0% found this document useful (0 votes)
144 views28 pages

Annual Work Plan 2010 and 5-Year Sector Timeline 2010 - 2014

This document provides the annual work plan for 2010 and outlines strategic initiatives and timelines for the water, wastewater, and electricity sector over the next five years from 2010-2014 in Abu Dhabi, UAE. It discusses establishing a reliability center to coordinate power production, integrating variable renewable resources, reducing carbon emissions, supporting the 2030 strategic vision, reducing water waste, implementing demand side management programs, developing smart grid standards, and conducting smart metering trials. The five-year timeline section outlines generation, transmission, and distribution capacity targets for electricity over that period.

Uploaded by

Waqas Ahmed
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views28 pages

Annual Work Plan 2010 and 5-Year Sector Timeline 2010 - 2014

This document provides the annual work plan for 2010 and outlines strategic initiatives and timelines for the water, wastewater, and electricity sector over the next five years from 2010-2014 in Abu Dhabi, UAE. It discusses establishing a reliability center to coordinate power production, integrating variable renewable resources, reducing carbon emissions, supporting the 2030 strategic vision, reducing water waste, implementing demand side management programs, developing smart grid standards, and conducting smart metering trials. The five-year timeline section outlines generation, transmission, and distribution capacity targets for electricity over that period.

Uploaded by

Waqas Ahmed
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 28

ANNUAL WORK PLAN 2010

and
5-YEAR SECTOR TIMELINE
2010 - 2014
ANNUAL WORK PLAN 2010
and
5-YEAR SECTOR TIMELINE
2010 - 2014

Content

Part 1 - Key Strategic Initiatives ………………. 3


Part 2 - Five year timelines …………………… 7
Part 3 - Directional Targets …………………… 11
Part 4 - Annual work streams ………………… 15

This publication is aimed at an informed reader; that is, someone who is familiar with the water, wastewater
and electricity sector.
The Bureau’s publications, which include regulations, annual reports and consultation documents, are available
in PDF format for free download from our website (www.rsb.gov.ae).

ANNUAL WORK PLAN 2010 1


Statement of intent

The structure of our Annual Work Plan for 2010 has changed in terms of content and presentation
and has been broadened to include the introduction of Key Strategic Initiatives and Directional
Targets.

Part 1- Key Strategic Initiatives


We are to initiate a number of key strategic projects which may have an impact on the Sector in
the future. These projects are sponsored directly by the Bureau but, in most cases, will require the
co-operation of various licence holders. Costs, where incurred, will be allocated to the Sector, rather
than individual licence holders.

Part 2 – Five-year timelines


This shows how the Sector intends to meet demand requirements for water, wastewater and
electricity over the next five years.

Part 3- Directional Targets


We intend to continue our directional approach to licence holders, by the issue of Directional
Targets. Such targets seek to provide for improvements and are issued under our supervisory
powers. Progress on these will be reviewed quarterly with the affected licence holders.

Part 4 – Annual work streams


These form the bulk of our work and are more concerned with operational/ regulatory matters
rather than strategic ones.

Overall the Sector is and will be involved in almost all aspects of the expansion of the Emirate of
Abu Dhabi; from accommodating nuclear power stations on the electricity network to the small-
scale generation of renewable energy, possibly in customers’ premises. Whether new desalination
techniques, small wastewater treatment plants, irrigation standards or use of recycled or grey water,
everyone is touched by something the Sector does.

As a result, our work both within the Sector and the greater community, takes on an increasingly
important role in ensuring we provide suitable regulations and guidance in our ever changing
environment. Consequently, this publication seeks to set direction and reassure all stake-holders that
the Sector is at the forefront of providing support to the Government of Abu Dhabi in all that it
seeks to achieve.

Welcome to our 2010 Work Plan.

Nick Carter
Director General

ANNUAL WORK PLAN 2010 2


PART 1

Key Strategic Initiatives

ANNUAL WORK PLAN 2010 3


Part 1

Key Strategic Initiatives

1. Reliability of bulk power


In line with other technology-advanced countries, we are to establish an Abu Dhabi electric power
reliability centre (EPRC).

