DRAWING AND DOCUMENT NUMBERING PROCEDURE
TABLE OF CONTENT
1.0      INTRODUCTION........................................................................................................ 3 
1.1      PURPOSE AND SCOPE ............................................................................................... 3 
1.2      IMPLEMENTATION AND RESPONSIBLE ............................................................... 3 
1.3      REFERENCES .............................................................................................................. 3 
1.4      ABBREVIATIONS ....................................................................................................... 3 
2.0      DOCUMENT AND DRAWING IDENTIFICATION NUMBER ........................... 4 
3.0      DOCUMENT AND DRAWING NUMBERING CONTROL ................................. 5 
3.1      PROJECT CODE ........................................................................................................... 5 
3.2      PLANT, AREA & UNIT CODES ................................................................................. 5 
3.3      PURCHASEMENT ORDER CODE ............................................................................. 5 
3.4      DOCUMENT CATEGORY AND TYPE CODE .......................................................... 6 
3.5      DISCIPLINE CODE ...................................................................................................... 6 
3.6      SEQUENCE NUMBER................................................................................................. 6 
3.7      SYSTEM CODE ............................................................................................................ 6 
4.0      DOCUMENT CHANGE CONTROL ........................................................................ 7 
4.1      REVISION DESIGNATION PROGRESSION............................................................. 8 
4.2      USE OF REVISION MARKING .................................................................................. 8 
5.0      BLOCK NUMBER ALLOCATION ........................................................................ 10 
APPENDIX – A: PLANT CODE.......................................................................................... 11 
APPENDIX – B: AREA AND UNIT CODE ....................................................................... 12 
APPENDIX – C: DOCUMENT CATEGORY AND TYPE CODE .................................. 17 
APPENDIX – D: SYSTEM CODE ....................................................................................... 22 
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 2 of 24
                     DRAWING AND DOCUMENT NUMBERING PROCEDURE
1.0    INTRODUCTION
1.1    PURPOSE AND SCOPE
       The purpose of this procedure is to ensure that technical documentation including
       drawings, datasheets, calculations, specification etc are systematically numbered,
       registered, filed, revised and traced. The system includes electronic file naming and is
       applicable to Lam Son JOC, Contractor and Vendor generated documentation.
       This procedure excludes the following:
       (i)    Format for Correspondence
       (ii)   Format for all Proforma's which form part of the work instructions and will be
              attached to the individual work instruction
       Once a document has been assigned a number, it will keep that same number
       throughout its life.
1.2    IMPLEMENTATION AND RESPONSIBLE
       Document Controller is responsible for the coordination of this procedure which shall be
       adhered to by the Development department, contractors and vendors
       The use of the formats and codes specified in this procedure is mandatory. Any changes
       can only be implemented through the proper request of changes and approval by
       Development Manager.
1.3    REFERENCES
1.4    ABBREVIATIONS
       LSJOC         Lam Son Joint Operating Company
       PMT           Project Management Team
       TLDD          Thang Long and Dong Do
       HXSP          Ho Xam Sao
       EDMS          Electronic Document Management System
       SPF           SmartPlant Foundation – an EDMS solution of Intergraph
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 3 of 24
                     DRAWING AND DOCUMENT NUMBERING PROCEDURE
2.0    DOCUMENT AND DRAWING IDENTIFICATION NUMBER
       All documents and drawings shall be allocated an identification number in accordance
       with the following format:
                     AAAA – BBBB-CCCD –EEE – HHHH
                     AAAA           is the Project Code
                     BBBB           is the Purchase Order Number
                     CCC            is the Unit Code
                                    The first digit of Unit Code is Plant Code
                                    The two first digits of Unit Code is Area Code
                     D              is the Discipline Code
                     EEE            is the Document Type
                     HHHH           is the Sequential Number
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 4 of 24
                     DRAWING AND DOCUMENT NUMBERING PROCEDURE
3.0    DOCUMENT AND DRAWING NUMBERING CONTROL
3.1    PROJECT CODE
       The Project Code for Thang Long – Dong Do and Ho Xam Sao is TLDD and HXXP
       respectively. It is always the first identifier of the document/drawing number and consists
       of four characters. See below table.
          Project Code                             Description
             TLDD          Thang Long & Dong Do Field
             HXSP          Ho Xam South Project
3.2    PLANT, AREA & UNIT CODES
       The Plant, Area & Unit Coding system is designed to allow correct matching of
       documents and drawings to their specific area or equipment.
