White Flint Sector
Montgomery County Planning
September
M-NCPPC
Vision: North Bethesda’s Urban C
Walkable
Urban
Green
Livable
Marketplace
White Flint T
Not Walkable
Especially MD 355
Not Urban
Transforming
Not Green
Surface parking lots
Few public amenities
Limited open space
Livable?
Marketplace
Regional and local sho
Plan Con
Walkable-Road network Urban-Density Green-Open Space
Livable-Residential Marketplace-Retail
Plan Con
Walkable: Multimodal
Urban: Density and street activating retail
Green: Variety of parks and open spaces
Livable: A place where people live
Marketplace: Local and regional
Existing Land
Primarily commercial uses
on large properties
Some mixed uses
Existing multi-family resid
(2200 units)
Multi-family under constr
(2200 units)
Public facilities
Major highways
1992 Master
Transit Station, Residential (TSR)
Maximum Density: 2.5 FAR
Transit Station, Mix (TSM)
Maximum Density: 2.4 FAR
Approved TSM development
Approved TSR development
Approved C-2 development
De
Highest density at the Metro Station
and along Rockville Pike
Transition to existing communities
White Flint Dis
Mid-Pike Plaza
Maple Avenue
Metro West
Metro East
NRC
White Flint Crossi
White Flint Mall
Nebel Corridor
Nicholson Court
Level of Develop
Amount of Development
Existing Pipeline August 2008 Totals
(Approved/ Recommendation
Under
Construction)
Dwelling Units 2,259 dus 2,220 dus 9, 800 dus * 14,279 dus
Residential
Square Feet 2.7M 2.6 M 11.7 M* 17 M
Non- 5.5M 1.79 M 5.69 M 12.9 M
Residential
Square Feet
*Average dwelling unit size is 1, 200 sq.ft
* Does not include MPDU bonus densities
Density Distrib
Allocation of density
Metro and transit l
Proposed road netw
Edges
Density and H
4 FAR at Metro Station-E
West
Height associated with d
and Rockville Pike
Based on measured dist
M from Rockville Pike R-O-
Density
Change in densities
Defined edges:
roadways
properties
FAR based on density principles
Transition to existing residential
communities
Transportation Net
Major Highways
Commercial Business Streets
Arterials
Pedestrian Priority Streets
Private Streets
Metro and MARC Stations
Bikeway Net
Bicycle and pedestrian prior
Regional trail connections
Integrated with street netw
Supported by on-site facilitie
Bike rental kiosks
Tr
Not just a White Flint concern
Services to Metrorail and MA
Feeders and circulators
Flexibility for:
- Public / private coordinatio
- Implementation and stagin
Sustainab
Plan for Sustainability
Mobility Compact mixed use
Open Space
M-NCPPC
Connec
Located between
Rock Creek
and Cabin John
Stream Valleys
Montrose Parkway
Bethesda Trolley Trail
Trails
Open Space Frame
Active urban park
Neighborhood open spaces
Civic Green
Recreation loop
Promenades
Urban Boulevard
Public R
Building Height, Step Backs
Civic Green
and Setbacks Urban park
Neighborhood greens
M Recreation Loop
M
East West Green Trail
M
M Promenades
Boulevard
Streets
Pedestrian priority str
Eddies
Public art
G
Design to avoid, reduce and sequester carbon emissions.
