APCO/PEWP/QAF/006
National Highways Authroty of India
: Four Laning of Munger to Mirzachauki (NH-80) Section from Rasulpur to Mirzachauki (Design
Chainage Km 157+350 to km 193+931) (Package 04) on Hybrid Annuity Mode in the state of Bihar
Under NH (O)
Client's Name : National Highways Authority of India
IE : SA Infrastructure Consultants Pvt Ltd
Concessionaire : APCO Vikramshila Expressway Pvt Ltd
EPC Contractor : APCO Infratech Pvt. Ltd.
FREE SWELLING INDEX OF SOIL
(As per IS: 2720 Part - 40)
Package No. : MMP-04 Date of sampling : 27.02.2022
Sample No : 08 Date of testing : 01.03.2022
Location of sampling : 185+200 RHS ( Katua Pahad ) Sampled by :
Source of material : Borrow Area No-01 Tested by :
Dry wt. of soil : 10 Gms.
Sl.
Determination 1 2 Avg. Value
No.
Volume of soil in water after 24 hrs of
1 10.00 12.00
submergence, Vd
2 Volume of soil in kerosene, Vk 10.00 10.00
3 Free swell index, {(Vd-Vk)/Vk*100} 0.00 20.00 10.00
Note : Free Swelling Index (FSI) not more than 50% for Embankment, Subgrade and Shoulder Construction as per MoRT&H
REMARKS :…………………………………………………………………………...…….…………………………...…………
………………………………………………………………………………………………………………………………………
EPC Contractor's Representative IE Representative
Doc. No. APCO/PEWP/QAF/003
National Highways Authroty of India
: Four Laning of Munger to Mirzachauki (NH-80) Section from Rasulpur to Mirzachauki (Design Chainage
Km 157+350 to km 193+931) (Package 04) on Hybrid Annuity Mode in the state of Bihar Under NH (O)
Client's Name : National Highways Authority of India
IE : SA Infrastructure Consultants Pvt Ltd
Concessionaire : APCO Vikramshila Expressway Pvt Ltd
EPC Contractor : APCO Infratech Pvt. Ltd.
GRAIN SIZE ANALYSIS OF SOIL
(As per IS : 2720 Parts-4)
Package No. : MMP-04 Date of sampling : 27.02.2022
Sample No : 08 Date of testing : 01.03.2022
Location of sampling : 185+200 RHS ( Katua Pahad ) Tested by : :
Source of Material : BA No. 01 Weight of sample (gm): 1000
IS Sieve Weigth Retained Cummulative wt. Cumulative
% of Passing Remark
(mm) (gm) Retained (gm) % Retained
19.00 0 0 0 100
Gravel
10.00 0 0 0 100
4.75 20 20.00 2.00 98.00
2.00 73 93.00 9.30 90.70 Sand
0.425 147 240.00 24.00 76.00
218 458.00 45.80 54.20 Silt & Caly
0.075
Gravel (%) : 2.00 Sand (%) : 43.80 Silt & Clay (%) : 54.20
Remark:…………………………………………………………………………………………………………………………...…
……………………………………………………………………………………………………………………………………………….
EPC Contractor's Representative IE Representative
Doc. No. APCO/PEWP/QAF/004
National Highways Authroty of India
: Four Laning of Munger to Mirzachauki (NH-80) Section from Rasulpur to Mirzachauki (Design Chainage
Km 157+350 to km 193+931) (Package 04) on Hybrid Annuity Mode in the state of Bihar Under NH (O)
Client's Name : National Highways Authority of India
IE : SA Infrastructure Consultants Pvt Ltd
Concessionaire : APCO Vikramshila Expressway Pvt Ltd
EPC Contractor : APCO Infratech Pvt. Ltd.