       The Plant consists of one digit (See Appendix A)
       The Area consists of two characters (See Appendix B)
       The Unit consists of three characters (See Appendix B)
3.3    PURCHASEMENT ORDER CODE
       Four-digits of Purchase Order code are used to identify the originator of document. See
       below table.
        Purchase Order                                 Description
            Code
             0000          Document issued by LSJOC
             0001          Document issued by Conceptual Engineering Contractor
             0002          Document issued by FEED Engineering Contractor
             0003          Document issued by Detail Engineering Contractor
             0004          Document issued by Onshore Fabrication & Construction
                           Constructor
              0005         Document issued by Onshore Fabrication & Construction
                           Contractor
              0006         Document issued by Load-out & Transportation
              0007         Document issued by Offshore Installation & Construction
                           Contractor
              0008         Document issued by Hookup & Pre-
                           commissioning\Commissioning Contractor
             0009          Document issued by Project’s Operator\Owner
             ZZZZ          Registered Purchase Order Number
                           Vendor’s documents follow LSJOC’s PO
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 5 of 24
                     DRAWING AND DOCUMENT NUMBERING PROCEDURE
3.4    DOCUMENT CATEGORY AND TYPE CODE
       A single alpha character is used to identify the document category.
       Three character codes are used to define the type of document within the stated document
       category. Each document shall be assigned a Document Type code which most closely
       matches the contents of the document. See Appendix C
       Document Category “B” to “S” is applied to Vendor documents and only “A” Document
       Category is used for other kinds of documents such as Engineering, Project Management,
       Procurement ….
3.5    DISCIPLINE CODE
       A single alpha character is used to identify the document discipline code. See below table
       For documents, which are not, discipline related i.e. which cover more than one discipline
       or are of a general nature, the code ‘G’ shall be used.
             Name                                     Description
              D           Drilling/Completion/Well Intervention
              E           Electrical
              G           General
               J          Instrumentation
              K           Telecommunication
              M           Mechanical
              P           Process
              Q           HSEQ
              S           Structural / Naval Architecture/Construction
              U           Operations / Maintenance
              V           Subsea/ Marine
              W           Pipelines
              T           Piping
3.6    SEQUENCE NUMBER
       A four digit Sequence number shall be allocated with each combination of Project Code,
       Unit code, document type code and discipline code.
3.7    SYSTEM CODE
       Three character codes are used to classify and manage the documents and tag. This is also
       one of document attributes. See Appendix D
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 6 of 24
                     DRAWING AND DOCUMENT NUMBERING PROCEDURE
4.0    DOCUMENT CHANGE CONTROL
       The revision coding shall be an alpha-numerical code starting at A1 for the first issue.
       Document/drawing revisions are then incremented by one (eg Rev A2, A3) for each
       subsequent issue, marked with the purpose of issue as below table. The revision code will
       change from one series to another series (A to B or C to D) at the beginning of a new
       phase (eg Pre-FEED and FEED, Detailed Design, Approved for Construction etc).
       Documents/drawings which are issued as “As-Built” are allocated revision designation
       D1.
       As some Pre-FEED and FEED documents shall be updated during Detailed Design phase
       and all these documents have been issued in revision B series at B1, B2 or B..etc. Updated
       documents during detailed design need to be issued for review before these can be issued
       for Approved for Construction. First issue of such documents during detailed design shall
       be issued at the next revision of B series with description “issued for review”.
       Engineering documents which are first issues during FEED and Detailed Design shall be
       issued as revision A i.e. A1, A2 etc and the final revision of engineering documents shall
       be issued as revision series B and C respectively.
       Changes to all documents are made as per the Contract requirements. Document change is
       governed by the revision code. “Superseded” stamps are used where applicable for
       retention of an obsolete copy of a document. Copies holder is responsible for clearly
       identifying all retained superseded copies by any suitable means.
