assets per FTE (Full Time Equivalent) levels % Orders delivered with damaged products % Call abandon rate # Complaints received # Pick-to-ship cycle est and Taxes) $ Earnings per share (EPS) $ Economic value added (EVATM) # Asset turnover % Return on invest- work time % Call transfer rate % Agent availability rate # Dials per hour # Web call-backs handled % Repeat calls % (RevPAM) % Customers satisfied with the time to be served % Restaurants that apply principles of workplace safety
various interpretations, compares it to other concepts and explores its impact on organizations as well as the opinions of critics. # Students to computer ratio % Entering students through transfer $ Academic activity cost per student % Ethnic
% Invoices under query # Days in accounts payable # Days of purchases paid $ Fixed costs % Contribution margin time for customer orders # Longest delay in queue % Customer calls answered in the first minute % Work orders ment (ROI) % Cash-on-cash return (CCR) # Altman Z-Score (for public manufacturing companies) # Price to sales Agent schedule adherence %Agent utilization $ Revenue per successful call # Call handling time # Hourly sales per and sanitation % Unavailability of menu items % Restaurants that apply principles of menu planning $ Revenue per
ratio % Financial reports submitted as correct and on time $ Earnings before interest, taxes, depreciation and amorti- closed within the specified time period % Service charges of profits # Service requests per agent % Calls answered ratio # Acid test ratio % Net profit margin # Interest cover % Annual equivalent rate # Benefit cost ratio (BCR) % Total minority students % Student repetition rate # Teaching experience % Graduate employment rate # Time to graduate agent # Call volume % First call resolution rate # Longest call hold % Call abandon rate # Longest delay in queue % table # Time per table turn % Restaurants that apply principles of managing the purchasing process $ Amount of
zation (EBITDA) # Sales to general and administrative expenses $ Expenses # Working capital turnover # Current ra- within service level time % Sales invoices issued on time # Talk time % Timeliness of issues resolution % Blockage expense ratio (TER) # Berry ratio # Labor multiplier % Capital acquisition ratio # Liquidity ratio % Management ex- % International students % National accreditation study programs # Students enrolled per academic year # Male to Customer calls answered in the first minute # Service requests per agent % Calls answered within service level time dining % Food service strike rate % Food loss % Tips from total collected % Food costs from food sales # New menu
female student ratio % Attendance rate per course % Drop-out rate # National examination score % Student acceptan
Culori
tio # Average days past-due invoices $ Cost of goods sold (COGS) # Days in accounts receivable % Billing accuracy % Resolution of queries the same day # Orders processed # Average speed of answer (ASA) % On-time delivery pense ratio (MER) #R=0 Altman Z-ScoreR=127 (for privately held manufacturing companies) % Sustainable growth rate (SGR) # Talk time % Blockage # Average speed of answer (ASA) $ Cost per call (CPC) # On-hold time % Call completion rate items # Guests # Product quality uniformity % Beverage loss % Front of house labor $ Revenue per available seat
G=0 G=147
Publication date: 25 May 2011 Publication date: 10 June 2011 Publication date:
Life.lab1Building,
June Suite
2011606, 198 Harbour Esplanade, Melbourne Docklands, VIC 3008 Publication date: 10 March 2011 Publication date: 18 August 2011
eabID number: sK0118021 eabID number: sK0118031 eabID number:T: +61 3 9670 2979, E: office@eabgroup.com.au
sK0118041 eabID number: sK0118152 eabID number: sK0118161 eabID number: sK0118171
Publication date: 10 March 2011 Publication date: 30 March 2011 Publication date: 17 June 2011 Publication date: 30 March 2011 Publication date: 25 August 2011 Publication date: 9 August 2011
eabID number: sK0118051 eabID number: sK0118061 eabID number: sK0118071 eabID number: sK0118181 eabID number: sK0118191 eabID number: sK0118201
Publication date: 15 March 2011 Publication date: 22 June 2011 Publication date: 20 June 2011 Publication date: 5 September 2011 Publication date: 29 August 2011 Publication date: 15 August 2011
eabID number: sK0118081 eabID number: sK0118121 eabID number: sK0118091 eabID number: sK0118211 eabID number: sK0118221 eabID number: sK0118241
