0% found this document useful (0 votes)
191 views1 page

Reflected Ceiling Plan Schedule of Doors and Windows: D C B A D C B A

1) The document contains a technical drawing with labeled dimensions and notes describing a building structure. 2) Key details shown are ceiling joists spaced 40cm apart, 6mm thick marine plywood sheeting, and notes specifying door and floor details. 3) The drawing and notes provide specifications for constructing part of a building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
191 views1 page

Reflected Ceiling Plan Schedule of Doors and Windows: D C B A D C B A

1) The document contains a technical drawing with labeled dimensions and notes describing a building structure. 2) Key details shown are ceiling joists spaced 40cm apart, 6mm thick marine plywood sheeting, and notes specifying door and floor details. 3) The drawing and notes provide specifications for constructing part of a building.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

4.

25

A B C D A B C D
10.00 10.15 1.00 0.70
1.00 4.00 4.00 1.00 4.00 4.00 2.15 0.90 0.60
6 mm THCK MARINE PLYWOOD
ON 2" X 2" CEILING JOIST

3.20
SPACED @ 40cm O.C BOTHWAYS

1 1

2.15

2.15
2.10

2.10
4.50

4.50
FI N. FLOOR LI NE

NO. OF SET: 3 - SET NO. OF SET: 2 - SET


NO. OF SET: 2 - SETS
LOCATION: OFFICE LOCATION: COMFORT ROOM
LOCATION: WAREHOUSE
TYPE: SOLID PANEL DOOR
2 2 TYPE: G.A 24 (6mm THCK) G.I ROLL UP DOOR
COMPLETE WITH HARDWARE AND ACCESORIES
W/ 2"x6" WOODEN JAMBCOMPLETE WITH
TYPE: LIGHTED PVC DOORCOMPLETE WITH
HARDWARE AND ACCESORIES
HARDWARE AND ACCESORIES
13.50

13.50
4.50

4.50

3 3 2.40

1.00
4 4
4.50

4.50

1.35
2.25
6 mm THCK MARINE PLYWOOD
ON 2" X 2" CEILING JOIST

1.00
SPACED @ 40cm O.C BOTHWAYS

5 5
2.65

2.25

8.81

4.85
0.60 0.60 0.60 0.60 0.60
6.50

6 6
4.50

0.65
3.50

1.30
2.25

2.15

2.15
7 7

1.50
1.00

1.00

0.85
4.00 4.00 2.15
FI N. FLOOR LI NE
10.15

NO. OF SET: 7 - SETS NO. OF SET: 2 - SETS NO. OF SET: 2 - SETS


LOCATION: WAREHOUSE LOCATION: OFFICE LOCATION: COMFORT ROOM
TYPE: 150mm x 300mm x TYPE: 0.60m x 1.20 m TYPE: 0.60m x 0.60 m
150mm THCK CONCRETE ALUMINUM FRAME41 THK. ALUMINUM FRAME41 THK.
LOUVER BLOCK WINDOW JALOUSIE WINDOW JALOUSIE WINDOW

A REFLECTED CEILING PLAN


1 4

A SCHEDULE OF DOORS AND WINDOWS


2 4

SUB-PROJECT ID No. PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO:

REPUBLIC OF THE PHILIPPINES


REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF AGRICULTURE
PHILIPPINE RURAL DEVELOPMENT PROJECT
PROVINCIAL GOVERNMENT
OF EASTERN SAMAR
CONSTRUCTION OF CONSOLIDATION
CENTER OF EASTERN SAMAR SEAWEED PRODUCTION
AND TRADING ENTERPRISE
AR. ARNULFO B. DOTINCO ENGR. THOMAS A. CAMPOMANES
HEAD - PMO OFFICE
VIRGILIO P. CAPON
PPMIU HEAD
HON. BEN P. EVARDONE
GOVERNOR
REFLECTED CEILING PLAN
SCHEDULE OF DOORS AND
A
PROJECT MANAGEMENT OFFICE

LOCATION: ARTECHE EASTERN SAMAR PRC No:


ARCHITECT II
WINDOWS
4 5

You might also like