Green Buildings should emphasize:
Efficient energy
systems and
use of renewable
energy sources Bicycle storage
and
shower facilities
Green roofs,
green walls, and
water
Recycle m
conservation
from exis
building
deconstru
G
30% Tree Canopy Coverage
Native vegetation for community character
Clean air, reduce heat island, filter water
Provide pervious areas Use native plants and
promote biodiversity
G
No net loss of pervious land surface
Provide a connected multi-functional green space system that also ach
Transportation: At
Recreation: Active or
and safe walking a
Passive lanes
Environmental:
Stormwater infiltration Cultural: Public ar
Historic reference
Public Fac
Urban Parks and Open Spaces
Civic Green
Express/Urban Library
Police Sub-station
Farmer’s Market
Elementary School
Fire and Emergency Services
Balance of jobs and ho
1992 Plan Proposed
White Flint Existing Likely August
Built-Out Recommendation
Jobs 18,050 32,200 41,400
Housing 2,140 6,700 14,200
JH Balance 8.43 4.8 2.87
Implement
Design Guidelines
Staging
Financing
Design Guide
Design Excellence
• PROM
Great
Vision Guidance • CREAT
Chara
Limits Talent • CLARI
Expec
• PRESE
Flexib
O
• Streets, Spaces & Connections
• Architecture: Character, Massing, Signs
• Sun and Shade
• Parking
• Retail
• Stormwater Management
• Homeland Security
Design Guidelines
Overall - Streets, Spaces and Connec
Concept
Civic green
Urban park
Building Height, Step Backs Neighborhood
and Setbacks greens
Recreation Loop
East West Green
M
M
Trail
M
M Promenades
Boulevard
Streets
Pedestrian priority
streets
Eddies
Design Guidelines
Overall - Streets, Spaces and Connec
Public Use
30 stories
• Urban
• Public Enjoyment
• Access for Everyone
• Paved or Planted
• Private Development
Design Guidelines
Overall - Streets, Spaces and Connec
Public Use
• Every private development must provide “Public Use Spa
• Calculation for public use space is on the net lot area
Net
Gross
10% 20%
Standard Optiona
The Lot Dedication
Public Use Space
Design Guidelines
Overall: Streets, Spaces and Connec
Rockville Pike Bou
Existing
Proposed
Design Guidelines
Overall – R
Retail Activity Priority
Design Guidelines
Overall - Architecture: Character, Massing,
Height
Building Height, Step Backs
and Setbacks
Design Guidelines
Overall - Architecture: Character, Massing, S
Height Parts of a Buil
Typical per Story:
Retail: 14-20 feet Tower
Office: 12 feet
Residential: 9-10 feet
Design Guidelines
Overall - Architecture: Character, Massing,
Comparison of Heights
National Naval Medical Center Tower 264 fe
U.S. Capitol 289 fe
The Old Post Office Building 314 fe
The Washington Monument 555 fe
Design Guidelines
Overall - Architecture: Character, Massing,
Nuclear
Regulatory
Commission
240 Feet
Design Guidelines
Overall - Architecture: Character, Massing,
FAR and Massing
If the area of the whole property = 80,000 Sq.Ft.
Then ….
FAR 1 = 1 X 80,000 SF = 80,000 Sq.Ft.
FAR 2 = 2 X 80,000 SF = 160,000 Sq.Ft.
FAR 3 = 3 X 80,000 SF = 240,000 Sq.Ft.
FAR 4 = 4 X 80,000 SF = 320,000 Sq.Ft.
Design Guidelines
Overall - Architecture: Character, Massing, S
FAR and Massing
You can arrange the FAR many ways Tower
Steps
Cube
FAR 4 =
Design Guidelines Prepared by M-NCPPC Urban Design Division 9/5/08 Margar
District- Metro West: Conference Cente
Building Height, Step Building Height, Step
Backs and Setbacks Backs and Setbacks
M
M
M
M
Today Concept
Design Guidelines
District- Metro West:Conference Center
240’
Building Height, Step
Backs and Setbacks
M
M
M
M
Height Gateways and Landma
300’
250’
150’
Design Guidelines
Prepared by M-NCPPC Urban Design Division 9/5/08 Margar
District-Metro West:Conference Center
M M
M M
Green Retail and Eddies
Design Guidelines
District: Metro West- Conference Center
3 4 Intensity
Perviousn
Open Space
Undergro
Parking E
Street Parking Service A
Design Guidelines
District: Metro West- Conference Center
Assembly None Some All
Feasibility High Moderate Low
Civic Green Cost 1 acre 0.8 acres 1 acr
Purchased Dedicated Dedica
Civic Green Siting OK Better Better + O
Sidewalk continuity OK Better Best
Perviousness OK Better Best
Design Guidelines
District: Metro West- Conference Center
Summary
Civic Green & Eddies
Street Oriented Retail
No Assembly Scenario
Promenade
Draft