DETERMINATION OF ATTERBERG LIMIT
(As per IS :2720 part 5)
Package No. : MMP-04 Date of sampling : 27.02.2022
Sample No : 08 Date of testing : 01.03.2022
Location of sampling : : 185+200 RHS ( Katua Pahad ) Sampled by :
Source of material : : Borrow Area No- 01 Tested by :
Type of material : Soil
Sr. Liquid Limit (LL)
Description Unit Plastic Limit (PL)
No. 1 2 3 4
1 Penetration in mm/No. of blows mm/blows 16 18 24 28 1 2 Avg.
2 Container no. No. B-13 B-14 B-15 B-16 B-17 B-18
3 Weight of container+Wt. wet soil gm 68.85 71.47 61.49 57.12 38.85 40.29
4 Weight of container+Wt. dry soil gm 60.94 62.68 54.95 51.12 38.49 39.06
5 Wt. of empty container gm 33.01 32.77 33.80 32.48 36.57 32.58
6 Wt. of water, (3-4) gm 7.91 8.79 6.54 6.00 0.36 1.23
7 Wt. of dry soil, (4-5) gm 27.93 29.91 21.15 18.64 1.92 6.48
8 Moisture content, (6/7*100) % 28.31 29.37 30.92 32.16 18.64 19.02 18.83
LIQUID LIMIT GRAPH
20 20
40.00 23.31 37.16
35.00
Moisture Contents (%)
30.00
25.00
20.00
15.00
14 16 18 20 22 24 26 28 30
No. of Blows/ Penetration (mm)
Liquid Limit (LL) : 30.00 % Plastic Limit (PL) : 18.83 % Plasticity Index (PI) : 11.17
Acceptance Criteria as per MoRT&H
LL ≤ 50% PI ≤ 25% For Emb. & Sub.
LL ≤ 25% PI ≤ 06% For GSB
EPC Contractor's Representative IE Representative
Four Laning of Munger to Mirzachauki (NH-80)-Start From Kharia Village Junction to the Exisiting
Bhagalpur Bypass (PKG-2-CH: KM 95+580 to KM 125+000) on Hybrid Annuity Mode in the State of
Bihar
Contractor:- Apco Infratech Concessnaire:- Apco Magadh Client:
Lea Associates South Asia Pvt. Ltd. National Highway Authority of India
Pvt. Ltd. Expressway Pvt. Ltd.
(NHAI)
Sample No. :- Date of Sampling :-
Location of Sampling :- Sampled By :-
Source of Material :- Date of Testing :-
Tested By :-
PROCTOR'S COMPACTION TEST
TEST METHOD : IS 2720 (PART 8)
Dry Density Determination
Sr No. Determination Unit 1 2 3 4 5 6
Mould No. 1 1 1 1 1
1 % of Water added % 4 6 8 10 12 14
2 Weight of mould gm 4323 4323 4323 4323 4323 4323
3 Wt. of mould+Wt. of compacted soil gm 6022 6157 6326 6357 6224 6212
4 Wt. of compacted soil (2-1) gm 1699 1834 2003 2034 1901 1889
5 Volume of mould cc 1000 1000 1000 1000 1000 1000
6 Wet density gm/cc 1.699 1.834 2.003 2.034 1.901 1.889
Moisture Contents Determination
7 Container No. B-19 B-20 A-21 B-22 B-23 B-24
8 Wt. of container+Wt. of wet soil gm 81.68 92.47 76.95 69.14 75.16
9 Wt. of container+Wt. of dry soil gm 77.35 86.72 71.81 63.65 68.45
10 Wt. of empty container gm 27.73 28.71 28.00 24.05 27.38
11 Wt. of water (7-8) gm 4.33 5.75 5.14 5.49 6.71
12 Wt. of dry soil (8-9) gm 49.62 58.01 43.81 39.60 41.07
13 Moisture content (10/11*100) % 8.73 9.92 11.73 13.87 16.34
14 Dry Density [5/{1+(12/100)}] gm/cc 1.563 1.668 1.793 1.786 1.634
Dry Density (gm/cc)
1.850
1.800
1.750
1.700
1.650
1.600
1.550
1.500
1.450
1.400
5.00 7.00 9.00 11.00 13.00 15.00 17.00
Moisture Content (%)
Maximum dry density : 1.885 gm/cc Optimum moisture content : 12.60 %
EPC Contractor's Representative IE Representative