SOP - Portable Gas Chromatography
SOP - Portable Gas Chromatography
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 0 of 19
1.0 Purpose
This document outlines the procedures for the operation of a Portable Gas Chromatograph (GC)
for in the field gas measurement. The portable gas chromatograph separates and measures the
individual gas components in a natural gas mixture. The following properties can be determined
from this measurement:
Composition
Specific gravity
Heating value
Hydrocarbon liquids, gallons per 1,000 cubic feet of gas (GPM)
Liquid petroleum gases (LPG), gallons per 1,000 cubic feet of gas (propane and butane)
Compressibility
This Standard Operating Procedure (SOP) requires the use of a historical verification software
program for validating sample results to ensure an accurate and representative sample was
collected before the analyst leaves the location.
Page 1
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 2 of 18
1. Ensure Helium carrier gas is of adequate pressure for model of gas chromatograph and the
regulator is functioning properly. (No lower than 200 psig cylinder pressure). (Refer to
Section 3.0 Attaching the Helium Carrier Gas).
2. Purge the sample hose with sample gas, standard gas, or UHP Helium prior to analyzing the
first samples of the day and prior to analyzing the first sample at each location (between 16
and 20 psig for a minimum of 2 minutes). A multi-port valve at the sample / calibration gas
inlets of the chromatograph will allow for purging the sample line without detaching it from
the instrument, thus reducing the potential for ambient infiltration.
3. Ensure the sampling system is heated to a minimum of 30º F above hydrocarbon dewpoint of
the gas being sampled.
4. Keep a cap or plug on the sampling end of the heated line and the filter/regulator assembly
when they are not in use to ensure foreign objects do not enter the system.
5. Do not lie anything on top of the heated hose while being stored. Keep it loose, coiled, and
free from chafing. Do not kink the hose which will break the heat tape and pinch the sample
tubing within.
6. Discard the first run of the day.
7. Check the un-normalized totals (should be between 97.0% and 103.0%) and verify the
heating value, specific gravity, and individual mole% concentrations with historical data
prior to accepting and processing any and all analyses into the measurement accounting
system and/or entering values into the meter (refer to Section 6.0 In the Field Sample
Analysis).
8. When analyzing high H2S wells, it is recommended that the sample system be purged with
UHP Helium in-between locations (this will help clear the system of H2S contamination).
Page 2
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 3 of 18
1. Perform validation / calibration procedures, ensure the all required documentation is saved
and maintained in accordance with company’s best practices (refer to Section 7.0 Calibration
and Validation).
2. Monitor the calibration gas pressure and temperature.
a. All calibration gases shall be maintained in accordance with GPA 2198.
b. The temperature of each cylinder should be maintained at a minimum of 30º F above
hydrocarbon dewpoint.
i. Each cylinder should be heated for a minimum of 24 hours prior to use.
3. Check for leaks in the entire system (do not use leak detection liquids on the Helium fitting
on the the back of the GC).
4. Ensure integrity of the heated hose (inspect for cuts, cold spots, kinks, etc.). Replace as
necessary.
1. Verify the cleanliness of the sampling system by flowing UHP Helium through the entire
sampling system and analyzing it on the chromatograph, clean as necessary (refer to Section
9.0 Sampling System Validation).
a. More frequent cleaning of the sampling system may be required depending on the
locations sampled. Monitor the types of field gas sampled throughout the month and
increase cleaning frequency as necessary.
1. Update historical sample verification database from the Measurement Validation and
Accounting system.
a. More frequent updates may be required, depending on the variability of the samples
being analyzed.
Page 3
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 4 of 18
1. Verify the carrier gas being used is Ultra High Purity (UHP) Helium. UHP is defined as
99.999% pure.
2. Ensure any regulators and tubing being used for carrier gas are clean and dedicated. Never use
regulators or tubing that has been used for any other purpose.
a. A 2um in-line filter should be installed between the chromatograph and carrier gas tubing
to ensure no particulate enters the instrument. Contaminants and/or particulate in the carrier
gas can cause chromatographic issues and potentially damage the instrument.
b. A moisture trap can also be installed between the chromatograph and carrier gas tubing to
ensure no moisture enters the instrument. Moisture vapor in the carrier gas can cause
chromatographic issues and potentially degrade the columns.