Pedestrian Priority Stree
Landmark @ Boulevard
Great Grid
Connected
Design Guidelines
Staging of Develop
Pre-Requisites for Stage 1
Approval of the Sector Plan and
Sectional Map Amendment (SMA)
Expansion of Metro Station Policy Area
Establishment of Bicycle Pedestrian Priority Area
Create a public-private partnership
Urban District
Development District
Business Improvement District
Parking Lot District
Special taxing district
Creation of Biennial Monitoring Program
Monitoring by Planning Board
Establishment of an advisory committee
Staging of Develop
Infrastructure and public facilities staging
Stage 1
West of the Metro Station
Stage 2
East of the Metro Station
Stage 3
Further away from the Metro Station
Staging of Develop
Stage 1
Metro West and Mid-Pike Districts
Level of Development
3,200 residential dwelling units
1.77 million sq.ft of non-residential
Requirements
Fund the realignment of Executive Blvd
and Old Georgetown Road
Fund the east-west Main Street
Establish a bus circulator system
Fund the acquisition/dedication/
building of Civic Green
TMD goal of 30% non-automotive drive share
Public-private partnership to redevelop Wall Park
Locate an express/urban library
Pre-planning for Rockville Boulevard with SHA
Staging of Develop
Stage 2
Metro East, Maple Avenue
and NRC Districts
Level of Development
2,600 residential dwelling units
1.6 million sq.ft of non-residential
Requirements
Increase non-automotive drive share to 35%
MCPS to evaluate the status of an
elementary school
Fund the second entrance
to the Metro Station
Staging of Develop
Stage 3
Nebel, Nicholson, White Flint Mall and
White Flint Crossing Districts
Level of Development
4,000 residential dwelling units
2.30 million sq.ft of non-residential
Requirements
Increase non-automotive drive share to 39%
Implement MARC station
Complete all streetscape improvements
Construct an elementary school, if needed
Reconstruction of Rockville Pike
Implement
Public-Private Partnerships
An Urban District
Silver Spring
Bethesda
Wheaton
Development District
Special Taxing District
Kingsview Village Center
West Germantown
Clarksburg Town Center
Tax Increment Financing
Intermission
Issue 1A:MARC Station Op
Issue 1B: Sc
High School-
Walter Johnson Hig
Middle Schools-
North Bethesda Mid
Tilden Middle
Elementary Schools
Ashburton
Farmland
Garrett Park
Kensington-Parkwo
Luxmanor
Wyngate
Issue 1B: Sc
Potential locations:
The Gables
White Flint Mall and Pl
Issue 1B: Sc
Roadway realignment
Acquisition of property
Limits potential public-private partnership
to redevelop Wall Park parking lot into a
future urban park
Issue 1B: Sc
White Flint Mall/Plaza
Needs public roadway access
Potential dedication
Issue 2: Land Use /Transportation Ba
Walkable blocks
New business streets
Hierarchy of forms
"Rungs" are keys
Second Metro entrance
Remove Nicholson interchang
Issue 2: Land Use /Transportation Ba
Land use /transportation
County Council practice
Management of expectatio
Opportunity to guide polic
Staff recommendations ar
- Aggressive
- Achievable
- Affordable
Issue 2: Land Use /Transportation Ba
Considerations
Local Area Transportation Review
Policy Area Mobility Review
Cordon line volumes – a leading
indicator
Issue 2: Land Use /Transportation Ba
Strategies
Percent driving to work Travel demand management
Acceptance of more congestion
Local network options
Regional connections
Land use alternatives
Issue 2: Land Use /Transportation Ba
Strategies
Travel demand man
Acceptance of more
Local network optio
Regional connection
Land use alternative
Issue 2: Land Use /Transportation Ba
Strategies
Travel demand management
Acceptance of more congestion
Local network options
Regional connections
Land use alternatives
Issue 2: Land Use /Transportation Ba
Strategies
Travel demand management
Acceptance of more congestion
Local network options
Regional connections
Land use alternatives
Issue 2: Land Use /Transportation Ba
Strategies
Travel demand manageme
Acceptance of more conge
Local network options
Regional connections
Land use alternatives
Issue 2: Land Use /Transportation Ba
Strategies
Travel demand manageme
Acceptance of more conge
Local network options
Regional connections
Land use alternatives
Issue 2: Land Use /Transportation Ba
Is more density possible?