The Centre will be under the control of the Bureau and will co-ordinate submissions from ADWEC,
TRANSCO, and other UAE power and water production and utilities companies.

An annual forecast of Summer Reliability Assessment will be produced by the first quarter of
every year. The Assessment will provide the Government with a detailed overview of the Sector’s
robustness, including demand forecasts, reserve margins and primary fuel supplies availability.

2. Variable generation
As the Emirate adopts many new generation strategies and seeks to diversify away from ‘traditional
only’ generation, the need to integrate variable generation such as solar or wind power is important.
Variable resources are fundamentally different to fossil-fuel resources in that their primary fuel (solar,
wind, etc) is not storable (gas or oil are).

Therefore,TRANSCO and the distribution companies will be required to adopt a different approach
to the control and operation of large-scale variable generation over the coming years.

The Bureau’s role in this area is to ensure that suitable probabilistic models and control systems are
established by TRANSCO, AADC and ADDC, and that grid distribution access codes are modified
to reflect this new reality.

3. Carbon accounting
We intend to study the Sector from a carbon emission perspective. Initially, we will undertake a
Scope 1 carbon survey of the RSB’s activities and seek to expand this to other sector companies.

Scope 1 carbon accounting deals with the direct carbon (CO2) generated by an organisation, such
as energy or vehicle usage.

Understanding the key producing elements of carbon is an essential step in seeking to reduce CO2
and other greenhouse gases emissions.

4. Supporting 2030
We intend to publish our 2030 strategy supporting plan which will mesh in with the Government’s
2030 Strategic Vision. The plan will take account of new technologies such as nuclear power and
renewable energy targets, smart grids and trends in modern water management techniques. It is
a blue print for support but, like all plans, will need to react to changes in the Emirate and to the
introduction of differing technologies.

The Plan will be reviewed annually.

ANNUAL WORK PLAN 2010 4


5. Water usage
It is often printed that the UAE has a high per-capita water consumption. However, of the total water
delivered to the transmission system less than 20 percent is ‘Returned to Sewer’ (RTS). In effect, this
means the other 80 percent ends up on the ground, mainly through irrigation. Such low RTS values
are not in line with our strategy of seeking to meet the Singapore water standards of RTS which
are much higher.

For 2010, we will seek to fully understand and track all aspects of drinking water usage with a view
to reducing waste wherever possible and looking at smarter irrigation systems.

6. Demand Side Management (DSM)


DSM provides a range of options for indirect load control (by customers reducing load for example)
to load-cycle interruptions such as dynamic response using in-built devices for disconnecting large
loads, such as air conditioning, at critical peak power times.

Therefore, DSM, smart grids and variable generation all have an impact on grid stability and
generation expansion.

Currently, DSM research is being undertaken by the Executive Affairs Authority (EAA). However,
given the importance of reducing peak-load quickly, the RSB will seek to fast-track two aspects of
DSM namely:

1. Dynamic response
2. Peak reduction management

These two work-streams can be implemented by the Sector fairly quickly and still leave the EAA
work unaffected.

Our goal in this area is to seek to “Shave” 250 MW off the system peak by the end of 2012. This
would equate to a reduction in peak of some four percent.

7. Smart grids
Smart grids consist of a wide range of elements such as smart (electric) metering, wireless links,
distributed or embedded generation and storage devices (e.g. capacity storage).

Like all complex systems, smart grids work well when fully integrated and we intend to work with
all affected licence-holders to produce a range of operating and connection standards to be known
as “Smart Grid Operating Codes and Standards”

A consultation document will be produced this year.

ANNUAL WORK PLAN 2010 5


Part 1

8. Smart metering trials


Over the past few years, both AADC and ADDC have been installing electronic meters, initially for
automatic meter reading (AMR) purposes. However, the potential uses of these meters exceeds
AMR and they could form the basis for a range of smarter solutions in terms of tariffs and power
purchasing options – thereby driving down demand and system peaks.

Over the coming year we intend to sponsor two trials with the distribution companies.

