Construction Checklist: SL. No. Check Item Refference Yes No NA SAE SDE Material, Type of Shuttering

This document contains a construction checklist for shuttering work with the following key points: 1. It lists various items to check for shuttering work including material quality, support, planning, and special considerations for piles, footings, columns, slabs, and beams. 2. The checklist is to be used to inspect shuttering work at various levels and locations of a construction project, with yes/no responses for each item. 3. Sign-off is required from the contractor, site agent engineer, sub-divisional engineer, and executive engineer after completing each level of inspection.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
171 views2 pages

Construction Checklist: SL. No. Check Item Refference Yes No NA SAE SDE Material, Type of Shuttering

This document contains a construction checklist for shuttering work with the following key points: 1. It lists various items to check for shuttering work including material quality, support, planning, and special considerations for piles, footings, columns, slabs, and beams. 2. The checklist is to be used to inspect shuttering work at various levels and locations of a construction project, with yes/no responses for each item. 3. Sign-off is required from the contractor, site agent engineer, sub-divisional engineer, and executive engineer after completing each level of inspection.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

D.

Form1/2

CONSTRUCTION CHECKLIST

Name of the Project:


Date of inspection:
Name of the building:

Location of inspection in the building:

Name of the Sub-Division:

Name of the Division:

STEP D: CHECKLIST FOR SHUTTERING WORK


1st Level 2nd Level
Checked Checked
SL.
CHECK ITEM
NO. Refference YES NO NA SAE SDE Comments

1 Material, type of shuttering:


1) Shuttering materials are proper (steel)
Forms are cleaned with steel scraper or steel brush
to make it free of rust, mortar encrustations or other
2) foreign material.
3) No scrapped/ deformed shutter is used.
Gaps/holes in the form are closed with paper, putty
or with thin metal steels to prevent leakage of
4) cement grout.

2 Support, props:
1) Quality of prop is proper. (steel piles)
Interval of props are saficfactory. (maximum 2.5ft)
2)
Proper struts are used to separate the foundation
3) formworks.
4) Props at both ends are tighten.
Measures are taken to prevent settlement of props
5) at ground level
6) Loose props/defective props are removed.
7) Proper packing are ensured to check leakage.
3 Shuttering planning:
1) Turn bolt are fixed properly.
2) Nuts and bolt are fixed properly.
3) Electric conduits are set properly before casting.
4) Provision of sanitaly ducts are provided properly
5) Watertightness is ensured in the formwork.
Clear cover is set properly (saline & none-saline
6) zone considered)
7) All unused poltythine sheets are removed.
9) Level of shuttering is proper.
10) Horizontal alighment of shuttering is proper.
11) Vertical alighment of shuttering is proper.
4 Special check for pile casting:
1) Pile casting platform is perfectly is plane.
Pile form works are placed straight and size of each
2) pile is ensured.
3) Vertical alighment of pile shuttering is proper.
Measures are taken for Water tighthness to ensure
4) quality of concrete

CONTRACTOR : Name- Signature:

SAE : Name- Signature:

SDE: Name- Signature:

EE: Name- Signature:


D. Form2/2

CONSTRUCTION CHECKLIST

Name of the Project:


Date of inspection:
Name of the building:

Location of inspection in the building:

Name of the Sub-Division:

Name of the Division:

STEP D: CHECKLIST FOR SHUTTERING WORK


1st Level 2nd Level
Checked Checked
SL.
CHECK ITEM
NO. Refference YES NO NA SAE SDE Comments

5 Special check for Footings/ Pile Caps:


Proper struts are used to separate foundation
1) frameworks.
Cork sheets are used to separate very adjacent
2) footing foundation.
6 Special check for columns:
Use of wooden shutter for column is strictly
1) prohibited, therefore no wooden shutter is used.
Forms made of 16 SWG steel sheet and angles
2) with holes for fixing and tightening are prepared.
3) Height of form is within 5’-6”.

Column form are tighten with nuts and bolts at


every hole with T-Bolts by putting jute/ foam gaskit
4) in the overlapped surface of the the two shutters.

In addition to turn Bolt and T-Bolt fixing in the


5) column shutter, props as struts in inclined are used.
6) Uniform lateral supports are ensured.
7) Column shutter is found 100% vertical.
When location of shuttering height exceeds 12 feet,
special type of scaffolding with cross bracing is
8) used.
9) Scaffolding is set for safety where it is necessary.
7 Special check for slab and beams:
Steel shutter for beams are prepared made of 16
SWG steel sheets with necessary holes and
1) clamps and strong MS Angle Frame.
Free end of platform sheet of slab is is fixed with
2) beam shutter.
Special strut bolts are used in the middle of deep
3) beam to prevent fattening.
Special Measures are taken to retail the alignment
4) of edge beams and slabs.
Steel props are placed @ 2’-6’’ C/C are used for
5) slab.
Support for each prop is OK to check against
5) deflection (in case of ground floor slab).
6) Form of slab is found leveled properly.
In case of double height of slab of beam,
scaffolding is done as per approved design from
7) concerned Design Division.
8) Camber is done (if any)

CONTRACTOR : Name- Signature:

SAE : Name- Signature:

SDE: Name- Signature:

EE: Name- Signature: