0% found this document useful (0 votes)
215 views4 pages

Waste Heat Boiler Painting ITP

This document is an inspection and test plan for blasting and painting of a waste heat boiler for ADGAS. It outlines the quality characteristics and acceptance criteria that will be verified at different stages of the work, including approval of painting procedures, testing of paint materials, surface preparation checks, and environmental conditions. Inspections will be performed by representatives from Global, Dolphin, the paint supplier Jotun, and a quality consultant. Records of test results and quality checks will be documented.

Uploaded by

Ubed Kudachi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
215 views4 pages

Waste Heat Boiler Painting ITP

This document is an inspection and test plan for blasting and painting of a waste heat boiler for ADGAS. It outlines the quality characteristics and acceptance criteria that will be verified at different stages of the work, including approval of painting procedures, testing of paint materials, surface preparation checks, and environmental conditions. Inspections will be performed by representatives from Global, Dolphin, the paint supplier Jotun, and a quality consultant. Records of test results and quality checks will be documented.

Uploaded by

Ubed Kudachi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

INSPECTION AND TEST PLAN

ADGAS
DOC: GBL/QC/2015/ITP-001/REV 01 Dtd.04/01/2017

CLIENT: ADGAS LEGEND

PAINTING CONTRACTOR : GLOBAL WI: 100% Witness, Inspection/ test, W2- Sample Witness
PAINT SUPPLIER : JOTUN PAINTS
S1- Random Inspection/ test, S- Servilance, R-Review
WORK DESCRIPTION : BLASTING PAINTING OF WASTE HEAT BOILER H- Hold

Remarks
ACTIVITY WORK ACTIVITY CONTROLLING QUALITY TEST ACCEPTANCE CRITERIA GLOBAL DOLPHIN PAINT COMPANY/ QUALITY
NO. DOCUMENT CHARETERISTICS FREQUENCY VALUE CODE / MNFCTR CONSULTANT RECORD
TO BE VERIFIED STANDARD DOCUMENT
NUMBER

Client's approval.
Client
Client specification
specification Lab Test
1 Approval of painting procedure SOP022 ISSUE 1 Garnet shall not be - - H H H H
SOP022 ISSUE Certificate attached
REV 12
1 REV 12
recycled.

Painting Procedure/ Painting


As per batch
2 Paint Material manufacturer data Product Name Per Batch Procedure data W1 W2 S1 S
Certificate
sheet sheets

Client specification Painting


2-a Testing /Test Paint (PQT) SOP022 ISSUE 1 Manufacturer Name - Jotun Procedure data W1 W2 S1 s
REV 12 sheets

Painting
Paint Data Sheet Batch No. Per Batch Jotun Procedure data W1 W2 S1 s
sheets

Client specification Free from oil,


Environmental Condition before start Surface
3 SOP022 ISSUE 1 Per Shift greas and loose ISO 8504-2 W1 W2 S1 s
blasting, Surface preparation Imperfections
REV 12 deposits

ISO
Medium 30-60
Surface Profile Per Shift 8503-2/ISO8500 W1 W2 S1 s
Mesh
-2

Surface Cleanliness Per Shift Sa 3 ISO 8501-1 W1 W2 S1 s


INSPECTION AND TEST PLAN

ADGAS
DOC: GBL/QC/2015/ITP-001/REV 01 Dtd.04/01/2017

CLIENT: ADGAS LEGEND

PAINTING CONTRACTOR : GLOBAL WI: 100% Witness, Inspection/ test, W2- Sample Witness
PAINT SUPPLIER : JOTUN PAINTS
S1- Random Inspection/ test, S- Servilance, R-Review
WORK DESCRIPTION : BLASTING PAINTING OF WASTE HEAT BOILER H- Hold

Remarks
ACTIVITY WORK ACTIVITY CONTROLLING QUALITY TEST ACCEPTANCE CRITERIA GLOBAL DOLPHIN PAINT COMPANY/ QUALITY
NO. DOCUMENT CHARETERISTICS FREQUENCY VALUE CODE / MNFCTR CONSULTANT RECORD
TO BE VERIFIED STANDARD DOCUMENT
NUMBER

Client
Chloride Test :
specification
Level less than Per Shift ISO 8502-2 W1 W2 S1 s
SOP022 ISSUE
2µg/cm²
1 REV 12

Client
Dust Level: Rating
specification
is 2 as per ISO Per Shift ISO 8502-3 W1 W2 S1 s Form attached
SOP022 ISSUE
8502-3
1 REV 12

