100% found this document useful (1 vote)
348 views6 pages

WPS Pi 037 SDSS Gtaw

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
348 views6 pages

WPS Pi 037 SDSS Gtaw

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 6
EPC FOR RUMANTHA / SHANAYEL FAGILITIES - PHASE It DEVELOPSERT ee PROJECT NO. P44010 me CONTRACT NO. 19676.01 f PEC 10884 ADCO PROJECT DOCUMENT REVIEW * AOeO Transmittal Ro, AIC 5878, 01-60-2938 [pate | 1210607 “contractor Transmit We. i CiASO-2754 Date | 08-Feb-17 “ronsmted Doe “wate gaze Seetaton es) Addressed To: | Construction Director ~ Gopy Ter [6 Document Contote - i 1/1 9) Dos. Approved ° 4. Dos, for ADCO Approwst ry ‘by Dee. ‘With Comments, tobe rested VG Rejected 9} To be resubmitted 2. Boe. for ADCO Comments — |») CONTRACTOR fo Proceed fneorporating ADCO's Comments “oot scctomioe © |9epa coment See ARCO DOCUMENT TRANSMITTAL ~ Wo, of Pages RS | Commented Document Ko. | Rev. ' ~ ps0 Decument Title (PIPING WELDIM ‘Approved by Name; Kamal Abu Kiaip Position: Construction Ma ‘Signature : Date KG ‘ame _: Abdel Raouf El Gh ion ‘Sr, QC - Engineer Signature: Date ~ r Name Position > ‘Signature: il \ Date vel Page WL oS ro (5-63)) dagaaall A yyll A algsisll Cl daell la g sl asc ‘Abu Dhabi Company for Onshore Petroleum Operations Ltd. (ADCO) EPC FOR RUMAITHA / SHANAYEL FACILITIES - PHASE III ADCO Contract No.: 15678.01 / EC 10884 ADCO Project No.: P44010 WELDING PROCEDURE SPECIFICATION (WPS) FOR PIPING WELDING (SDSS) i WPS Doc# 30.99.12.1727 Rev 1 ‘ wear a |M - 1 | 902.2097 MAN! Isy SUNDARESAN | ISSUED FOR CONSTRUCTION| 8 | 1022097 MANI Isy SUNDARESAN | FOR REVIEW /APPROVAL a | 15.09.2016 MANI 1sY SUNDARESAN | FOR REVIEW/ COMMENT REV] DATE ORIGINATOR REVIEWED ‘APPROVED DESCRIPTION ‘CONTRACTOR: THE CONSORTIUM OF GSE&C asl 30.99.12.1727 PAGE 10F5 ADCO DOCUMENT No. ORIGINATOR No.: ADCO Project No. Rev. | Date 2017 WPS-PI-037 44010 FM-P44010-0A-PL-001 Rev 1 Table of Contents Title Sub-Tite Page No Cover Sheet 1 ofS Table of Contents 2015 Welding Procedure Specification (WPS) 3015105015 ‘ATTACHMENTS: Wes WITH ADCO COMMENT PWPS WITH ADCO COMMENT WELDING PROCEDURE QUALIFICATION RECORD [AS RUN WELD PARAMETER RECORDING SHEET NDT REPORTS La RePoRTS MATERIAL / ELECTRODE TEST CERTIFICATES ‘CALIBRATION CERTIFICATES eZ Ve loocumenr Tre ‘ADCO DOC No: | |WELDING PROCEDURE SPECIFICATION (WPS) FOR 30.99.12.1727 @ PIPING WELDING(SDSS) - (WPS Doct 90.99.12.1727 Rev B) paaela are Stns stdowiemennqronnn [ORIGINATOR No: ‘ADCO Project No: Paaoto | Rev:1 | Date: 9.02.2017 lwes-P1.037 F¥APA4010-04PL.01 Rev + EPC FOR RUMAITHA/sHaNaveL Facumes-pHasem | GS ESC ADCO Contract NO; 15678.01 / EC 10884 bed ADCO Project No: P44010 Doss (QW-482) WELDING PROCEDURE SPECIFICATION (WPS) (ASME IX, ASME B 31.3, DEP 30.10.60.18) |Weiding Procedure Speciication No. 30.99.12.1727 (WPS POST) Date. 902.2017 Revision No: _4 ‘Supporting POR Nos(6): 30,99.12.1727 (POR-P-057) Welding Process(es): GTAW Types) ‘Manual IMOMT: 0 ‘tomate, Manus Machine or SerrAtoy JOINTS [QW-402] [Joint Details Joint Design SINGLE ‘V" Backing with out (asus [Backing Material (Type): NONE — a Tr Metal T Nentusing Metal ‘retary 5 IT Nonmetatic one, Joint Preparation: ASE METALS [QW-403] P No. 10H Group No.: 1 to P No, 40H Group No, 4 [Specification Type and Grade: ‘$A790-$32760, A790- §32750,A815-$32750,A182-F55,A182-F53 or equivalent OR [Chem Analysis & Mech.Prop. to TTT | IChem.Analysis & Mech.Prop.: Base Metal Thickness Range: Groove: 41.5 to 6.54 mm Fillet ALL Pipe Dia Range: Groove AL Fillet ALL IMax Pass Thickness (s 13mm): NA JOther: Service Class(es): Applicable for Piping line classes 013816-X(SDSS FILLER METALS [QW-404] dec.No. (SFA) AWS No. (Class) ER 2606 F-No. 6 [A-No. 8 [Size of Filler Metals: 2072.4 mmo Groove: 5.54 Thickness Weld Metal -SPtS ase Filler Metal Product form: Solid Electrode Fiux (Class): NA, Flux Trade Name: NA, [Consumable Insert NONE [Brand Name: Bohler CN26/9 CuT1G aco conan rsat Ee oe GSE&C ‘ADCO Project No: P44010 =) |Dessal (QW-482) WELDING PROCEDURE SPECIFICATION (WPS) (ASME IX, ASME B 31.3, DEP 30.10.60.18) PWPSt 30.99.12.1727 (WPS-PI-037 Rev 1) PQR# 30.99.12.1727 (PQR-PI-037)] POSITIONS [QW-405] POST WELD HEAT TREATMENT [QW-407] Position(s) of Groove: ALL [Temperature Range: NA |Weiding Progression: Up Hil! Position(s) of Fillet ALL [Time Range: NA PREHEAT [QW-408] GAS [QW-408] Preheat Temperature (Min) “Ambient % Composition Interpass Temperature (Max): 144 Gas(es)_| (Mixture) _| Flow Rate (LPM) |Preheat Maintenance: NONE: Shielding: “Argons2.aN2| 98.8 8-10 (Centinuous Special Heating where applicable tobe recorded) Backing ‘Argon 99.99 10-20 wen ambient temp is below 10°C, re Heat shall bo upto 50°C. Trailing NONE | NONE: NONE Base Matera shal be heated warm-oshandif any mois presants. ELECTRICAL CHARACTERISTICS [QW-409] Current (A.C. or D.C.) Polarity GTAW:EN JAmperes (Range) Votts (Range): (GTAW: 9.6 - 14.0 Heat Input: . [Tungsten Electrode (Size & Type): 2ammB/ EW Th? IMode of Metal Transfer for GMAW: NA Electrode Wire Feed Speed Range: NA NA TECHNIQUE [ QW-410] string or Weave Bead: Sting (Root Pass) & Weave (Other Passes & Weave Wisth not exceed 3 times the dia of filer) lorifice or Gas Cup Size: mm Initial and Interpass Cleaning (Brushing, Grinding, etc) Grinding / Brushing [Method of Back-grinding None lOscilation: None IContact Tube to Work Distance: NA IMuttie or Single Pass (Per Side): Multi Pass IMuttiple or Single Electrodes: Single. sed or Out Chanber None Peening Not allowed Thermal Process of Edge Prep / Back Gouge: NA Page 4 ore ‘ADCO Contract NO; 18678.01 / EC 10884 ‘ADCO Project No: P44010 EPC FOR RUMAITHA | SHANAYEL FACILITIES-PHASE Ill GS E &C Dos: (QW-482) WELDING PROCEDURE SPECIFICATION (WPS) (ASME IX, ASME B 31.3, DEP 30.10.60.18) |WPS# 30.99.12.1727 (WPS-PI-037 Rev 1) | PQR# 30.99.12.1727 (PQR-PI-037)| WELDING PARAMETER TABLE [QW-409] Notes: ‘ne above mentioned weld passes may vary depending on the actual thickness of the joint. J2. GTAW equipment shall be fitted with @ High Frequency starting unit and a crater eliminating slope out control. 3. Tack welding parameters: Same as per root pass. 4. Bridge / Bar materials: Same as per Base metal. Tacking Inside the groove is not allowed. |S. Welds shall not be allowed to cool down until atleast half the wall thickness has been welded 6. Welding shell not be carried out when the degree of protection does not permit satisfactory workmanship, 7. Stray arc shall be avoided. Are Strikes if any shall be ground smooth and grounded area shall be PT tested. 6. The edges and surtaces of parts to be joined shall be prepared by maching or grinding using aluminium oxide grinding discs ‘The cleaned surface shall be extended as least 25mm beyond the weld area 19. Where ever possible, baffles or dams of proper design should be used to conserve the backing gas and to provide effective protection of the weld root. The purge dam should be typically located about 3"on both sides of the welds. 11 backing gas inlet on the dam should be located near the bottom of the pipe &the outlet should be located near the top of the pipe for effective gas backing. H2. Welding shall not be carried out when the degree of protection does not permit satisfactory workmanship. /13.Only SS wire brush and aluminium oxide discs shall be used, PREPARED BY. REVIEWED BY ‘APPROVED BY ‘COMPANY | Sia hs FWiP44010-QA-PI-001 Rev.1 Page 5 ofS

You might also like