0% found this document useful (0 votes)
128 views12 pages

Resume N. Arungandhi Dce, Be

This resume is for N. Arun Gandhi applying for the position of Senior Site Engineer. He has 7 years of experience as a Project Site Engineer in Bangalore working on bridge projects. He has a Bachelor's Degree in Civil Engineering and is proficient in MS Office and Windows. His experience includes overseeing construction execution, coordinating teams, managing schedules and budgets, and client coordination. He is currently working as a Site Senior Engineer on NHAI projects involving underpass and retaining wall construction.

Uploaded by

Arun Civil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
128 views12 pages

Resume N. Arungandhi Dce, Be

This resume is for N. Arun Gandhi applying for the position of Senior Site Engineer. He has 7 years of experience as a Project Site Engineer in Bangalore working on bridge projects. He has a Bachelor's Degree in Civil Engineering and is proficient in MS Office and Windows. His experience includes overseeing construction execution, coordinating teams, managing schedules and budgets, and client coordination. He is currently working as a Site Senior Engineer on NHAI projects involving underpass and retaining wall construction.

Uploaded by

Arun Civil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

RESUME

N. ARUNGANDHI DCE, BE
Akkanur-Po,
Titakudi-TK,
Cuddalore Tamil Nadu, India
Email:aruncivil310@gmail.com
Contact No: +91-9994835628

TO

The Human Resources Department,

Sub: Application for the post of Senior Site Engineer

Respected Sir,

I would like to introduce myself as N.ARUNGANDHI, DCE, BE (CIVIL) with 7 years

experience in the construction field. Right now I am working a Project Site Engineer for the

shimmoga Bridge Project at Bangalore Region for Karnataka Road Development Corporation

Limited under Spl Infrastructure Private Limited. If I am provided an opportunity to work under

your esteemed organization, I would prove to the best of my ability and to the entire satisfaction

of my superiors. Awaiting for a bright opportunity to upgrade my career.

Thanking You

ARUNGANDHI .N
OBJECTIVE:

To serve in the most challenging position with in an organization that provides Ample

opportunities with constant spirit, motivation, while also taking up interesting and innovative

tasks that places my career in the path of growth in the organization.

KEY BEHAVIOUR:

Experience in Civil execution in infrastructure sector and a team leader, coordinate with

my learn members where I have ability to do the job in a given time frame.

EDUCATIONAL QUALIFICATION:

Bachelor of Degree (Corres.)

[2016 – 2019]

 Mahabarathi Engineering College, Chinnasalem


 Anna University
 Civil Engineering (B.E)
 74%

[2014 – 2016]

 Sri Arumugam Polytechnic college, Tholudur


 Civil Engineering (DCE)
 65%

[2012 – 2014]

Higher secondary

 Government Higher Secondary School – Tittagudi


 70%
[2011 – 2012]

SSLC

 Government Higher Secondary School, Aduthurai


 69%

COMPUTER PROFICIENCY:

 MS Office (2007)
 Window Operating System
 Excel

PROFILE SUMMARY:

 Having good analytical and problem solving skill


 Having Experience in Execution in infra projects.
 Adjustability and adoptability to any environment
 Quantity survey, preparation of BBS
 Preparing, as built quantity statement
 Client coordination
 Effective site management
 Hard Working
 Man Power Management
 Contributing to the development and application of best practive process and procedures
for the project.

WORK EXPERIENCE:

Organization : Spl Infrastructure Pvt. Ltd., Chennai

Period of Worked : Dec. 2020 – Till Date

Post Held : Site Senior Engineer

Reporting Authority : Director, NHAI

Name of Project : i) Construction of vehicular under pass at ch (159+850)


Gingee Junction to 4 lane road section from Tindivanam

(121 + 000) to Ulundurpet (193+800) of NH 45

(new NH 38) in the state of Tamil Nadu.

ii) Construction of Terra Wall

Total Project Value : 45.00Cr.

Client : NHAI / UEPL

Project Highlights

i)Vup

Type : Double shell skew type

Size of Vup : 30 x 26.50 x 8.50 m

ii)Reinforced Earth Wall

Length of Terra Wall : 4 x 460 rmt

Supply of mould : M/s REIPL

Supply of Polimer
Strands Lifting
Anchor by : M/S REIPL

Facing Panel Thick : 180mm

Consultant : L.N. MALVIYA INFRA PROJECTS PVT. LTD

Design Consultant : RESOTECH CONSULTANCY SERVICES PVT LTD

Responsibilities :

1. Execution of VUP construction RE panel casting, construction of service road and


diversion road client dealing and coordination with PMC
2. Client Bill raising and get certification
3. Attending progress review meeting, specialized Agency (RE Panel erection)
arranging
4. Weekly progress metting with own site team, Quality management

Organization : Spl Infrastructure Pvt Ltd., Chennai


Period of Worked : Dec.2020 – Till Date
Post Held : SITE ENGINEER
Reporting Authority : Chief Project Manager, KRDCL Projects
Shimoga, Karnataka.
Name of Project : Construction of Bridge in Package widely spreaded at
different locations on state Highway / Major District Roads
in the state of Karnataka on Turn Key Basis based on
tenders own design under package III comprising of
Bridges in the district of Shimoga, Chikmagalur, Hasan and
Udupi.
Total Project Value : 230 Cr.