Client
Before starting specification
Blotter Test ISO8502-3 W1 W2 S1 s Will be done at site
the work SOP022 ISSUE
1 REV 12

Client specification /
4 Painting Visual
standard

Client
specification
4.1 Environmental Condition Ambient Temp. Every two Hour > 4˚ C to 10˚C W1 W2 S1 S Quality Record
SOP022 ISSUE
1 REV 12

Client
>4 Deg.C above specification
Steel Temp. Every two Hour W1 W2 S1 S
dew point SOP022 ISSUE
1 REV 12

Client
specification
Relative Humidity Every two Hour RH<85% W1 W2 S1 S
SOP022 ISSUE
1 REV 12
INSPECTION AND TEST PLAN

ADGAS
DOC: GBL/QC/2015/ITP-001/REV 01 Dtd.04/01/2017

CLIENT: ADGAS LEGEND

PAINTING CONTRACTOR : GLOBAL WI: 100% Witness, Inspection/ test, W2- Sample Witness
PAINT SUPPLIER : JOTUN PAINTS
S1- Random Inspection/ test, S- Servilance, R-Review
WORK DESCRIPTION : BLASTING PAINTING OF WASTE HEAT BOILER H- Hold

Remarks
ACTIVITY WORK ACTIVITY CONTROLLING QUALITY TEST ACCEPTANCE CRITERIA GLOBAL DOLPHIN PAINT COMPANY/ QUALITY
NO. DOCUMENT CHARETERISTICS FREQUENCY VALUE CODE / MNFCTR CONSULTANT RECORD
TO BE VERIFIED STANDARD DOCUMENT
NUMBER

Client specification / As per paint Data ISO 2808


4.2 Wet paint film thickness 1st Coat Every application W1 W2 S1 S
standard Sheet method No.7B

As per paint Data


2nd Coat Every application - W1 W2 S1 S
Sheet

As per paint Data


Final Every application - W1 W2 S1 S
Sheet

Client Client
specification specification
Dew Point Every two Hour W1 W2 S1 S
SOP022 ISSUE SOP022 ISSUE
1 REV 12 1 REV 12

Uniformity of
colors, Client
Client specification / Appearance and smoothness, free specification
4.3 Cured paint film on pipe Every application W1 W2 S1 W2
standard continuity from runs, sags SOP022 ISSUE
holiday, 1 REV 12
blistering, flaking

As per paint MEK Test Not


Before applying Resistance rating ASTM D 4752-
4.4 MEK Test ( Primer Only) manufacturer Curing Time W1 W2 S1 S Required for
2nd coat more than 4 87
recommendation Jotatemp 650

Client specification /
4.5 Dry Film Thickness 1st Coat Every application 125-150 Microns SSPC-PA-2 W1 W2 S1 S
standard

Final Coat: Grey Every application 125-150 Microns SSPC-PA-2 W1 W2 S1 S


INSPECTION AND TEST PLAN

ADGAS
DOC: GBL/QC/2015/ITP-001/REV 01 Dtd.04/01/2017

CLIENT: ADGAS LEGEND

PAINTING CONTRACTOR : GLOBAL WI: 100% Witness, Inspection/ test, W2- Sample Witness
PAINT SUPPLIER : JOTUN PAINTS
S1- Random Inspection/ test, S- Servilance, R-Review
WORK DESCRIPTION : BLASTING PAINTING OF WASTE HEAT BOILER H- Hold

Remarks
ACTIVITY WORK ACTIVITY CONTROLLING QUALITY TEST ACCEPTANCE CRITERIA GLOBAL DOLPHIN PAINT COMPANY/ QUALITY
NO. DOCUMENT CHARETERISTICS FREQUENCY VALUE CODE / MNFCTR CONSULTANT RECORD
TO BE VERIFIED STANDARD DOCUMENT
NUMBER

Sample plat as
Rating is not less
Adhesion Test per ASTM D W1 W2 S1 S
than 3 A
3359

Client specification / All coated


4.6 Final DFT Final Coat: Grey 250-300 microns SSPC-PA-2 W1 W2 S1 W1
standard surface

Client
Client specification / specification
5 Repair Over lapping 25 mm W1 W2 S1 S
standard SOP022 ISSUE
1 REV 12

Attached: TDS Jotatemp 650 & Sample QC Report


QC format attached
Dust Level Test form attached