Publication date: 22 June 2011 Publication date: 14 March 2011 Publication date: 21 June 2011 Publication date: 21 March 2011 Publication date: 28 August 2011 Publication date: 29 July 2011
eabID number: sK0118101 eabID number: sK0118131 eabID number: sK0118141 eabID number: sK0118251 eabID number: sK0118261 eabID number: sK0118271
www.smartkpis.com/premium/products/reports/browse-top-kpis-reports
© The KPI Institute 2012
64
ID number: sK0128281
sK0117081
Top 25 Human
Production
Resources
KPIs of KPIs
2011-2012
of 2011-2012
# Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls # Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls # Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls # Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls
answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue #
Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call
work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent %
Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact
resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer
satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint # satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint # satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint # satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint #
Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls
answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue #
Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call
work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent %
Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact
resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer
satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint
Publication date: September 2012 ID number: sK0117081 Publication date: September 2012 ID number: sK0117081 Publication date: September 2012 ID number: sK0117081 Publication date: September 2012 ID number: sK0117081
By Functional Area
Top 25 Accounting KPIs of 2011-2012 Top 25 Governance KPIs of 2011-2012 Top 25 Public Relations KPIs of 2011-2012
Top 25 Accounts Payable and Receivable KPIs of 2011- Top 25 Human Resources KPIs of 2011-2012 Top 25 Quality Management KPIs of 2011-2012
2012
Top 25 Advertising KPIs of 2011-2012 Top 25 Information Technology KPIs of 2011-2012 Top 25 R&D KPIs of 2011-2012
Top 25 Application Development KPIs of 2011-2012 Top 25 Innovation KPIs of 2011-2012 Top 25 Recruitment KPIs of 2011-2012
Top 25 Compensation and Benefits KPIs of 2011-2012 Top 25 Inventory Management KPIs of 2011-2012 Top 25 Retention KPIs of 2011-2012
Top 25 Compliance and Audit Management KPIs of Top 25 IT Security KPIs of 2011-2012 Top 25 Risk Management KPIs of 2011-2012
2011-2012
Top 25 Contract Management KPIs of 2011-2012 Top 25 Knowledge Management KPIs of 2011-2012 Top 25 Sales KPIs of 2011-2012
Top 25 Corporate Travel KPIs of 2011-2012 Top 25 Logistics / Distribution KPIs of 2011-2012 Top 25 Service Delivery KPIs of 2011-2012
Top 25 CSR KPIs of 2011-2012 Top 25 Maintenance KPIs of 2011-2012 Top 25 Service Management KPIs of 2011-2012
Top 25 Customer Service KPIs of 2011-2012 Top 25 Marketing KPIs of 2011-2012 Top 25 Supply Chain Management KPIs of 2011-2012
Top 25 Data Center KPIs of 2011-2012 Top 25 Network Management KPIs of 2011-2012 Top 25 Supply Chain, Procurement, Distribution KPIs
of 2011-2012
Top 25 eCommerce KPIs of 2011-2012 Top 25 Portfolio Management KPIs of 2011-2012 Top 25 Talent Development KPIs of 2011-2012
Top 25 Enterprise Architecture KPIs of 2011-2012 Top 25 Procurement / Purchasing KPIs of 2011-2012 Top 25 Web Analytics KPIs of 2011-2012
Top 25 Environmental Care KPIs of 2011-2012 Top 25 Production KPIs of 2011-2012
Top 25 Finance KPIs of 2011-2012 Top 25 Project Management KPIs of 2011-2012
By Industry
Top 25 Academic Education KPIs of 2011-2012 Top 25 Hotel KPIs of 2011-2012 Top 25 Publishing KPIs of 2011-2012
Top 25 Accounting Services KPIs of 2011-2012 Top 25 Insurance KPIs of 2011-2012 Top 25 Railways KPIs of 2011-2012
Top 25 Airlines KPIs of 2011-2012 Top 25 Investments KPIs of 2011-2012 Top 25 Real Estate Transactions KPIs of 2011-2012
Top 25 Airports KPIs of 2011-2012 Top 25 Land Transport (Road & Rail) KPIs of 2011-2012 Top 25 Employment Services KPIs of 2011-2012
Top 25 Banking and Credit KPIs of 2011-2012 Top 25 Legal Practice KPIs of 2011-2012 Top 25 Restaurant KPIs of 2011-2012
Top 25 Broadcasting (TV and Radio) KPIs of 2011-2012 Top 25 Libraries and Archives KPIs of 2011-2012 Top 25 Retail KPIs of 2011-2012
Top 25 Business Consulting KPIs of 2011-2012 Top 25 Livestock, Hunting and Fishing KPIs of 2011- Top 25 Roads KPIs of 2011-2012
2012
Top 25 Call Center KPIs of 2011-2012 Top 25 Local Government KPIs of 2011-2012 Top 25 Shipping KPIs of 2011-2012
Top 25 Coal and Minerals Mining KPIs of 2011-2012 Top 25 Local Public Transport KPIs of 2011-2012 Top 25 Sport Club Management KPIs of 2011-2012
Top 25 Crops KPIs of 2011-2012 Top 25 Medical Practice KPIs of 2011-2012 Top 25 Sport Event Organisation KPIs of 2011-2012
Top 25 Electricity KPIs of 2011-2012 Top 25 Natural Gas KPIs of 2011-2012 Top 25 State Government KPIs of 2011-2012
Top 25 Engineering KPIs of 2011-2012 Top 25 NGO KPIs of 2011-2012 Top 25 Sustainability KPIs of 2011-2012
Top 25 Film and Music KPIs of 2011-2012 Top 25 Oil and Gas KPIs of 2011-2012 Top 25 Water and Sewage KPIs of 2011-2012
Top 25 Forestry and Logging KPIs of 2011-2012 Top 25 Ports KPIs of 2011-2012 Top 25 Telecommunications KPIs of 2011-2012
Top 25 Healthcare KPIs of 2011-2012 Top 25 Postal and Courier Services KPIs of 2011-2012
Top 25 Hospital KPIs of 2011-2012 Top 25 Property Management KPIs of 2011-2012
Delivery approach • Highly interactive, numerous exercises, case studies and group discussions
• Experiential learning simulations
All training courses • Six months of free access to the premium content of www.smartkpis.com
include: • Free toolkit of pre-populated templates to assist you with applying the course
learnings
• Library of relevant examples from practice
Performance through people training catalogue
Always treat your employees exactly as you want them to treat your best customers. - Stephen R. Covey It is always wise to look ahead, but difficult to look further than you can see. - Winston Churchill Business and human endeavors are systems…we tend to focus on snapshots of isolated parts of the system.
And wonder why our deepest problems never get solved. - Peter Senge
Change is the law of life and those who look only to the past or present are certain to miss the future. - John F. Kennedy The transition to a sustainable society requires a careful balance between long-term and short-term goals and an emphasis on A system is a network of interdependent components that work together to try to accomplish the aim of the system.
sufficiency, equity, and quality of life. - Denis L. Meadows A system must have an aim. Without an aim, there is no system - W. Edwards Deming. The New Economics
PERFORMANCE
STRATEGY
Process Management
In building a strong foundation
for performance, organiza- Risk Management
tions should leverage systemic
thinking and excellence in Project Management
managing change, projects,
Change Management
risks and processes
Systems Thinking
© The KPI Institute 2012
68 ©IDThe KPI Institute 2012
68 number: sK0117081
ID number: sK0128281
Top 25 Human
Production
Resources
KPIs of KPIs
2011-2012
of 2011-2012
INTEGERPERFORM
the consulting arm of The KPI Institute, dedicated to assisting
European office: +40 721 233 084 / +40 369 801 650
Australian office: +61 42 456 8088 / +61 3 9670 2979
organisations in deploying best practice performance Email: office@integerperform.com, www.performanceintegrators.com
improvement solutions
Service categories
Consulting Technology Solutions
Applied solutions clustered around the Software and hardware that facilitate the
performance integration architecture developed by operation of successful performance improvement
The KPI Institute: peformance through people, initiatives
systems and innovation
Performance through systems - advisory services catalogue
Strategic and operational planning Operational performance management solutions
• Facilitation of strategic planning sessions. Supplier performance management – Development and
• Strategic research: environmental scans, strategic planning implementation of supplier scorecards for both products and
tools deployment (Five forces, SWOT analysis, competitor services suppliers
review).
Portfolio performance management
• Development of Portfolio Dashboards and Project Scorecards
Organizational Performance Management Systems • Identification of Key Risk Indicators and establishment of Risk
Implementations Scorecards
• Integrated performance management systems based on the Benefits realization management
Balanced Scorecard. • Development of benefits management plans
• Application at all organizational levels, or limited to strategic • Project or program evaluation
level, operational level or individual level.