       An alpha-numerical code is used for the revision system as follows:
        Rev Designation                                                      Clouding
                                                                             Req’d Y/N
        Formal Revision
        A1     Issued for Review (1st time)                                  N
        A2     Revised for Review (2nd time)                                 Y
        A..    Revised for Review (3rd time)                                 Y
        B1     Approved for Design         or   Enquiry   or   Issued   for N
               Implementation
        B2     Revised for Design         or    Enquiry   or   Issued   for Y
               Implementation
        B..    Revised for Design         or    Enquiry   or   Issued   for Y
               Implementation
        C1     Approved for Construction or Purchase or Commissioning        N
        C2     Revised for Construction or Purchase or Commissioning         Y
        C..    Revised for Construction or Purchase or Commissioning         Y
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 7 of 24
                     DRAWING AND DOCUMENT NUMBERING PROCEDURE
        D1     As-Built                                                     N
        D..    Revised As-Built                                             Y
        E1     Operation Phase Modification – As Built                      N
        E..    Revised Operations Phase Modification – As Built             Y
4.1    REVISION DESIGNATION PROGRESSION
       ‘A’ Revision Series - Issued for Review
       When the responsible discipline releases the document/drawing outside it’s own discipline
       for IDC, the revision number is A1 and document shall be marked ‘Issued for Review’.
       Document/drawing revisions are then incremented by one (eg Rev A2, A3) for each
       subsequent issue and marked ‘Revised for Review’
       ‘B’ Revision Series - Approved for Design or Enquiry or Issued for Implementation
       Documents/drawings prepared as input to design or enquiry or implementation are
       allocated revision designation B1 when all agreed revision ‘A’ comments and
       improvements have been concluded. Document/drawing revisions are incremented by one
       (eg Rev B2, B3) for each subsequent issue and marked ‘Revised for Design or Enquiry or
       Implementation’.
       ‘C’ Revision Series - Approved for Construction or Purchase or Commissioning
       Documents/drawings prepared for construction or purchase or commissioning are
       allocated revision designation C1 when all agreed revision ‘B’ comments and
       improvements have been concluded. Document/drawing revisions are incremented by one
       (eg Rev C2, C3) for each subsequent issue and marked ‘Revised for Construction or
       Purchase or Commissioning’.
       ‘D’ Revision Series - As-Built
       Documents/drawings which are issued as ‘As-Built’ are allocated revision designation D1
       at the time of as-building. Document/drawing revisions are incremented by one (eg Rev
       D2, D3) for each subsequent issue.
       ‘V’ Revision Series - Void
       Documents/drawings which, are deleted, cancelled or ceased from use shall be updated as
       ‘Void’ are allocated revision designation V1 on the registers.
4.2    USE OF REVISION MARKING
       Revision marking of documents shall reflect differences between the previous revision
       and the current revision. Revision markings made in previous revision are removed when
       processing the current revision. The Author/Draftsperson is responsible for ensuring that
       all revisions are marked or detailed as follows:
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 8 of 24
                     DRAWING AND DOCUMENT NUMBERING PROCEDURE
       Changes to drawings and datasheets within a revision series A, B, C, D etc shall be
       indicated by clouding (for drawings and datasheets only) the changes and the use of a
       revision triangle. When a drawing or datasheet changes from revision A to B to C to D
       etc the clouds from the previous revision shall be dropped.
       Text changes in documents shall be marked by a vertical line in the right hand margin,
       opposite each change. Non-text changes (including figures/flowcharts) shall be indicated
       by a vertical line and revision triangle (which includes the revision number within the
       triangle) against each revision in the right hand margin.
       At Rev A1, B1, C1, D1 etc, no revision marking is to be shown in the document.
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 9 of 24
                     DRAWING AND DOCUMENT NUMBERING PROCEDURE
5.0    BLOCK NUMBER ALLOCATION
       The Document Controller is responsible for the allocation of sequential number blocks.
       (See below table)
       Blocks of sequential numbers are allocated to the different contractor (originators) which
       shall be responsible for allocating numbers to prevent double issue of the same number.
       Each contractor is responsible for ensuring that only numbers within the allocated blocks
       are used.
               Originator                     Abbreviation     Block Number Allocation
           Thang Long Dong Do Field
          Genesis Oil & Gas Consultation            GEN                0001 - 0999
                       Ltd.