3. Check the Helium carrier gas bottle for proper operating pressures. The cylinder pressure
should be above a minimum of 200 psig.
4. Prior to attaching the carrier gas tubing to the chromatograph, the regulator and tubing should
be purged. With the tubing disconnected from the instrument, open the Helium cylinder and
increase (clockwise) the pressure to approximately 5 psig. Allow the Helium to bleed into the
atmosphere for approximately 60 seconds.
5. With the Helium still flowing at approximately 5 psig, connect the carrier gas tubing to the
inlet port of the instrument. Tighten the fitting but do not use a liquid leak detector to test for
leaks on the GC.
6. Very slowly increase (clockwise) the regulator pressure setting from 5 psig to the manufacturer
recommended setting. This process should take an average of 1-2 minutes to perform. Check
the regulated pressure setting daily. As it bounces down the road in the vehicle, the setting
can change.
a. Each Helium carrier gas cylinder regulator shall be designed for the proper pressure range.
UHP Helium cylinders typically have 2200 to 2600 psig when new. Portable gas
chromatographs typically require between 55 and 95 psig. The delivery side of the
regulator should have a max setting of no more than 300 psig. Regulators with higher
settings are not as accurate at 95 psig and below. Delivering too much pressure can
severely damage the instrument.
7. In order to avoid the build up of potentially hazardous Helium concentrations within the cab
of the vehicle, the carrier gas cylinder valve should be closed when the GC is to remain unused
for an extended period of time, such as nights and weekends.
8. Validation of Helium carrier gas is to be performed prior to new cylinder attachment to the
GC.
Page 4
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 5 of 18
a. Verify that there are no gas components trapped within the GC prior to the verification
process by running the Ultra High Purity Helium validation gas through the GC several
times to establish a base line.
b. Use a piece of clean or new nylon 11 tubing with clean or new fittings and a clean regulator
for connection between the GC and cylinder, not the heated sample line and/or
filter/regulator assembly.
c. Purge the tubing and regulator to clear the system of Oxygen and Nitrogen (thoroughly
purge the regulator several times), prior to attaching them to the instrument.
d. Regulate the Helium gas inlet pressure to the GC between per manufacturer specifications.
e. Perform several analyses until it is verified that the GC has no residual components (refer
to Section 9.0 Sampling System Validation). Un-normalized concentrations for each
component should be non-detectable.
f. Once the GC is verified to be free of residual components, connect the new Helium carrier
gas cylinder.
g. Purge the tubing and regulator to clear the system of Oxygen and Nitrogen (thoroughly
purge the regulator several times), prior to attaching them to the inlet of the instrument.
h. Regulate the Helium gas inlet to the GC between per manufacturer recommendations.
i. Perform 3 analyses. Un-normalized concentrations for each component should be non-
detectable.
j. Another GC may be used for confirmation purposes, running the same test and using the
same parameters as listed above
9. If the new cylinder is not within the specified limits, notify the vendor for replacement.
10. If the carrier gas passes, it may be placed in service using the connection procedures at the
beginning of this section, Steps 1-7.
a. Do not use leak detection liquids on the Helium carrier gas system.
4.0 Start-Up
1. Ensure the verified UHP Helium carrier gas is attached and on. Carrier gas should always be
turned on prior starting the instrument (refer to Section 3.0 Attaching the Helium Carrier Gas).
a. Carrier gas should always be the first thing on and the last thing off.
2. Ensure the appropriate communication cable is plugged into both the chromatograph and
computer.
3. Turn the gas chromatograph power on.
4. Turn on the heated sampling system.
5. Power up the computer (computer can be powered up prior to powering up the chromatograph).
6. Launch the GC operation software.
7. Launch the historical verification software.
8. Download/initiate the appropriate analytical method as necessary.
9. Allow the gas chromatograph to stabilize for approximately 45 minutes prior to first analysis.
10. It is recommended that the first analysis of the day be discarded.
Page 5
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 6 of 18
5.0 Shut-Down
1. When finished for the day, the power switch of the chromatograph can simply be turned off
and software can be closed.
2. If the chromatograph is enclosed in a vehicle, the carrier gas should be turned off to reduce the
potential for hazardous level build up.