Congestion assumptions prove conservative
TMX properties develop at less than full potential
Residential mix higher than assumed
Can more density be allocated through staging without need for mas
Plan amendment?
Issue 3: Land
Is .5 FAR appropriate standard method for TMX zone?
PHED Committee is reviewing TMX zone
.5 FAR appears to be the chosen standard method density
Issue 4:St
Infrastructure and public facilities staging
Stage 1
West of the Metro Station
Stage 2
East of the Metro Station
Stage 3
Further away from the Metro Station
Issue 5: St
Stage 1 is west of MD 355
Issue 6: Fina
Cost/Benefit Analysis
Transportation Costs
February estimate: $280M, including
• Public transit = $60M
•Montrose Parkway = $70M
• Rockville Pike = $70M
• Local streets = $80M (in addition to those already in
CIP, but including some that might be conditions of
development approval)
Many public dollars are:
• Already committed (e.g. state funding for Montrose),
• Proposed (e.g., Chapman Avenue), or
• From negotiable sources (e.g., MARC/WMATA)
Issue 6: Fina
Cost/Benefit Analysis
Total Property Tax Benefits (30 years)
Total Property Taxes (including General Fund): $871 M
Avg. Annual Amount Collected: $29 M
General Fund Property Taxes: $659 M
Avg. Annual Amount Collected: $22 M
Total Impact Taxes (30 years)
Commercial: $40 M
Residential: $23 M
Issue 6: Fina
Background
Conventional infrastructure finance and delivery
• Public sector debt finances infrastructure and builds it up
front
• Private sector provides infrastructure “one development
at a time”
• Impact taxes
…And a full spectrum of innovative alternatives
Issue 6: Fina
Background
The Problems
Lumpiness
Cost
Certainty
Issue 6: Fina
Cost/Benefit Analysis
Transportation Costs (cont’d)
February estimate: $280M, including
Public transit = $60M
Montrose Parkway = $70M
Rockville Pike = $70M
Local streets = $80M (in addition to those already in
CIP, but including some that might be conditions of
development approval)
Many public dollars are:
Already committed (e.g. state funding for Montrose),
Proposed (e.g., Chapman Avenue), or
From negotiable sources (e.g., MARC/WMATA)
Issue 6: Fina
Cost/Benefit Analysis
Total Property Tax Benefits (30 years)
Total Property Taxes (including General Fund): $871 M
Avg. Annual Amount Collected: $29 M
General Fund Property Taxes: $659 M
Avg. Annual Amount Collected: $22 M
Total Impact Taxes (30 years)
Commercial: $40 M
Residential: $23 M
Issue 6: Fina
Background
Conventional infrastructure finance and delivery
Public sector debt finances infrastructure and builds it up
front
Private sector provides infrastructure “one development
at a time”
Impact taxes
…And a full spectrum of innovative alternatives
Issue 6: Fina
Background
The Problems
Lumpiness
Cost
Certainty
Issue 6: Fina
Goal in selecting innovative alternative
Predictability for developers
Minimal additional public sector costs/risks
Where incidence of benefit is broad, incidence of cost
should also be broad
Solution
Create a district that can:
Deliver infrastructure projects on time (in phase) and in
their entirety
Spread the costs of Rockville Pike broadly over the Sector
Plan
Target public sector dollars for up-front mobility
Create monitoring system with broad
representation/accountability
Issue 6: Fina
Funding the District
Impact Taxes
Should be reduced or phased out
Should be captured
May be more appropriate for residential uses than a special
assessment
Special Assessment
Must be at level acceptable to existing uses
Must cover most of the cost of infrastructure
Other Possibilities
Some public money up-front
TIF-like financing, if necessary, for Pike
Issue 6: Fina
Next Steps
Engage sister agencies
Coordinate with property owners
Refine a preferred approach
Next
Another worksession with the Planning Board
or presentation of a completed draft plan
Advisory Committee comments
Set a public hearing date