PP Safety communication
Issue Aug/2022
Line of Fire
Studi Kasus Kecelakaan
Pekerja kontraktor berada di area berbahaya dekat dengan area pengangkatan crane (line of fire).
Terdapat potensi beban tersebut jatuh atau beban mengayun mengenai pekerja kontraktor.
Kecelakaan Kerja Yang Pernah Terjadi
Pekerja kontraktor terkena precast saat dilakukan pengangkatan
menggunakan mobile crane dan mengakibatkan korban terjatuh dan
meninggal dunia.
Pekerja kontraktor berada
di radius area crane.
(Line of Fire)
Berada di area pengangkatan
(lifting area), terdapat resiko
Posisi pengangkatan precast sheet tidak
benda jatuh atau mengayun ke terlihat dari ruang kontrol crane.
arah pekerja.
Kontraktor berdiri di area berbaha
(line of fire)
Learning Point
Harus dilakukan penilaian resiko Dilarang berada di bawah area
posisi kerja dimana kita berada, apakah terdapat pengangkatan crane atau dalam radius putaran
kemungkingan tertimpa benda dari atas atau boom crane (Line of fire)
terkena ayunan benda di sekitar area kerja.
Penilaian Risiko
Reference : Safety Communication PP Safety Management SKIC
PP Safety communication
Issue Aug/2022
Line of Fire
Case study in the past
Contractors stood in a dangerous position near the heavy lifting work area (line of fire).
There was a chance that the object could fall or was swung directly into the contractors.
Work-Related Accident in the past
A contractor was hit by a precast sheet. While being lifted
to install on a building with a mobile crane.
Causing the contractor fell from the building and passed away.
Contractors were standing in a crane
working radius.
(Line of Fire)
Being near the lifting work area.
There is a risk of objects falling or
The position where the precast sheet was lifted was an
swinging directly on us. invisible point from the crane control room.
Contractors were standing
in the line of fire position.
Learning Point
Must assess the position we are Do not stand directly under the
standing, there is a likelihood that the objects crane or within the radius of the crane boom.
from lifting work can fall or be swung to us or not. (Line of fire)
Assess risks
Reference : Safety Communication PP Safety Management SKIC