Agile Meeting

The document outlines the different meetings that take place in an Agile process: 1. Grooming meetings happen before a sprint or anytime during to understand user stories from clients. Representatives from development, testing, product ownership, and design are involved. 2. Sprint planning meetings occur at the start of each sprint to assign user stories to developers and estimate story points. Developers, testers, designers, product owners, and scrum masters are involved. 3. Daily stand-up meetings happen every day of the sprint for updates on work completed the previous day, work planned for the current day, and any roadblocks from representatives of development, testing, and product ownership.

Uploaded by

Krishna Umbare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views5 pages

Agile Meeting

The document outlines the different meetings that take place in an Agile process: 1. Grooming meetings happen before a sprint or anytime during to understand user stories from clients. Representatives from development, testing, product ownership, and design are involved. 2. Sprint planning meetings occur at the start of each sprint to assign user stories to developers and estimate story points. Developers, testers, designers, product owners, and scrum masters are involved. 3. Daily stand-up meetings happen every day of the sprint for updates on work completed the previous day, work planned for the current day, and any roadblocks from representatives of development, testing, and product ownership.

Uploaded by

Krishna Umbare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Agile meeting/ Agile Ceremonies-

 In Agile meeting we have different meeting


1. Grooming meeting
2. Sprint planning meeting
3. Scrum meeting/ Daily stand meeting
4. Sprint review meeting
5. Retrospective meeting.

Meeting Purpose Duration/ Involved


1. Grooming meeting 1. User story/ Req.  To understand 30 min/ 1hr  PO, PM,
(Before the start of sprint Design, Dev Team,
or Any time) Testing Team,client
2. Sprint planning 1. Current sprint US add/ work decide – 30 min  PM, BA,
meeting BA, PM, Design Design, Dev Team,
(Start of sprint) 2. Estimation/ story point –Time for dev Testing Team
& testing
Ex. 1US = 16hr Dev + 8hr Test = 24 hr (3
days)
3. Scrum meeting/ Daily 1. What we have yesterday 15 min  PM, Design,
stand meeting 2. What we are doing today Dev Team, Testing
(Daily – every day) 3. Issue/ Rock block Team, BA (optional)
4. Sprint review meeting 1. Current sprint US Review/ Demo 30 min/ 1hr 
(Last day of sprint OR Demo will give by Tester (Client BA/Client, Designer,
start day of next sprint) Interaction) Dev team, Test Team,
PM
5. Sprint retrospective 1. Current sprint Good/ Bad things we 30 min  PM, Designer,
meeting done- dissuasion dev team, Testing team,
(Last day of sprint) 1st Sprint complete  2nd Sprint BA (optional)

Grooming Meeting:-

Sprint duration – 2 week

Sprint 1

- Sprint start date – 23 may 2022


- Sprint End date- 5 June 2022
Grooming Meeting:- (20 May 2022)

Duration – 1 to 2 hr

This meeting will happen before start of sprint or any time middle of sprint.

- Client – 20 US

Phn pay-- 5

Gpay-2

FB--3

Whatsup--10

Purpose of meeting:-
To understand US.

To discuss user stories which are coming from client ..or client will explain all requirement.

People involvement:-

Client involved.

1. Dev team and lead


2. Tester team and lead
3. Product owner.
4. Design.

2. Sprint planning meeting:-


Duration – 1 hr
23 May 2022

Purpose of meeting:-
- In this meeting we assign US to Dev team.
- Also we decide the Story point for each and every US.
-
-
- People involvement:-
- DEV team
- Tester Team
- Design
- Product owner
- Project manager / scrum master.

This meeting will happen once in every sprint.

Story point – is nothing but time required to complete US which given by DEV and Tester.
1 Story point== 8 hr

50 SP---sprint 1
Ticket -2===5
20SP-
50-23===27

15US===50SP
US pending====5

Planning poker – it is used for Story point decide.


DCTACH- 101
Dev = 16 hr
Tester – 8hr
Total = 24hr/8
SP= 3

SP=====DEV work+ tester work

SP – imp
1 , 2 , 3 , 5 , 8 ,13
Dctach-100-
We have to fetch data and upload data into prod data base.
Dctach 101-----We have to fetch data
2 SP
DCTACH-102---upload data into prod data base.
SP -3

DCTACH-102
Rohan – 2 sp
Jeevan- 3 sp
Gaurav- 5 sp
Akshay-2 sp
Pallavi- 2 sp

3. Daily stand-up meeting/ Scrum meeting:-


This meeting will happen daily till sprint end.
Duration – 15 min
People involved-
- Dev
- Tester
- Product owner.

Agenda meeting:-
- What we are done yesterday?
- What we will do today?
- What are the road blocks/issue while doing regular work.
-