1. Vent the location sample point to ensure there are no standing liquids built up in the probe or
valve.
2. Once the sampling point is free and clear of liquids, attach the filter/regulator assembly.
a. The following picture is an example filter/regulator assembly.
b. The assembly should be heated and/or insulated in a manner which ensures it is
maintained at least 30º F above hydrocarbon dewpoint of the gas stream being analyzed.
i. Heat should be maintained on the system when traveling between sampling locations.
c. The filter/regulator assembly should be stored in a location which minimizes the
opportunity for damage.
3. Set the regulator to deliver the sample gas to the gas chromatograph at the same pressure at
which it was calibrated (refer to Section 7.0 Calibration and Verification).
4. Attach the heated line to the filter/regulator assembly.
a. Ensure the entire sampling system has reached at least 30º F hydrocarbon dewpoint prior
to sampling.
b. When possible, suspend the heated line to keep it off the ground (the cold ground pull
heat from the line rapidly).
5. Turn the sample valve at the chromatograph to the vent position. Vent sample gas through the
sampling system for a sufficient period of time to ensure a representative sample prior to
starting analysis.
6. Turn the sample valve at the chromatograph to the sample inlet position.
7. Start the injection and analytical process on the gas chromatograph.
a. When prompted, enter the appropriate identification into the system for sample tracking.
b. Enter all other relevant information as necessary and available. This may include, but is
not limited to, the following:
i. Meter Number
ii. Meter Name
iii. Description
iv. Flowing Temperature
v. Flowing Pressure
8. If this was the first run of the day, discard and return to Step 7.
9. Upon completion of the analysis, the historical verification software data entry page will
prompt the entry of additional information.
a. Ensure the location identification number transferred correctly into the ‘Sample Name’
field.
i. The location identification number will need to be identical to that used in the
historical database to accurately compare the data.
b. Enter all relevant data. This may include, but is not limited to, the following:
i. Meter Name
ii. Sample Date
iii. Laboratory
iv. Atmospheric Pressure
v. Analyzer Type
vi. Analyzer Make and Model
vii. Last Verification/Calibration Date
viii. Sampling Flow Rate
ix. Ambient Temperature
x. Sampling System Heat Tracing
xi. Type of Sample (Spot or Composite)
xii. Sampling Method
xiii. Company Collecting Sample
xiv. Hexanes Plus Split Ratio (if applicable)
xv. Water Vapor Concentration (lbs/MMscf)
xvi. Injection Date
xvii. Report Date
Page 7
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 8 of 18
b. If all results fall within the acceptance parameters, they can be accepted and processed
into the Measurement Accounting and Validation System.
i. The following is an example verification window with failing results.
Page 8
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 9 of 18
a. If any results which fall outside the preset acceptance parameters, the following Steps
should be followed:
i. Individual parameter failures, with the exception of un-normalized totals, do not
automatically indicate a bad sample. Failures indicate a potential issue and further
evaluation and investigation should be performed to verify if the sample is good or
bad.
(1) If sample has high Nitrogen, turn the sample valve at the chromatograph to vent
and vent sample gas through the sampling system again. Return to Step 6.
(a) If Nitrogen concentrations do not decrease to expected levels, inspect the
sampling system for leaks. Repair or replace as necessary.
(2) If C6+ concentrations are high, it may be an indication of a contaminated
sampling system.
(a) Re-analyze the sample to verify concentration. Return to Step 6.
(i) If C6+ concentrations remain higher than the acceptance limits, and it is
due to contamination in the sampling system, clean the sampling system
prior to performing any further analyses (Refer to Section 9.0 Sampling
System Validation).
ii. If the un-normalized totals are outside of the 97.0% to 103.0% acceptance window,
return to Step 9.
Page 9
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 10 of 18
(1) If after several analyses the un-normalized totals remain outside of the acceptance
window, re-calibrate the instrument before proceeding (refer to Section 7.0
Calibration and Validation).
(2) Note that ambient pressure and altitude can also affect un-normalized totals.
iii. If individual component concentrations, heating value, and/or specific gravity values
do not fall within the preset acceptance criteria, return Step 6.
(1) If the results do not come within the preset acceptance criteria on the secondary
analysis, determine if there are circumstances which would make that sample
from that location different from past analyses. Such circumstances may include,
but are not limited to, the following:
(a) Difference in ambient temperatures between current and past analyses.
(b) Well has not had flow in quite some time prior to analysis.
(i) Remember; never analyze a well that is not flowing.
(c) Multiple wells flow into the stream being tested and each turns on and off at
various times.
Note - There are many other circumstances which may lead to differences from
past analyses.
(2) If there are circumstances which explain the failure, enter any explanation into the
comments field and accept the results.
(a) It is very important to enter the explanations for any failures into the
comments field because that information accompanies the data into the
Measurement Accounting and Validation System and can be used for further
validating and auditing. In addition, it will reduce the need for editors to
contact technicians for confirmation.
iv. Most Historical Data Verification Software Systems require a minimum of 3 samples
in the historical database to validate analyses. If there are less than 3 samples in the
historical database, each individual result, with the exception of un-normalized totals,
will be highlighted red.
(1) The following is an example verification window with failing results due to
insufficient sample history.
Page 10
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 11 of 18
(2) If the un-normalized totals are within the 97.0% to 103.0% acceptance criteria, enter “Not
Enough History” into the comments field and accept the results.
Validation, and if necessary calibration, of the portable GC shall be done on a weekly basis,
unless no samples are to be analyzed during a given week.
The calibration and validation procedures within this document utilize the GPA 2261-13
acceptance criteria for repeatability and reproducibility (see Table 1). Acceptance can be
determined through the use of spreadsheets or though built-in comparisons within the historical
verification software system.
Page 11
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 12 of 18
Individual compound concentrations for the samples analyzed by a given gas chromatograph
should be within ±50% of the certified standard concentrations used for calibration of that GC.
If individual compound concentrations for the samples analyzed by a given gas chromatograph
exceed ±50%, a multi-point calibration or multiple single-point calibrations shall be performed.
Refer to manufacturer specification for multi-point calibrations.
1. The UHP carrier gas cylinder should be above a minimum of 200 psig pressure. Verify the
carrier gas delivery pressure is set per manufacturer recommendations (refer to Section 3.0
Attaching the Helium Carrier Gas).
2. Ensure the calibration gas cylinder is above a minimum of 20 psig, or roughly 10% of the
initial pressure of the cylinder at delivery to the asset.
a. If not, a new cylinder should be used. Ensure it has been heated for a minimum of 24
hours prior to use and has been verified per GPA 2198 (refer to Section 8.0 Calibration
Gas Standard Specifications).
3. Attach the filter/regulator assembly to the regulator of the calibration standard.
a. Set the regulator to deliver the calibration sample at the manufacturer recommended
pressure.
4. Attach the heated sample line to the filter/regulator assembly.
a. Ensure the entire system is at least 30º F above hydrocarbon dewpoint prior to
performing any analyses.
b. Suspend the heated line to keep it off the ground (the cold ground will pull heat from the
line rapidly).
Page 12
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 13 of 18
Note: The As-Found validation procedures assume that an initial calibration has already been
performed. If it has not, skip the As-Found verification and proceed to section 7.3 Calibration.
1. Turn the sample valve at the chromatograph to vent. Vent calibration gas through the
sampling system for sufficient time to ensure a representative sample is delivered to the gas
chromatograph.
2. Turn the sample valve at the chromatograph to the sample inlet.
3. Analyze the calibration standard in duplicate.
4. Evaluate the compound concentrations of the two analyses against one another using the GPA
2261-13 repeatability acceptance criteria.
a. If the analyses do not pass the repeatability acceptance criteria, analyze a third sample
and compare the second and third analyses.
i. Note – Do not pick and choose analyses, only consecutive analyses should be
compared for repeatability.
b. If the second and third analyses do not pass the repeatability acceptance criteria, inspect
the gas chromatograph, sampling system, and calibration standard for discrepancies.
c. If an issue is found, repair as necessary and return to Step 1.
d. In no issue is found, repeat Steps 1 through 4.
i. If the problem persists, remove the gas chromatograph and sampling system from
service until the issues are determined and resolved, and the instrument can pass for
repeatability.