Subject handled
1. Execution of major Bridges, including fabrication of PSC I girder, Stressing operation
and launching.
2. Works in a timely fashion to meet Project budget
3. Communicate effective ely with client
4. Reviews of design works for GFC and Site construction plans
5. Supplier and Sub Contractors bid proposal determining
6. Prepare and distribute a time line for completion of the project within stipulated time
calculate the time frame for each segment of the project
7. Programme and Resource monitoring, quality control
8. Commitment to quality and continuous improvement through innovation
9. Client bill preparation and submission, client bill v/s sub contracts Bill comparision
10. Represent Projects at client Meetings and conference
11. Claim Settlement negotiation as built drawing Preparation
12. Progress Schedule and delay Claim analysis
13. DPR – Monitoring
14. Managing the production of approved Drawings and reports and preparation bridge
Specification
15. Labour mobilization from Various Places
16. Machineries Development
17. Cost Control and Monthly Material Requirements
18. Reconciliation for cement and steel for every Month.
19. Arraning specialized agency for girder launching and pile load test, pile integrity test.

Project Highlights
Name of the work : Construction of Bridge across Thunga river from Mahishi
To Yeddur in Thirthahalli Taluk, Shimoga District, Project
Value 23 Cr.
Client : KRDCL (Karnataka Road Development Corporation Ltd)
Consultant : Satra Consulting Service
Length of Bridge : 240mts
Type of Foundation : Open Foundation
Sub Structure : Pier 9nos and abutment 2 Nos
Height of Bridge : 10m to 8.5m
Super Structure : 50 Nos of Precast PSC 1 Girder
Length of Girder : 23.30m Length (1.60m Height) Each Girder
Cable Type : 12.7mm Strands
Erection of Girder : By Heavy Duty Crane
Type of Bearing : POT – PT FE Bearing
Deck slab : Cast in situ (200mm thick)
Completion As on date : 1. All foundation and sub structure are completed
2. 40 No. of Girders casting completed and 7 No of span
Erection completed, 5 Nos Span deck slab casted.
Name of the bridge : construction of Bridge across Malathi river from Chengaru
To Kammarudi in Koppa Taluk,
Chickmagalur District, Karnataka.
Client : KRDCL (Karnataka Road Development Corporation Ltd)
Consultant : Satra Consulting Service
Project Value : 15CR
Length of the Bridge : 120mts
Type of Foundatuon : Pile Foundation
(Pile dia 1.2m) and total 35 Nos
Sub Structure : 5 Nos supports (3 Piers and 2 abutmnet)
Height of Bridge : 9m to 10m
Super Structure : 5Nos Supports (3Piers and 2 Abutmnet)
Height of Bridge : 9m to 10m
Super Structure : 16 Nos of PSC I Girder (4 Nos per span)
Length of Girder : 29.300m Length (2.00m Height) Each Girder
Cable Type : 3 Nos (19+19+12 No of Strands)
Erection of Girder : By Crawler Heavy duty Crane (150 T & 1`00 capacity)
Status as on Date : All foundation and sub structure completed and Girder
Erection completed for the all span.
Name of work : Contruction of Bridge across Thunga river from
Gudunahallii to Baswani at thirtha Halli Taluk in Shimoga
District.
Project Value : 17 Crore
Length of the Bridge : 140mts
Type of Foundation : Pile cum Open foundation Pile dis 1.20mts (14 Nos)
Sub Structure : 16 Nos of PSC 1 Girder
Length of Girder : 34.30m Length (2.30m Height) 4 Nos Each span
Cable Type : 4 Nos (19+19+12+7) Strands
Erection of Girder : By Heavy Duty Crane
Type of Bearing : pot – pt fe Bearing
Deck Slab : Cast in situ (250mm thick)
1. All foundation completed and Sub structural 5 Nos
completed
2. 12 No. of Girders casted and 2 span Erection
completed.

S.No. Bridge Code Name of Bridge


1. N-BGM-CHI34 Krishna River between yediyur-kalola village Road at
44.70km
2 N-BGM RAY-35 Krishna River on Chinchali – Mulavada
3 N-BGM ATH 36 Krishna River on Jugula-Kidhrapura road
4 N-BGM CHI-37 Dhudganga River on Bhoja-karadaga Rendala road
5 N-BGM-GOK-39 GhataPrabha River on dupadala-Gokak Falls Road at 4.00
km
6 N-BGM-SAV-48 KM 4.00 ON Amaturu-Bevinakoppa-Sangoli road Across
Mala Prabha River
7 N-BGM-SAV-48 Savadhatti Hebala Cross Yellammaguda Hanchinala Road
Near Sri Renuka Yellama Temple at KM 5.70
8 N-BGM-RAY-50 Krishna River near Kudachi

Responsibilities:

1. Organising team members and tasks to deliver a project


2. Co-ordination with client and consultant
3. Proposed center line fixing
4. Developing Project resource estimate, Project Schedule and bridge Design tasks
5. Understand Client Priorities without compromising engineering excellence
6. Verify the design HFL and observed HFL with local authorities
7. Land acquisition for approach road of proposed Bridge on Both sides
8. Attend the meeting with design team regarding Hydraulic design and calculation for
proposed Bridges.
9. Preparation of compliances against consultant queries.
10. Justification of sub agency and deploying in suitable location
11. Attending High level Progress review meeting of KRDCL Bangalore
12. Deliver Design solution assement calculation lead teams and successfully manage the
project.

Organization : M/s Consolidated Construction consorlium ltd.,


Period of Worked : May 2016 – 2019
Post Held : SITE ENGINEER
Name of Project : Construction of Major Bridge at Shimoga dist in Karnataka
(Project Value: 38.41 Crore)
Project highlights : 549.2M High Level Bridge situated at Linganamakki Dam Back
Water, shimoga Dist., Karnataka
Type of Foundation : Pile Foundation (1.5m dia & Total 128 Nos Piles)02 Nos of
Abutment pile cap (13.25mx13.5mx2.25m) & 12 Nos of Pier Pile
cap (13.25mx5.7x2.25m)
Sub structure : 14 Nos. of Supports (02 Nos abutment & Oval
Shape Pier : (6.5m X 1.5m)
Height of Bridge : 11m to 21m
Super Structure : 52 Nos of Precast Girder (04 Nos Per Span)
Length of Girder : 40.8m Length (2.25m Height) Each Girder
Cable type : 6 Nos Main Cable + 01 No. Dummy Cable (19 Strands)
Erection of Girder : Launching Scheme by Launching Firder
Type of Bearing : POT-PTFE Bearing

Deck Slap : Cast in situ Deck slap to (300mm to 250mm Thick)

II. Another Name of Bridges : Major Bridge at Honali Project Cost: 27.03. Crore
Type of Foundation : Open foundation
No of Piers : 10 Nos
No of Abutment : 2 Nos
Span C/C : 35.50 mts
Bearing Type : POT-PTEF Bearing
Griders : PSC-I Girders (Each Span 4 Nos)
Deck Slap : Cast in situ Deck Slap (300mm to 200mm Thick)
III. Another Name of Bridge : Construction of Major across the Tungabhadra
River at Harihara
Cost of Project : 25.00 Crore
Type of Foundation : Pile cum open Foundation
No of Piers : 7+2 Nos
Span C/C : 42.5mts
No of Girders : 32 Nos
Type of Girders : PSC-I Griders
Erection of Griders : By Heavy Duty Crane
Deck Slap : Cast in site Deck slap (300mm to 200mm Thick)

IV. Rock anchoring Work : Vertical anchoring for stabilization of foundation


such as piers and Abutments with Pre-stressing.
Pull out Test conducted for confirming the
Anchoring (100 Ton Capacity) Sag removal.
Subject Handled : Project Controlling, Execution, analiyzing the
Monthly material requirement, client coordination,
Ensuring client bill submission, subcontractor,
coordination, conducting weekly progress meeting
with site team members, arranging specialized
Agency for girder pre stressing & LAUNCHING
WORK, Cost analyzing, labour mobailization,
attending client corordination meeting, progress
monitoring. Reviewing Monthly. Monthly MIS
Report.
Client : Karnataka Road Development Corporation Ltd.,
Consultant : Consulting Engineering Services (I) Pvt. Ltd.,
Jacobs (USA)
Reporting Authority : Regional Manager
CURRENT CTC : 6.00 LAKH PER ANNUM (INR)
Expected CTC : 07.20 Lakh per Annum (INR)
Time Required Joining : 01 month from date of order
Current Location : Bangalore
Preferred Location : Karnataka, Tamil Nadu
PERSONAL INFORMATION

Name : N. ARUNGANDHI

Father’s Name : Mr. N. NEHRU

Date of Birth : 02.06.1996

Nationality : Indian

Sex : Male

Languages Known : English, Tamil (Read, Write & Speak) Kannada & Hindi

Hobbies : listening to music & reading Newspaper

Mobile No : +91 9994835628

Marital Status : Unmarried

DECLARATION:

I hereby declare that the information provided above is correct to my knowledge and
belief.

Date : N. ARUNGANDHI
Place :

You might also like