1. Energy purchasing trials

A sample number of volunteer customers will be provided with electronic displays to enable them
to utilise “Time of Day” electricity pricing. For example, buying electricity in the evening would be
cheaper than in the afternoon. Customers living in large premises will form the main sample. This
work will build on the trials recently undertaken in Singapore.

2. Pre-payment schemes

The energy costs associated with flat occupancy tends to be fairly constant, given most air conditioning
is central and paid by landlords. The “cost to serve” such customers by a distribution company are
high, compared with a customer’s income.

Therefore, we intend to work with one of the companies to install pre-paid meters in a number of
premises (flats). The trial will last for at least a year and will provide an opportunity to look to install
pre-paid meters, as a norm, in high-rise buildings.

ANNUAL WORK PLAN 2010 6


PART 2

Five-year timelines

ANNUAL WORK PLAN 2010 7


Part 2

Five-year timelines
Electricity
2010 2011 2012 2013 2014
Generation (grid connected)

Conventional

- Construction of S2 at Shuweihat by
1,510 MW
GDF Suez Energy International
- Construction of F2 at Fujairah by 2,000 MW
International Power and Marubeni
- Al Zawra - relocation of 4 gas turbines 400 MW
to Al Gharbia
- Emirates Aluminum 250 MW

- Evaluation and construction at S3 1,600 MW

- Evaluation and construction of a new 2,400 MW


power station

Renewable energy

- Shams 1- concentrated solar power 100 MW

100 MW
- Shams 2- concentrated solar power
100 MW
- Shams 3- concentrated solar power

Available generation capacity (MW*)

20,000

15,000

10,000

5,000

Transmission and distribution


- Completion of three 400kV grid sub- Distribution
stations for Mahawi, Shamkha and Bahia works
- 400 kV connections to EMAL aluminium First circuit Second circuit
smelter at Taweelah
- Construction of GCC grid connections
To Oman To Saudi Arabia

- Provision of major electricity connections Qidfa and ADNOC at Ruwais,


Sweihan S2 Bab, S3 Taweela C
- Provision and commissioning of ICAD 400kV ICAD 220KV
transmission grid to ICAD

All figures approximate


* MW = megawatt

Sources: ADWEC – Statement of Future Capacity Requirements 2009 - 2030


TRANSCO›s 2009 Five-year Planning Statement (2010 – 2014)

ANNUAL WORK PLAN 2010 8


Drinking water
2010 2011 2012 2013 2014
Desalination

- Construction of S2 at Shuweihat by
100 MGD
GDF Suez Energy International
- Construction of F2 at Fujairah 130 MGD
by International Power and Marubeni
- Expansion of F1 30 MGD

- Evaluation and construction of a new


desalination plant 240 MGD

Available desalination capacity (MGD*)

13,000

1,000

500

Transmission and distribution


- Fujairah to Al Ain phase 2 transmission 100 MGD
scheme
- Mirfa to Muzairah transmission scheme 20 MGD 20 MGD
(Al Gharbia) - 110 km
- Taweelah to Al Ain transmission scheme- 100 MGD
dependent on C3
- Shuweihat transmission scheme third 100 MGD
pipeline - dependent on S3
- Major transmission scheme to Abu Dhabi,
Reem, Sowa and Saadiyat Islands and
develoments in eastern region
- Al Ain water distribution network
(full pressurisation of system)
- Mirfa to Abu Dhabi transmission scheme- 100 MGD
dependent on additional production in Mirfa

All figures approximate


*MGD = million gallons per day

Sources: ADWEC – Statement of Future Capacity Requirements 2008 - 2030


TRANSCO›s 2009 Five-year Planning Statement (2010 – 2014)

ANNUAL WORK PLAN 2010 9


Part 2

Wastewater
2010 2011 2012 2013 2014

Abu Dhabi Region


- Mafraq enhancement scheme
50 MLD

- Commissioning of ICAD plant 40 MLD

- Etihad Biwater - phase 1 at Al Wathba 300 MLD


(final construction and commissioning)
- Veolia Besix - phase 2 expansion at 300 MLD
Al Wathba (under construction)
- Proposed decommissioning of -150 MLD -240 MLD
Mafraq (phase 1 & 2)
- MBR Treatment Plant 45 MLD -15 MLD

Al Ain Region
- Etihad Biwater - Phase 1 at Al Saad 80 MLD
(final construction and commissioning)
- Veolia Besix treatment plant at Bida
130 MLD
Hamama (under construction)
- Decommissioning of old Zakher plant
-99 MLD

- Decommissioning of temporary
-10 MLD -5 MLD
package plants

Island developments
- Reem (new plants and evaluation of flow 95 MLD
diversion to STEP at 2014)
- Saadiyat (new plants and evaluation of 72 MLD
flow diversion to STEP at 2014)
- Yas (new plants and evaluation of flow 57 MLD
diversion to STEP at 2014)

STEP Tunnel Commissioning

Wastewater treatment capacity (MLD*)

1,500

1,000

500

All figures approximate


*MLD = megalitre per day

Source: ADSSC’s Five-year Planning Statement 2008 and 2009

ANNUAL WORK PLAN 2010 10


PART 3

Directional Targets

ANNUAL WORK PLAN 2010 11


Part 3

Directional Targets

The targets listed below are directed at licence holders and will be encouraged using our supervisory
powers as defined in law.

1. Improve OPEX performance AADC, ADDC


Both distribution companies have much to do in order to drive their operational expenditure
(OPEX) so as to be in line with more acceptable global performance measures.

Therefore, we are seeking substantial improvements in two areas: ‘cost per customer’ and ‘cost per
unit delivered’. Our view is that both companies could reduce their costs by 30 percent in real terms
over the next four years.

2. Payment schemes to customers AADC, ADDC


Offering a range of payment options benefits both customers and distribution companies as it
makes paying bills easier. It reflects a distribution company’s commitment to customer service.

In 2009, both distribution companies introduced two new payment options using credit cards: online
and phone payment.This adds to the existing payment options (in person at service centres, by post
and through banks) and compliments the existing payment arrangements available to customers
experiencing payment difficulties.

We aim to focus the distribution companies’ efforts for 2010 on expanding bill payment centres to
everyday places such as supermarkets, post offices and service stations and bill smoothing payment
arrangements, such as payment cards.

3. Full pressurisation of water network AADC


At present, some 30 percent of AADC’s customers and 10 percent of ADDC’s customers receive
an intermittent supply of potable water. Full pressurisation, to a minimum head of 12.5m, in a
water network is necessary to ensure compliance with water quality requirements and to provide
wholesome and continuous supplies of water. The present need for ground and roof storage will be
greatly reduced, or eliminated for some building types, when full pressurisation is achieved. This will
in turn maintain the high quality of water delivered within the building.

Full pressurisation is therefore a critical area for network system improvement and should be met
by the end of 2012.

4. Complete all MDEC interface metering TRANSCO, AADC, ADDC


The Meter and Data Exchange Code (MDEC) defines the minimum standards for interface metering
between licensees. Compliance with this code has been a requirement since 1999. Licensees have
been slow to upgrade their metering systems and there still remains some nine percent of electricity
meters and 35 percent of water meters which still do not meet the standard as defined in MDEC.

We will seek to ensure all interface metering between licensees is to MDEC standard.

ANNUAL WORK PLAN 2010 12


5. Leakage reduction AADC, ADDC
Understanding water loss and unaccounted for water remains a challenging area for distribution
companies but provides an opportunity to improve the performance of their network systems
and save a valuable resource. Accurate and comprehensive flow metering on distribution input and
consumption volumes on a zonal basis is a pre-requisite to understanding leakage.

AADC and ADDC are required to report on water losses using the International Water Association
(IWA) template. Once losses are understood and accurately measured, active leakage control
measures can be implemented and the volume of leakage reduced.

An acceptable level of leakage for the age, type and design of this network system is set at 10% on
the distribution input volume. This shall be achieved by the end of 2012.

6. Remove water transmission constraints TRANSCO


Transmission constraints have existed in TRANSCO’s network for many years: the outcome is chiefly
observed in the intermittent water supply service in Al Ain.

Transco shall re-enforce the transmission system at key locations such that all supply constraints for
current and future demands are removed by the end of 2011.