5. If the two analyses pass the repeatability acceptance criteria, evaluate the compound
concentrations of the second analysis against the certified concentrations of the calibration
standard using the GPA 2261-13 reproducibility acceptance criteria.
a. If the analyses pass the reproducibility acceptance criteria, the gas chromatograph can be
placed into service after completing Step 6.
b. If the analyses do not pass the reproducibility acceptance criteria, repeat Steps 1 through
5.
c. If the analyses still do not pass the reproducibility acceptance criteria, document as such
and move on to instrument calibration.
6. Retain all documentation from the As-Found verification necessary to meet all contractual
obligations, regulatory compliance, and company best practices.
Page 13
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 14 of 18
7.3 Calibration:
1. Turn the sample valve at the chromatograph to vent. Vent calibration gas through the
sampling system for sufficient time to ensure a representative sample is delivered to the gas
chromatograph.
2. If the gas chromatograph has a separate calibration stream, turn the sample valve to
calibration gas input. If it does not, turn the sample valve at the chromatograph to the sample
inlet.
3. If a different calibration gas cylinder is being used from the one the chromatograph was
calibrated previously, the new certified values will need to be entered into the chromatograph
and the historical verification software.
4. Process or re-process the calibration analysis as the chromatograph calibration.
5. Upon completion, verify the calibration results.
a. The normalized mole% values should match exactly those values on the calibration gas
certification sheet.
i. If so, proceed to the As-Left verification after completing Step 6.
ii. If not, return to Step 1.
iii. If it still does not match, contact support.
6. Retain all documentation from the calibration necessary to meet all contractual obligations,
regulatory compliance, and company best practices.
1. Leave the sample valve at the chromatograph to calibration gas input or sample inlet, as
appropriate for the instrument.
2. Analyze the calibration standard in duplicate.
3. Evaluate the compound concentrations of the two analyses against one another using the GPA
2261-13 repeatability acceptance criteria.
a. If the analyses do not pass the repeatability acceptance criteria, analyze a third
sample and compare the second and third analyses.
i. Note – Do not pick and choose analyses, only consecutive analyses should
be compared for repeatability.
b. If the second and third analyses do not pass the repeatability acceptance criteria,
inspect the gas chromatograph, sampling system, and calibration standard for
discrepancies.
c. If an issue is found, repair as necessary and return to Step 1 of Calibration.
d. In no issue is found, repeat Steps 1 through 4.
i. If the problem persists, remove the gas chromatograph and sampling
system from service until the issues are determined and resolved, and the
instrument can pass for repeatability.
4. If the two analyses pass the repeatability acceptance criteria, evaluate the average compound
concentrations of the two analyses against the certified concentrations of the calibration
standard using the GPA 2261-13 reproducibility acceptance criteria.
Page 14
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 15 of 18
a. If the analyses pass the reproducibility acceptance criteria, the gas chromatograph
can be placed into service.
b. If the analyses do not pass the reproducibility acceptance criteria, repeat Steps 1
through 5.
c. If the analyses still do not pass the reproducibility acceptance criteria, return to
Step 1 of Calibration.
i. If the problem persists, remove the gas chromatograph and sampling
system from service until the issues are determined and resolved, and the
instrument can pass for reproducibility.
5. Retain all documentation from the As-Left verification necessary to meet all contractual
obligations, regulatory compliance, and company best practices.
Page 15
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 16 of 18
6. All fittings attached to the calibration cylinder should be leak tested initially and then
periodically to maintain integrity of the calibration blend. The cylinder valve and the valve
downstream of the regulator should be closed when the standard is not in use.
7. Each technician’s heated sample line may be used for calibrations and validations. Be aware
that a contaminated line can bias calibration and/or validation results (refer to Section 9.0
Sampling System Validation).
Calibration cylinders on occasion can be prepared incorrectly by the manufacturer. All new
calibration standards should be verified for accuracy prior to being put into service.
1. Perform the full ‘As Found’, ‘Calibration’, and ‘As Left’ procedures (see Section 7
Calibration and Validation) using the almost depleted cylinder which is being replaced.
a. Ensure the almost depleted cylinder has met all GPA 2198 specifications prior to use.
2. Analyze the new calibration cylinder as an unknown. Make sure it has been heated to at least
30º F above hydrocarbon dewpoint for a minimum of 24 hours prior to use and stored
vertically (refer to Section 8.0 Calibration Gas Standard Specifications).
