ION-U Installation

The document provides instructions for commissioning a remote unit master system, including mechanical, electrical, and optical fiber cabling installation. It describes assembling the master unit rack, mounting components, connecting power sources, addressing subracks, installing modules, and cabling the remote and master units for radio frequency and optical fiber connections. Safety precautions are provided throughout for various installation tasks.

Uploaded by

M. Mughary
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
284 views51 pages

ION-U Installation

The document provides instructions for commissioning a remote unit master system, including mechanical, electrical, and optical fiber cabling installation. It describes assembling the master unit rack, mounting components, connecting power sources, addressing subracks, installing modules, and cabling the remote and master units for radio frequency and optical fiber connections. Safety precautions are provided throughout for various installation tasks.

Uploaded by

M. Mughary
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 51

5.

Commissioning
5.1. Overview

Remote Units

Master Unit
5.2. Mechanical Installation
5.2.1. Health and Safety for mechanical installation

Caution:

5.2.2. Property Damage warnings for mechanical installation


Note:

Note: due to fire


protection requirements construction ground
non-combustible material concrete
Note:

Note:

Note:

Note:
For ION-U MU in outdoor cabinet:
5.2.3. Rules for assembling the ION-U Master Unit rack

2. For 47 HU Master Units

Step 1 diagonal

Step 2:

Step 3:
Step 4:

Step 5:

Step 6:
5.2.3.1. Cage nuts
5.2.3.2. PSU subrack and PDU (1 height unit each)

figure 5-1 Mounting position of PDU and PSU subrack

table 5-1 PSU positions in PSU subrack


5.2.3.3. ION-U subrack (4 height units)

5.2.3.4. Cable tray

5.2.3.5. i-POI subrack (4 height units)

Note:

1.

2.

a)

b)

3.
5.2.4. Rules for assembling the ION-U Master Unit modules
5.2.4.1. i-POI subrack SR 8/POI

5.2.4.2. ION-U subrack, SR 12 or SR 12/dM


5.2.5. Rack mounting of the MU components

Rack Layout
Report

figure 5-2 Rack Layout Report


5.2.6. Installation of ION-U subrack to a 19” Rack

Note

figure 5-3 19” rack guide rails mounted


5.2.7. 19 Inch 2-post rack mounting of the ION-U subrack

Note

figure 5-4 2-post guide rails mounted


5.2.8. 19 Inch 4-post rack mounting of the ION-U subrack

Note
figure 5-5 4-post guide rails mounted
5.3. Electrical Installation
5.3.1. Health and Safety for electrical installation
.

Danger: Electrical hazard. Danger of death or fatal injury from electrical


current. Obey all general and regional installation and safety regulations
relating to work on high voltage installations, as well as regulations
covering correct use of tools and personal protective equipment.

5.3.2. Property Damage warnings for electrical installation


Attention:

Attention:

Attention:

Attention:

Attention:

Attention:

Notice:

Notice:
Notice:

Notice:

Notice:
5.3.3. Installation of mains, PDU and PSU

5.3.3.1. Installation of the mains cabling

HIGH LEAKAGE CURRENT!


5.3.3.2. Mounting the mains terminal block

HIGH LEAKAGE
CURRENT!

before

figure 5-6 Mains terminal block mounting


5.3.3.3. Grounding (Earthing) the PSU subrack

figure 5-7 Grounding bolts figure 5-8 Grounding bolt screw joint
5.3.3.4. Mounting order for PSU/PDU

Note:

figure 5-9 CN1 jumper switch at PSU subrack

figure 5-10 PSU-PDU mounting order drawing

[A]

[B] .
[C]

[D]
Rack Layout Report Equipment List Report

figure 5-11 PSU subrack numbering

5.3.3.5. PDU and PSU connections

figure 5-12 PDU/PSU interconnections


figure 5-13 PDU to PSU ribbon cables

Attention:

RED (+) Black (-)

figure 5-14 PSU power terminals

figure 5-15 Installation order of PSU subrack power terminals


5.3.4. PDU configuration

5.3.4.1. System bus address configuration

figure 5-16 PDU address rotary switch

Note:
5.3.4.2. Fan alarm supervision configuration

figure 5-17 PDU Fan alarm configuration DIP switch

Note:
5.3.4.3. System bus interface configuration

figure 5-18 PDU System-Bus interface configuration DIP switch


5.3.5. Installation of power from PDU to subracks and RMC1600

figure 5-19 DC connectors at PDU rear side

figure 5-20 DC cabling of first subrack


5.3.6. ION-U bus cabling

internal bus connection

Ethernet bus connection


5.3.7. Performance-optimized bus cabling (rack rear side)

figure 5-21 Bus cabling rear side

Notice
5.3.8. Quick-and-easy bus cabling (rack rear side)

Note:

figure 5-22 Bus cabling rear side


5.3.9. Bus cabling (MU internal Ethernet, rack front side)

figure 5-24 Site LAN 3 connector

4.9 ESC 8 (Ethernet


switch).

Note:

figure 5-23 Bus cabling front side


5.4. Install the Modules in Subracks

5.4.1. Install modules with GUI assistance

figure 5-25 Module installation with GUI


figure 5-26 Module installation tasks completed

figure 5-27 Insert modules into slots

ION-U Site Manager

5.4.2. Install modules with ION-U reports (Printouts)


figure 5-28 Color coded Rack Report

Work Order Report Populating Hardware

figure 5-29 Work Order Report


figure 5-30 Shipping boxes labeled with color code and number

5.4.3. Setting the rack and subrack addresses


TURN PRESS

figure 5-31 Rotary Encoder navigation

Startup

Operational Status

Or
Enter or Change the Rack Number

Select

Rack
Enter or Change Subrack Number

Select

Subrack

Module Reset

Select

Module Reset
Backplane Reset

Select

Backplane Reset

Module Shutdown

Module Shutdown

Select

Module Shutdown
Module Reboot

Select

Module Reboot

5.5. RF Cabling

figure 5-32 Cable tray


figure 5-33 Cable tray, deep version

figure 5-34

figure 5-34 Cable tray RF cable routing

figure 5-35 Cable tray –RF cable routing


5.5.1. RF cabling with the Site Manager GUI

figure 5-36 Connect cable to port indicated by flashing LED


figure 5-37 Connect cable to port indicated by flashing i-POI display

figure 5-38 Site Manager cabling task list


5.5.2. RF cabling with the reports (Printout)
Cabling Report

figure 5-39 Cabling report

5.5.3. i-POI to BTS RF cabling

.
Notice:

CommScope e-catalog

CommScope e-catalog

Attention:

5.5.3.1. Cleaning procedure for RF cable connectors


Caution

Warning

Caution
5.5.3.2. Antenna cable connector assembly
5.6. Optical Fiber Cabling

figure 5-40 Cable tray – optical cable routing


5.6.1. Precautions and rules
Caution:

figure 5-41 Cascaded optical system


5.6.2. Optical fiber cabling with the Site Manager GUI

5.6.3. Optical fiber cabling with reports (Printout)


MU-RU Cabling Report

figure 5-42 Optical cabling report

5.6.4. Automatic system leveling

figure 5-43 Autolevelling progress