7. New supply licence for ADWEC


With the change in law following the issue of Law No (9) of 2009, the Bureau can, subject to terms,
issue supply licences to other entities operating in the Sector.

Therefore, we foresee a position whereby ADWEC (the Single Buyer) could be issued a supply
licence, allowing them to sell directly to major customers connected to the transmission system.
Currently, the system is cumbersome in that only distribution companies sell to customers. This also
applies to large users who are not connected to a distribution company’s network.

We will seek to ensure the above is completed before the end of 2010.

ANNUAL WORK PLAN 2010 13


ANNUAL WORK PLAN 2010 14
PART 4

Annual work streams

ANNUAL WORK PLAN 2010 15


Part 4

Annual work streams

Customer support

Customer Metering Regulations


A review of the application of the Customer Metering Regulations 2003 will be carried out. It will
focus on the need for a policy on remote meter reading (AMR meters) and prepayment tariffs
(including facilities for automatic disconnection / re-connection).

Customer service licence conditions


In 2009, the Bureau led a Customer Services Working Group, which included participants from both
distribution companies. Its purpose was to address outstanding deliverables under distribution and
supply licences, e.g. to prepare and issue a Code of Practice on Disconnection for Non-Payment. We
will continue this collaborative approach in 2010 to ensure compliance with all customer-focused
licence conditions.

Regulatory guidelines for new connections


Many issues and concerns have been raised due to poor clarity in, and standards for, the design
of connections to distribution networks. These include network boundary issues, asset ownership
and handover, metering and operational control, and require clear guidelines and standardisation
of connection types. In addition, the distribution companies have made little progress towards
implementing the methodology of connection charges we proposed in our 2008 consultation
document. We will therefore issue a regulatory guideline which will define the principles, methods
and steps to be taken when making new connections.

Strengthen and monitor customer service standards


An independent audit of the distribution companies’ compliance with the guaranteed customer
service standards was completed in 2009. The scope of the audit covered internal processes for the
recording and reporting of data to the Bureau, as set in the standards, together with their level of
performance against the standards.

Following a review of the auditors’ report and consultation with the affected companies, we intend
to provide assistance with the development and enhancement of existing internal processes. This
should provide for more accurate reporting to the RSB on the companies performance against the
standards.

We will also implement any consequent amendments to the Code of Practice on Guaranteed and
Overall Service Standards plus continue to monitor the companies’ performance in this area.

ANNUAL WORK PLAN 2010 16


Production

Efficiency Improvement Project - ECPC plant modification


In 2009, ECPC undertook a project to improve plant efficiency by recovering further heat at the
exhaust of the Heat Recovery Steam Generator (HRSG), to supply low-pressure steam that could
be used at the desalination plant. We will study this project, its objectives and potential advantages,
and establish whether such a modification could benefit other IWPPs.

Electronic Dispatch Logging (EDL)


TRANSCO has introduced a mechanism whereby instructions to generation/desalination units are
sent electronically instead of being given by telephone. We will review the implementation of EDL
at a selected site and establish how effective such a system is at both ends, i.e. at the plant and at
TRANSCO.

Plant maintenance regime


In order to ensure a secure and uninterrupted power system, regular plant maintenance is essential.
We will review the maintenance regime and procedures of a selected power plant to identify the
benefits and disadvantages of such a programme. We will also explore potential improvements that
could maximise reliability and availability.

Review of Economic Dispatch


TRANSCO has an obligation under its licence to ensure the economic dispatch of production plants
in the Emirate. This means that they should be dispatched in such a way as to minimise the costs
(including fuel costs) paid by the single buyer (ADWEC) to the production companies under the
power and water purchasing agreements (PWPAs), taking account of factors such as plant availability
and transmission constraints.

Given that production costs in 2008 amounted to AED 7 billion, even a small improvement in the
efficiency of the dispatch decisions could have a significant impact on sector costs. The review will
also examine the efficiency of the dispatch process in circumstances where gas supply constraints
require production plants to operate on back-up fuel.