           RNZ Integrated (M) Sdn Bhd               RNZ                0001 – 0999
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 10 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
APPENDIX – A: PLANT CODE
         Plant Code                                    Description
              1                TLDD Field
              2                TL WHP
              3                DD WHP
              4                Infield pipelines/Umbilical
              5                FPSO
              6                Export Gas Pipeline
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 11 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
APPENDIX – B: AREA AND UNIT CODE
 Plant   Area        Area Description        Unit             Unit Description
 code    Code                                Code
   1      1A     TLDD Field General         1AA     TLDD Field General
   2      2A     TL WHP General             2AA     TL WHP General
                                            2AB     TL WHP HSE, Evacuation, Emergency
                                                    And Life Saving Equipment System
                                            2AC     TL WHP Electrical Power Generation
                                                    And Distribution System/Switchgear
                                                    Room
                                            2AD     TL WHP Lighting System
                                            2AE     TL WHP Ups And Battery Units
                                            2AF     TL WHP F&G System
                                            2AG     TL WHP PA And Telecommunication
                                                    System
                                            2AH     TL WHP Fire Fighting System
                                            2AI     TL WHP Waste Handling System
                                            2AJ     TL WHP Material Handling And
                                                    Workshop
          2B     TL WHP Wells, Top          2BA     TL WHP Wells And X-Mas Tree
                 Deck, Drilling And Well
                 Intervention Operation     2BB     TL WHP Subsurface Safety Valve And
                 Area                               Hydraulic Control System
          2C     TL WHP Process Area        2CA     TL WHP Manifold And Well Flow Rate
                                                    Testing System
                                            2CB     TL WHP Multiphase Pumps
                                            2CC     TL WHP Well Fluid Heaters
                                            2CD     TL WHP Cold Start Pump System
                                            2CE     TL WHP Pipeline Pigging System
                                            2CF     TL WHP Bdv, ESD Valves And ESD
                                                    System
                                            2CG     TL WHP Sand Control And Removal
                                                    System
                                            2CH     TL WHP Drain System
                                            2CI     TL WHP Heat Tracing System
                                            2CJ     TL WHP Cold Vent And Flare System
                                            2CK     TL WHP Control Room / Process
                                                    Control System
                                            2CL     TL WHP Hydrocarbon Separation
                                                    System
                                            2CM     TL WHP Water Injection System
                                            2CN     TL WHP Gas Lift System
                                            2CO     TL WHP Gas Injection System
          2D     TL WHP Helideck &          2DA     TL WHP Diesel And Helifuel System
                 Cranes                     2DB     TL WHP Cranes And Lifting System
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 12 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
 Plant   Area        Area Description        Unit             Unit Description
 code    Code                                Code
                                            2DC     TL WHP Hatches And Topdeck
           2E    TL WHP Operator            2EA     TL WHP Shelter / Accommodation
                 Shelter
          2F     TL WHP Risers              2FA     TL WHP Risers, SSIV
          2G     TL WHP Jacket              2GA     TL WHP Jacket
                                            2GB     TL WHP Cathodic Protection
          2H     TL WHP Foundation          2HA     TL WHP Piles And Foundation
                 And Piles
           2I    TL WHP Chemical And        2IA     TL WHP Chemical Injection System
                 Utility Area               2IB     TL WHP Plan And Instrument Air
                                                    System
                                            2IC     TL WHP HVAC
                                            2ID     TL WHP Fuel Gas System
                                            2IE     TL WHP Utility Water And Potable
                                                    Water System
                                            2IF     TL WHP Sea Water System
   3      3A     DD WHP General             3AA     DDWHP General
                                            3AB     DD WHP HSE, Evacuation, Emergency
                                                    And Life Saving Equipment System
                                            3AC     DD WHP Electrical Power Generation
                                                    And Distribution System/Switchgear
                                                    Room
                                            3AD     DD WHP Lighting System
                                            3AE     DD WHP Ups And Battery Units
                                            3AF     DD WHP F&G System
                                            3AG     DD WHP PA And Telecommunication
                                                    System
                                            3AH     DD WHP Fire Fighting System
                                            3AI     DD WHP Waste Handling System
          3B     DD WHP Wells, Top          3BA     DD WHP Wells And X-Mas Tree
                 Deck, Drilling And Well
                 Intervention Operation     3BB     DD WHP Subsurface Safety Valve And
                 Area                               Hydraulic Control System
                                            3BC     DD WHP Hatches And Topdeck