Alliances performance
• Establishment of Alliances Scorecards
Key Performance Indicators Advice • Development of Service Level Agreements
• Overhaul of existing KPIs, by reviewing and updating them Assessment / Audit / Review
in accordance to organizational strategy and best practice.
• Assistance with KPI selection. Audit of organizational performance management systems at
• KPI documentation support – customisation of smartKPIs strategic, operational or individual levels.
Premium templates to reflect organizational needs. Organizational capability assessment using TKI’s proprietary
• Development of customised KPI catalogues. tools:
• Assistance in identifying reliable benchmarking resources. • Performance Management Maturity Model
• Performance Measurement Maturity Model
9 Browse 7000+ KPI examples 9 Browse 7000+ KPI examples 9 Browse 7000+ KPI examples
9 Access 17 documentation fields 9 Access 17 documentation fields 9 Access 40 documentation fields
9 View 200 documented KPIs 9 View 200 documented KPIs 9 Export 1000 documented KPIs
Research Research Research
One research report: Two research reports: Three generic Excel templates
9 Top 20 KPIs of 2010 9 Top 20 KPIs of 2010 pre-populated with over 70 KPI
9 Top 25 KPIs of 2010 report examples:
of your choice 9 Balanced Scorecard
9 KPI Dashboard
9 Performance Healthogram
Testimonials
On smartKPIs.com premium content
“Guys we are very thankful of the hard work you do. “Really a very good and useful website, I am excited “Access to all smartKPIs.com research reports
Your website really guides us on the daily about the content and comprehensiveness of data and advance functionality in searching the online
performance management of our organization.” on your website, and I will recommend it to all catalogue helps my office in facilitating the
professional in the governmental sector in United understanding, selection and usage of KPIs across
Omphile Macheng, Botswana Arab of Emirates, Wish you all the best.” the organization.”
On our publications
“The Top 25 Call Center KPIs of 2010 helps in “smartKPIs.com provided a simple yet powerful “I was pleasantly surprised of the level of experience
understanding all the performance measures scorecard and dashboard model to start building our and knowledge of the smartKPIs.com team. The
which should be taken into account to optimize own with our business intelligence tools.” toolkit delivered was what I had anticipated to be.”
performance...”
Jacob Brown, United States Humberto E Della Torre, El Salvador Alex Giammona, Australia
Characteristics
9 Intuitive, robust, fully live and interactive
9 Reliable in any economic environment
9 Offers optimal return on investment
Benefits
9 Real time control of your business
9 Easy monitoring, analysis and reporting of KPis
9 Perfect for Balanced Scorecard automation
9 Fast consolidalion of information
Configuration
9 Easy to access and to use, fully web-based
9 Possibility of external, in-cloud hosting, as well as on-site
9 Easy to access from any device or location having Internet access
www.integerperform.com/kpi-dashboard-balanced-scorecard-software
© The KPI Institute 2012
71
ID number: sK0117081
sK0128281
Top 25 Production KPIs of 2011-2012
Rate – A specific type of ratio expressed in many cases as part to whole. Examples of rates are the natality or mortality rate, expressed as the
number of births or deaths per a certain number of population or the currency exchange rate, where the value of one currency is compared
to the value of the other currency.
Ratio – A relation between two measures that might be distinct, but which are part of the same category of elements, such as the ratio of boys
to girls, teachers to students, doctors to patients, revenues to expenditure.
Composition – A composite indicator is formed when individual indicators are compiled into a single index, on the basis of an underlying
model of the multi-dimensional concept that is being measured. It measures multi-dimensional concepts (e.g. competitiveness, e-trade or
environmental quality) which cannot be captured by a single indicator.
Index – A number computed from a specific formula or calculation methodology, used to characterize a complex set of data.
Leading – Drive the performance of the outcome indicators, being predictors of success or failure. Examples of leading indicators are: “%
Employees involved in the innovation process”, “% Conversion rate” or “% Inventory quality ratio (IQR)”.
Lagging – Type of indicators that reflect the success or failure after an event has been consumed. Examples include: “$ Operating profit per
room”, “$ Earnings before interest and taxes (EBIT)” or “$ Cost avoidance savings”.
