0% found this document useful (0 votes)
379 views1 page

SWE80E9电路图

The document discusses an excavator's electronic working principle diagram and GPS unit connections including power, start signals, travel switches, pilot switches, ACC signals, battery relay control, and CAN bus connections.

Uploaded by

Harciptono Cipto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
379 views1 page

SWE80E9电路图

The document discusses an excavator's electronic working principle diagram and GPS unit connections including power, start signals, travel switches, pilot switches, ACC signals, battery relay control, and CAN bus connections.

Uploaded by

Harciptono Cipto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SWE80E9 exavator

electronic working
priciple diagram

GPS UNIT
1:power +24V 2:GND
3: start signal(input) 4:start signal(output)
5:travle H/L switch power 6:pilot switch power
7&9:ACC signal("ON"postion)
10:battery relay control signal
11:485-(CAN-L) 12:485+(CAN-H)

You might also like