ANNUAL WORK PLAN 2010 17


Electricity

Capital expenditure (capex) on network performance


The reliability of transmission and distribution networks is monitored by key performance indicators,
which are externally audited and linked to the price controls. We will consult on a new procedure
which will require companies to make specific expenditure provisions for targeted network
performance improvement programmes.

Demand forecasting procedures implementation


Following consultation on the Bureau’s proposed demand forecasting procedures in 2009, we will
work with the sector companies to implement improved processes to address weaknesses and
inaccuracy in demand forecasts. This will be based on demand assessment data collected in 2009.

Design standard for 22kV systems (protection)


Distribution companies are developing a number of 22kV networks and, given their large capacity,
special consideration needs to be given to security designs. We will propose an enhanced security
standard for 22kV networks using ‘unit’ protection in a consultation document. This design standard
will eventually be issued as an Annex to the Distribution Code.

Electricity Wiring Regulations – training and registration


This training began in 2009, and we will continue to monitor the courses being conducted by
two training companies. We will also oversee examinations and issue Registration Certificates for
electrical engineers, whose names are recorded in the Bureau’s database and listed on our website.

High voltage (HV) assets - operational training


Currently there is little or no control of the competency level of staff responsible for operating HV
assets in customers’ premises (e.g. factories, shopping malls, district cooling plants). We will identify
a suitable training programme and issue requirements for staff to be authorised to operate and
maintain HV assets.

Transmission Code amendment - Renewables


The Transmission Code will be reviewed to address requirements for the connection and operation
of embedded generation, particularly renewables, which operate on base load and cannot contribute
to reserve capacity requirements. This work will be undertaken through the Transmission Code
Review Panel.

Additional work streams


• Audit of TRANSCO’s operational procedures
• Review of existing HV customer connections
• TRANSCO’s and distribution companies’ five-year planning statements
• Protection Systems Review – distribution
• Distribution Planning & Design Standards

ANNUAL WORK PLAN 2010 18


Health, safety and environment

ADSSC review
During 2009, an external organisation performed a Health and Safety Review and produced a
comprehensive report with prioritised recommendations.The Bureau (HSE and Wastewater teams)
will monitor the implementation by the Abu Dhabi Sewerage Services Company (ADSSC) of the
recommendations in the report.

Health and safety management and operational reviews: TRANSCO, ADDC


and AADC
We intend to undertake a review of licence holders practices and procedures relating to health
and safety management, and identify areas for improvement. These reviews will compare licensees’
performance against utility best practice, and will allow the development of a list of recommendations
leading to improvements in performance.

Personal Protective Equipment Regulations


Reviews of recent accidents in Sector companies highlighted the inconsistent use of personal
protective equipment (PPE), both by company employees and contractors. Although the Sector’s
Safety Rules require the use of PPE, they lack detailed guidance on specific job requirements and the
specification of equipment. We will work with licensees to develop PPE Regulations for the Sector;
which will define the quality and selection of such equipment, and its use in protecting all employees
and contractors.

Streetworks and Access Regulations – Code of Practice


The Sector’s network companies have assets located underground in public and private areas
throughout the Emirate. Licensees have developed various procedures with the relevant government
agencies to address the issues associated with permitting network companies to gain access to their
assets for operational purposes.

During 2010, we will consult with all licence holders and the relevant agencies before finalising and
issuing a Streetworks and Access Regulations Code of Practice for the Sector.

ANNUAL WORK PLAN 2010 19


Drinking water
Bio-fouling control at seawater intakes – detailed research
An internal bio-fouling control study in 2009 recommended that further assessment of alternative
bio-fouling control methodologies should be carried out by an experienced external consultant
or research body. Recommendations on the feasibility, cost and benefits of alternative bio-fouling
control solutions for the UAE will be published in due course.

Chlorination system evaluation


The Report on the Bromate Source and Reduction Study advised that better management controls
are required for the chlorination systems from the production plants to the customer, in order to
ensure that the formation of Bromate is minimised and that levels comply with the Regulations.
The Bureau commenced with an audit of the chlorination management systems in October 2009.
Efficiency evaluation will be a critical element in the process of maintaining the reduction of Bromate
formation throughout the supply chain.

Fire-fighting Management Systems


In 2009, the Urban Planning Council (UPC) sought the Bureau’s involvement in implementing a
world-standard fire-fighting management system across the Emirate, and in particular for the mega
developments envisaged in their “Plan Abu Dhabi 2030”.

We have undertaken preparatory investigations in outsourcing a study to specialised consultants. In


collaboration with the UPC and the Civil Defence, it is envisaged that the project will progress in
two stages: firstly a study of current practices and recommendations for improvement, and secondly
implementation of the recommended options.

Water quality: total dissolved solids


Following post-treatment modifications to remove seawater blending (which was found to
contribute to Bromate formation) at the production facilities, there was a reduction in the natural
levels of total dissolved solids (TDS). The Bureau intends to investigate the feasibility of meeting the
TDS prescribed value in the Water Quality Regulations.

Water supplied by commercial tankers


A considerable number of consumers receive their potable drinking water supplies by road tanker.
This can be for a variety of reasons and purposes. Road tankers are owned and operated by private
and commercial entities, some leased to the distribution companies for designated contracts, and
some operating privately. We intend to explore all the issues concerning tankered water supplies
with all stakeholders and implement a safe, secure and efficient system which safeguards the needs
of all legitimate consumers.

Additional work streams


• Compliance with Water Quality and Management
• Compliance with Water Supply Regulations

ANNUAL WORK PLAN 2010 20


Wastewater
Grey water
A number of developers in the Emirate are considering the use of grey water technologies for
localised treatment and reuse of wastewater from baths, showers, washbasins and washing machines.
We consider grey water collection, treatment and reuse as regulated activities requiring a licence.

Therefore, in the interests of public health and environmental protection, water quality for reuse
purposes will be subject to the Recycled Water and Biosolids Regulations, to be published in 2010.
Accordingly, we will conduct a review of the impact of grey water treatment, considering issues such
as available technologies, Emirate practice, quality risks, licensing issues and impact upon downstream
infrastructure. This project may lead to field-based studies and sampling programmes which will
provide a greater understanding of the risks associated with the use of recycled water.

Issue Regulations on Trade Effluent Control, Recycled Water and Biosolids


Following a public consultation in 2009, we will revise the draft Regulations as appropriate and issue
the final Regulations during 2010.

The Trade Effluent Control Regulations will set a framework for the safe, economic and sustainable
collection, treatment and disposal of industrial wastewater produced in the Emirate.

The Recycled Water and Biosolids Regulations will set quality standards and provide guidance for
treated sewage effluent or recycled water and biosolids reused in the Emirate. This work plan
project will also involve work with licensees to develop reporting requirements and compliance
programmes.

Recycled water sampling programme


Following recommendations from the interim Regulations Review Panel, we intend to manage a
project to monitor the quality of recycled water from the point of production to the point of use.The
project will run for a 12-week period; its aim is to discover whether there is any degradation in water
quality throughout the network. The final draft of the Recycled Water and Biosolids Regulations will
incorporate the findings of this project.

Additional work streams


• Sector Codes
• Security Standards
• Wastewater licence application process review

ANNUAL WORK PLAN 2010 21


Economics
Interruptible tariffs for customers
Due to the extreme UAE summer climate, and the associated widespread use of air conditioning,
the Sector experiences very high peak electricity demand in the summer in comparison to annual
average electricity demand. As it is peak demands that drive the need for additional investment in
electricity production and transmission capacity, significant benefits can be derived from providing
customers with an incentive to reduce their power demands during system peaks.

One means of providing such incentives is via “interruptible tariffs”, whereby industrial customers
who have some flexibility within their production processes can be provided with payments or
refunds or lower tariffs during off-peak periods in return for allowing the system operator to reduce
or interrupt their electricity demand during system peaks. We intend to develop this approach more.

Annual review of Large-User Tariff


Customers with demand in excess of 1 MW are entitled to apply to the distribution companies
(AADC or ADDC) for a large-user tariff. Such tariffs are required to be cost-reflective, and are
subject to the approval of the Bureau. The Bureau has agreed with the distribution companies a
time-of-day tariff to be made available to all large users connecting directly to the transmission
system. As in previous years, during 2010 the Bureau will review this tariff against out-turn costs for
2009 and against projected BST and TUoS charges for 2010, to confirm the tariff continues to be
cost-reflective.