Input – Reflects assets and resources invested in or used to generate business results. Examples include: “# Headcount”, “$ Cost per
broadcast hour” and “# Knowledge materials distributed to employees”.
Process – Refers to the efficiency or productivity of a business process. Examples include: “% On time delivery”, “# Conflicts arisen during
the project”, “# Average call handling time” and “# Mean time to repair”.
Output – Measures the financial and nonfinancial deliverables or results of business activities. Examples include: “% Passenger seats sold”,
“# New customers acquired” or “$ Revenue per successful call”.
Outcome – Reflects overall results or impact of the business activity in terms of generated benefits, as a quantification of performance.
Examples include: “% Customer retention”, “% Employee turnover”, “$ Net income after taxes (NIAT)” or “% Brand awareness”.
Qualitative – A descriptive characteristic, an opinion, a property or a trait. The most common ones gauge customer or employee satisfaction
through subjective assessments. Based on a subjective interpretations of a customer’s or employee’s opinions. Oftentimes these type of
indicators are not expressed numerically, but as narrative text. Sometimes a rating is allocated to rank between levels (i.e. Likert scale).
Quantitative – A measurable characteristic, resulted by counting, adding or averaging numbers. Quantitative data is most common in
measurement and therefore forms the backbone of most KPIs. Operational systems that manage inventory, supply chain, purchasing, orders,
accounting, financial systems, all gather quantitative data by means of KPIs. Other examples of quantitative KPIs are “# Employee tenure”,
“# Units per man-hour” or “# Maintenance backlog”.
CE
RT I F I E D Certified KPI Professional
Training Course
KEY
PERFORMANCE
INDICATORS
MANAGEMENT
FRAMEWORK
KP
• Understand the complexities of working with KPIs and learn how to address them
AL
v 1.0 2012
PR N
I
OFESSIO • Develop a working knowledge of the Key Performance Indicators Management Framework
• Use over 30 performance measurement tools to facilitate the deployment and value added by KPIs.
Getting Key Performance Indicators (KPIs) right by using a rigorous KPI management framework
It was indeed a great opportunity to be able to participate at the KPI training course. Look forward for
Oct Kuala Lumpur
2013 Istana Hotel
other future programmes with Aurel. Aini, Malaysia
KPI
It was a good programme, through which I got a clear idea about modern practices in using KPIs. PRO
Shamima, Bangladesh
16-18 Dubai
12/12 Dusit Thani Nov Sydney
Good program, well organized. Well experienced trainer. Great job. Definitely recommendable. Jan Melbourne 2013 Karstens
Raech, India KPI Hotel 2013 The ANU
Conference &
KPI House
PRO KPI
I contacted smartKPIs.com for an in-house training with my team. We found both the material and the PRO Training Centre
PRO
way of explaining concepts by doing examples invaluable. I would also say that this is a great value for
money if you want to build the competency within your organization. Fahad, Saudi Arabia
Thank you for the excellent training workshop on KPIs. It was an eye-opening experience and provided
much needed guidance and clarification. The information gained has provided focus and depth.
Parsa, Bahrain
The feedback from the participants was gratifying and positive, and we are glad that we took the time
and effort to develop such a program to meet the need of our staff for extending their knowledge in the
area of KPI and all related. Hanan, Qatar
Aurel is knowledgeable of all KPI aspect and answers all questions. We were never bored. as the course
was very interactive. The course was beyond what expected. Nahla, Abu Dhabi I really learned a lot from the program. As a result, I am more equipped in in-
stalling performance management systems, by being able to integrate the con-
The trainer was excellent. I look forward to attend more sessions with him in the future. My knowledge
in the area has improved significantly. Great job! Neeti, Dubai
cepts of the MBO, Balanced Scorecard, KPI and Competencies into the system.
Thanks so much for the knowledge you shared during our 3 days of training.
I became a lot more knowledgeable about the KPI concept now. Manzuma, Nigeria Tess, Philippines
m R
vacant position % Performance appraisals completed on time % HR projects on time, on budget and according to
$ Net cash flow sK67 M 22.903 17.303 24.000 72% Comments Sep 2011
Optimize revenues and expenses
m ü
achievement.
