0% found this document useful (0 votes)
107 views6 pages

ITP For Stringing

The document discusses a separation and compression centre project in Algeria for a company. It provides details on the contractor, project number, and includes a table for inspecting pipes with information like diameter, wall thickness, and heat number.

Uploaded by

rebbouche bilel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views6 pages

ITP For Stringing

The document discusses a separation and compression centre project in Algeria for a company. It provides details on the contractor, project number, and includes a table for inspecting pipes with information like diameter, wall thickness, and heat number.

Uploaded by

rebbouche bilel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

: EXECUTION OF A SEPERATION AND COMPRESSION CENTRE (CSC)

PROJECT
AT THE PERIPHERY SOUTH, HGA HASSI MESSAOUD, ALGERIA
COMPANY : SONATRACH

CONTRACTOR : DODSAL ENGINEERING & CONSTRUCTION PTE LTD

PROJECT NO : ENC 14 446Z

INSPECTION REPORT FOR PIPE Report No.


Reference Dwg. No. Rev.: Sheet No.
Location/Chainage From : To : Date :
Sl No. Pipe Dia Wall Thk Pipe No. Heat No. Length Remarks

Visual Inspection Result : ACCEPT / REJECT Total Length :


Remarks :

Completed By DODSAL CONST DODSAL QC SONATRACH


Name :
Sign :
Date :
Form no:646W-DOD-QA-FM -0284

You might also like