          3C     DD WHP Process Area        3CA     DD WHP Manifold And Well Flow rate
                                                    Testing System
                                            3CB     DD WHP Multiphase Pumps
                                            3CC     DD WHP Well Fluid Heaters
                                            3CD     DD WHP Cold Start Pump System
                                            3CE     DD WHP Pipeline Pigging System
                                            3CF     DD WHP BDV, ESD Valves And ESD
                                                    System
                                            3CG     DD WHP Sand Control And Removal
                                                    System
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 13 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
 Plant   Area        Area Description         Unit             Unit Description
 code    Code                                 Code
                                             3CH     DD WHP Drain System
                                             3CI     DD WHP Heat Tracing System
                                             3CJ     DD WHP Cold Vent And Flare System
                                             3CK     DD WHP Hydrocarbon Separation
                                                     System
                                             3CL     DD WHP Water Injection System
                                             3CM     DD WHP Gas Lift System
                                             3CN     DD WHP Gas Injection System
                                             3CO     DD WHP H2s Removal System
          3D     DD WHP Helideck And         3DA     DD WHP Cranes And Lifting System
                 Cranes
           3E    DD WHP Operator             3EA     DD WHP Control Room / Process
                 Shelter/Accommodation               Control System
                                             3EB     DD WHP Shelter / Accommodation
          3F     DD WHP Risers               3FA     DD WHP Risers, SSIV
          3G     DD WHP Jacket               3GA     DD WHP Jacket
                                             3GB     DD WHP Cathodic Protection
                                             3GC     DD WHP Utility Water And Potable
                                                     Water System
                                             3GD     DD WHP Sea Water System
          3H     DD WHP Foundation           3HA     DD WHP Piles And Foundation
                 And Piles
           3I    DD WHP H2S Removal          3IA     DD WHP H2s Removal Unit
                 Unit
           3J    DD WHP Chemical And         3JA     DDWHP Chemical Injection System
                 Utility Areas               3JB     DDWHP Diesel And Helifuel System
                                             3JC     DDWHP Plan And Instrument Air
                                                     System
                                             3JD     DDWHP HVAC
                                             3JE     DDWHP Fuel Gas System
                                             3JF     DDWHP Inert Gas System
                                             3JG     DDWHP Sea wage System
                                             3JH     DDWHP Material Handling And
                                                     Workshop
4         4A     Infield Pipelines General   4AA     TLDD Infields Pipeline And Umbilical
                                                     General
          4B     TLWHP - FPSO Fws            4BA     TLWHP - FPSO FWS Pipeline
                 Pipeline
          4C     FPSO-TL Gas Lift            4CA     FPSO - TL WHP Gas Lift Pipeline
                 Pipeline
          4D     FPSO-TL Water               4DA     FPSO - TL WHP Water Injection
                 Injection Pipeline                  Pipeline
           4E    FPSO-TL Umbilical           4EA     FPSO - TL WHP Umbilical
           4F    DD-FPSO Fws Pipeline        4FA     DD WHP - FPSO Fws Pipeline
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 14 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
 Plant   Area        Area Description        Unit             Unit Description
 code    Code                                Code
          4G     FPSO-DD Gas Lift           4GA     FPSO - DD WHP Gas Lift Pipeline
                 Pipeline
          4H     FPSO-DD Water              4HA     FPSO - DD WHP Water Injection
                 Injection Pipeline                 Pipeline
           4I    FPSO-DD Umbilical          4IA     FPSO - DD WHP Umbilical
           4J    PLEM                       4JA     PLEM
5         5A     FPSO General               5AA     FPSO General
                                            5AB     FPSO TOPSIDE - F&G And ESD
                                                    Control System
                                            5AC     Fire Fighting System
                                            5AD     HSE, Evacuation, Emergency And Life
                                                    Saving Equipment System
                                            5AE     FPSO Topside - Lighting System
                                            5AF     FPSO Topside - Workshop, Stores And
                                                    Material Handling System
                                            5AG     Metocean Monitoring And Navigation
                                                    System
                                            5AH     Helicopter And Aviation System
                                            5AI     FPSO Topside - Waste Handling System
          5B     FPSO Flexible Riser,       5BA     FPSO Flexible Riser And Subsea
                 Umbilical And Support              Support System
                 System
          5C     FPSO Turret And            5CA     FPSO Turret
                 Mooring System             5CB     FPSO Mooring System
          5D     FPSO Topside Process       5DA     FPSO Topside - Pig Receiving And
                 Area                               Launching System
                                            5DB     FPSO Topside - Slug Catcher
                                            5DC     FPSO Topside - Hydrocarbon Separation
                                                    System
                                            5DD     FPSO Topside - Sand Control, Removal
                                                    And Handling System
                                            5DE     FPSO Topside - Produced Water