Economic level of leakage


While it is impractical to eliminate all leakage on water distribution networks, the level of leakage
should be expected to be relatively low where the water distribution network is of a high standard.
In order to determine the “economic” level of leakage (ELL), it is necessary to balance the costs
of water loss through leakage against the cost of leakage reduction efforts and investments. We
therefore intend to develop a methodology, to calculate the ELL for AADC and ADDC. This can in
turn be used in future years to set targets for reductions in leakage and will be completed once our
Water Usage (1.5) project is finished.

Additional work streams


• Approval of 2009 BST Exceptional Charges and 2011 BST Leaflet
• Approval of 2011 TUoS Charges Statement
• Approval of ADWEC’s 2010 Seven-Year Statement
• Cost benchmarking dataset review and annual report
• Monitoring Mechanism for Water Transmission Constraints
• Review of 2010 AIS and TA Reports
• ADWEC price control (PC4 Period)
• PC3 – Network companies CAPEX efficiency review
• Economic price of embedded renewable energy
• Development of DSM Financing Mechanism

ANNUAL WORK PLAN 2010 22


Objectives
The primary objectives of the Bureau are established in Law No (2) of 1998.
They are:-
• To ensure, so far as it is practicable for it to do so, the continued availability of potable water
for human consumption and electricity for use in hospitals and centres for the disabled, aged
and sick.

Overall objectives are:-


• To apply sound economic and technical regulation and supervision to all licence holders
throughout the Emirate of Abu Dhabi’s water, wastewater and electricity sector.
• Ensuring full licensee compliance with all licence conditions, regulations, codes and other
documents in force.
• Establishing sound documented management procedures for all Bureau functions.
• Ensuring the welfare and development of all Bureau staff in order to enable them to meet the
objectives given in this work plan.
• Representing the interests of all stakeholders in the water, wastewater and electricity sector,
especially customers.

The above recognise the issue of Law No (2) of 1998 and its amendments in Law No (19) of
2007 and Law No (9) of 2009, concerning the Regulation of the Water and Electricity Sector in the
Emirate of Abu Dhabi.

In addition, the Wastewater Sector is subject to Law No (17) of 2005 concerning the establishment
of the Abu Dhabi Sewerage Services Company, as amended by Law No (18) of 2007, Law No (12)
of 2008 and Law No (12) of 2009; and Law No (2) of 1998 as amended.

ANNUAL WORK PLAN 2010 23


Sector structure

The structure is illustrated in terms of its supply chain components and Regulated Activities and
all companies undertaking the activities shown are in possession of a licence issued by the Bureau.

PWPA* admin ADWEC Sells output to supply business

Collection

Treatment

Disposal
Customer connection
Transmission Distribution

Supply sales
Production
Irrigation
Transmission Distribution Waste
water Bio-solids

* PWPA = Power and Water Purchase Agreement

Production of power and water is mainly in private hands and connects directly to the strategic
transmission company (TRANSCO) to enable the efficient movement of bulk supplies of water and
electricity to major demand and load centres throughout the Emirate. All water and power output
is purchased by a single buyer, the Abu Dhabi Water and Electricity Company (ADWEC).

The distribution and supply (sale) of water and electricity to customers is undertaken by distribution
companies who are in possession of a distribution and supply licence. Currently, there are two
distribution companies in the sector: Al Ain Distribution Company (AADC) which covers the old
municipality region of Al Ain and Abu Dhabi Distribution Company (ADDC) which covers the old
municipality region of Abu Dhabi including Al Gharbia (the Western Region).

The wastewater collection network and treatment plants are predominantly owned and operated
by the Abu Dhabi Sewerage Services Company (ADSSC), with disposal of treated sewage effluent
(TSE) to irrigation companies.

ANNUAL WORK PLAN 2010 24


Document reference: ER/P01/014

P.O.Box 32800 Abu Dhabi,