Doc Ref
Rev No 01
INPROCESS INSPECTION REPORT Rev Date 8/1/2019
PROCESS NAME : OPERATOR NAME : MACHINE No : DATE & MONTH :
PART NAME & No. OBSERVED OPERATOR
S.No CUSTOMER NAME JOB CARD No ( or ) Model Name COLORS NAME SPECIFCATION INSPECTED BY SIGN REMARKS
1 2 3 4 5
DENSITY
READY OUT
PRINTING PATCHES /
SMUDGES
COLOR VARIATION
INK SPREAD
DENSITY
READY OUT
PRINTING PATCHES /
SMUDGES
COLOR VARIATION
INK SPREAD
DENSITY
READY OUT
PRINTING PATCHES /
SMUDGES
COLOR VARIATION
INK SPREAD
DENSITY
READY OUT
PRINTING PATCHES /
SMUDGES
COLOR VARIATION
INK SPREAD
SHIFT INCHARGE SIGN
NOTES :
1. If found Any deviation inform to concern and make the parts as per Master card & Jobcards details. 3. Apperance Parameters need to check. ( Scratch Marks, , Dent & Damages)
2.Before Make the continious Prodcution QA Approval Must.
NOTES :
1. If found Any deviation inform to concern and make the parts as per Master card & Jobcards details. 3. Apperance Parameters need to check. ( Scratch Marks, , Dent & Damages)
2.Before Make the continious Prodcution QA Approval Must.