3. Set the regulator to the manufacturer recommended pressure for the sample inlet.
4. Attach heated line. Ensure the heated line is at least 30ºF above hydrocarbon dewpoint before
sampling.
5. Suspend the heated line to keep it off the ground (the cold ground will pull heat from the line
rapidly).
6. Turn the sample valve at the chromatograph to vent. Vent calibration gas through the
sampling system for sufficient time to ensure a representative sample is delivered to the gas
chromatograph.
7. Turn the sample valve at the chromatograph to the sample inlet.
8. Analyze the calibration standard in duplicate.
9. Evaluate the compound concentrations of the two analyses against one another using the GPA
2261-13 repeatability acceptance criteria.
a. If the analyses do not pass the repeatability acceptance criteria, analyze a third sample
and compare the second and third analyses.
i. Note – Do not pick and choose analyses, only consecutive analyses should be
compared for repeatability.
b. If the second and third analyses do not pass the repeatability acceptance criteria, attempt
verification of the calibration cylinder on a different gas chromatograph.
i. If the cylinder does not pass the criteria on a second instrument, contact the
calibration standard manufacturer.
10. If the two analyses pass the repeatability acceptance criteria, evaluate the average compound
concentrations of the two analyses against the certified concentrations of the calibration
standard using the GPA 2261-13 reproducibility acceptance criteria.
a. If the analyses pass the reproducibility acceptance criteria, the calibration gas cylinder
can be placed into service after completing Step 11.
Page 16
Portable Gas
CHROMATOGRAPHY Chromatography
Standard Operating Authorized By: Rev.: 1.0
Procedure Date: 26-Apr-17
Page 17 of 18
b. If the analyses do not pass the reproducibility acceptance criteria, repeat Steps 1 through
5.
c. If the analyses still do not pass the reproducibility acceptance criteria, attempt
verification of the calibration cylinder on a different gas chromatograph.
i. If the cylinder does not pass the criteria on a second instrument, contact the
calibration standard manufacturer.
11. Retain all documentation from the cylinder verification necessary to meet all contractual
obligations, regulatory compliance, and company best practices.
iii. Replace the inner tubing in the sample line if it is designed to do so.
iv. If the sample line does not clean up and does not have a replaceable inner line, a light
soapy solution in warm water can be used.
(1) Pump the solution through the entire sample line, with the sample line on and
warm, for 2 to 4 hours (the solution should not be pumped through the
filter/regulator assembly or any part of the chromatograph).
(2) Pump clean water through the sample line, with the sample line on and warm, for
approximately 4 hours.
(3) Pump air through the line for approximately 8 hours. Ensure the line is
completely dry prior to re-attaching it to the chromatograph.
(4) Do not use any type cleaner or solvent to clean any part of the sampling system
that contains petroleum distillates, toluene, or benzene.
v. Return to Step 1.
7. Validate the cleanliness of the sampling system at least monthly. Inspect membrane element
at least monthly for holes and discoloration. Replace membrane element as necessary.
Note:
Inspection and replacement of the membrane may be required more frequently depending
on the type of field gas sampled. It would not be an uncommon practice to replace the
membrane filter on a weekly or daily basis if needed in order to keep the sampling system
free of contamination.
8. Keep the end connection of the heated line and filter/regulator assembly capped when not
collecting samples. This will keep dust and other contaminants from entering the line when
not in use.
10.0 Miscellaneous
1. By using the filter/regulator assembly, contamination to the hose and GC will be held to a
minimum.
2. If the sampling system (filter/regulator assembly or heated line) become contaminated during
field-testing, remove them from service, clean, and then validate. Discontinue the use of the
sampling system until clean. If contaminated, not only the GC is at risk, but the validity of
any samples analyzed can be compromised and biased.
3. The heated line and heated filter/regulator assembly are integral parts of the inlet system to
the GC. They are necessary to keep the sample gas in single phase. If at any time, these
items cease to function properly, remove them from service and replace the affected parts.
4. It is recommended to purge the sample line with sample gas, standard gas, or UHP Helium
regulated to the manufacturer recommended pressure for at least 2 minutes, to ensure the
sampling system is dry and conditioned, before the initial sampling each day.
Page 18