Build an environment that fosters creativity and innovation
# Employee engagement index sK1836 Q 37 35 m 65 54% û Comments Sep 2011
# Ideas for new / improved service from employees sK4657 M 25 47 k 20 235% ü Comments Sep 2011
Continuously develop skills and competences
m ü
Publication date: 1 March 2011
# Training hours per full time equivalent (FTE) sK7 M 17 16 20 80% Comments Sep 2011
% Employees meeting continuing professional development requirements sk4673 Q 95% 83% m 85% 98% R Comments Sep 2011
Nurture high performing and motivated employees
% Employee satisfaction sk5912 Q 76% 92% k 70% 132% R Comments Sep 2011 ID number: sK0117011
% Employee turnover sK1 M 4% 9% k 7% 135% ü Comments Sep 2011
* Trend = current vs. previous month results ** Figures expressed in thousands of dollars Data not available due to measure being inactive
Dashboard
performance at organizational level.
Customer Service - Inbound Call Center Dashboard
Aug 2011
8.578
8.442
7.774
7.029
6.776
6.695
6.599
6.512
5.883
5.527
27% 30% 28% 49% 58% 59% 41% 43% 48% 51% 50% 47% 45% 58% 43% 45% 10 9 9 9
24% 23% 23% 6 6 8 6 6 7
14% 5 5 5
8% 11% 8% 7%
2% 0%
Employee turnover # Employee tenure # Average time to promotion % Accession rate % Succession plans for key
5 5 5
39% 38% 37% 39% 37% 39% 37% 40% 36% 37% 4 4 4 4
5 5 5 5 30% 31% 34% 33% 3 3
4 4 22% 26%
3 3 3 3 18% 14% 20% 17% 13% 17% 2 2
1 1 1 11% 1 1
4% 2% 1%
% Call transfer rate
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Unscheduled absence rate # Lost time injury frequency rate (LTIFR) # Employee engagement index # Employee
satisfaction # Employee advocacy for products and services # Employee advocacy for the organization as an em-
2010 2011 2010 2011 2010 2011 2010 2011
Customer Satisfaction
ployer % Performance appraisals completed on time % Training penetration rate $ Training investment per full time
% Customer satisfaction with service levels Target
equivalent (FTE) % Training return on investment # Employment brand strength % Job offer acceptance rate # Appli-
86% 87% 98% 99% 98%
62% 62% 55% 68% 51% 50% 72% 62%
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
2010 2011
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
level wage to local minimum wage % Unscheduled absence rate # Lost time injury frequency rate (LTIFR) # Employee
engagement index # Employee satisfaction # Employee advocacy for products and services # Employee advocacy
2010 2011 2010 2011 2010 2011 2010 2011
Agent Performance for the organization as an employer % Performance appraisals completed on time % Training penetration rate $
Training investment per full time equivalent (FTE) % Training return on investment
% Agent utilization # Service requests per agent % Agent availability rate 95% % Agent schedule adherence
88% 87% 79%
75% 69% 80% 75% 70% 68% 58% 73% 61% 70% 62%
58% 47% 52% 66% 63% 59% 66%
46% 50 56% 55% 50% 98% 82% 86% 94%
38 42 40 37 35 34 72% 62% 65% 65% 68% 79% 90% 70% 79%
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
ID number: sK0117021
2010 2011 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
2010 2011 2010 2011 2010 2011
Template © eab group Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html (“Template Terms”)
Budget
system.
Current State
Performance
Portfolio of Initiatives Performance Report
Scorecard
Mandate
Performance
Dashboard
KPI Description
smartKPIs.com pre-populated template. Developed for demonstration purposed only. To be customised as per the environment in which each organisation operates.
Template © The KPI Institute Pty Ltd 2012. Terms of use available at: http://www.smartkpis.com/terms-of-use.html (“Template Terms”)
PERFORMANCE
Jobs
MANAGEMENT 9 781478 181019
Legislation
in 2012
State of the discipline annual magazine Interviews
Performance Management... has to Organizations use principles, tools
Explore t
mos
online the sive
do with how to monitor, control and and techniques of Performance
manage the strategic and operational Management to ensure that the
comprehen of
direction of an organization... purpose of their existence is fulfilled.
catalogue KPI
d
documente .
examples
December 2012
Practitioners . Consultants keywords in Google Trends and articles . Portals . Communities
book launch
and public sector implementations in . Business Intelligence . Employee
182 countries reviewed CAREER Performance Management
Job trends by region . Salaries by industry