                                                    Treatment System
                                            5DF     FPSO Topside - Drain, Caisson And Oil
                                                    Recovery System
                                            5DG     FPSO Topside - Gas Compression And
                                                    LTS System
                                            5DH     FPSO Topside - Gas Lift System
                                            5DI     FPSO Topside - Gas Injection System
                                            5DJ     FPSO Topside - Dehydration System
                                            5DK     FPSO Topside - Gas Sweetening System
                                            5DL     FPSO Topside - Water Injection And
                                                    Filtration System
                                            5DM     FPSO Topside - Heat Tracing
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 15 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
 Plant   Area        Area Description        Unit              Unit Description
 code    Code                                Code
                                            5DN     Export Oil Metering , Pumping And
                                                    Offloading System
                                            5DO     FPSO Topside - Vent, Pressure Relief,
                                                    Blowdown And Ignition System
                                            5DP     FPSO Topside - Fuel Gas System
                                            5DQ     Export Oil Storage And Heating System
                                            5DR     FPSO Topside Chemical Injection And
                                                    Storage System
                                            5DS     Corrosion And Integrity Control System
                                            5DT     Laboratory And Sampling System
                                            5DU     IT, Telecommunication And PA System
                                            5DV     Heating Medium System
           5E    FPSO Topside Utility       5EA     Seawater System
                 Area                       5EB     FPSO Topside - Diesel And Helifuel
                                                    System
                                            5EC     FPSO Topside - Utility And Instrument
                                                    Air System
                                            5ED     FPSO Topside - Inert Gas System
                                            5EE     Utility Water, Fresh Water And Potable
                                                    Water System
                                            5EF     FPSO Topside - Water Cooling System
                                            5EG     HVAC
                                            5EH     FPSO Topside - Electrical Power
                                                    Generation
                                            5EI     FPSO Topside - Electrical Power
                                                    Distribution And Switchgear Room
                                            5EJ     FPSO Topside -Ups, Battery And
                                                    Emergency Power System
                                            5EK     Crane And Lifting System
           5F    FPSO Cargo, Ballast,       5FA     FPSO Tanks: Cargos, Ballast, Slop
                 Diesel, Fresh Water And
                 Lube Oil Tanks             5FB     Ship Marine System
          5G     FPSO Offloading System     5GA     FPSO Offloading System
          5H     FPSO Crane And Lay-        5HA     FPSO Crane And Lay-down Area
                 down Area
           5I    FPSO Accommodation         5IA     FPSO Central Control Room And
                 And Machinery Space                Process Control System
                 Area                       5IB     Accommodation
           5J    FPSO Central Control       5JA     FPSO Central Control Room
                 Room
   6      6A     Gas Export General         6AA     Gas Export General
          6B     Gas Export Topside Area    6BA     Gas Export Topside System
          6C     Export Gas Pipeline        6CA     Gas Export Pipeline
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 16 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
APPENDIX – C: DOCUMENT CATEGORY AND TYPE CODE
  Document Category                                   Description
    and Type Code
           A              PROJECT MANAGEMENT, ENGINEERING,
                          PROCUREMENT DOCUMENTS …
          A01             Basis of Design / Design Criteria
          A02             Calculations
          A03             Drawings
          A04             Service Support Drawings
          A05             Loop Diagrams
          A06             Philosophies
          A07             Reports
          A08             Studies
          A09             Specifications
          A10             Procedures
          A11             Datasheets
          A12             Schedules/ Indices/ Lists
          A13             MTO’s
          A14             Manuals
          A15             Work Packs / Dossiers
          A16             Technical Notes
          A17             Technical Requirement/ Scope of Work
          A18             Sketches / Road Map
          A19             Project Organization
          A20             Change Order
          A21             Purchase Order / Purchase Request
          A22             Request For Quotation / Quotation Inquire
          A23             Contracts / Agreements / Contract Awards / LOI
          A24             Pre-Qualification / Market Survey
          A25             Criticality Evaluation / Tendering/Bidding Evaluation/ Cost
                          Estimate
          A26             Tender Proposals
          A27             ITB
           B              DOCUMENT CONTROL
          B01             Supplier Document Schedule
          B02             Fabrication/Production Schedule
          B03             Progress Reports
          B04             Bought Out Item List
          B05             Table of Contents (All Manuals)
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 17 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
  Document Category                                    Description
         C                INTERFACE AND ARRANGEMENT DRAWINGS
        C01               General Arrangement Drawings
        C02               Acceptable Nozzle Loads
        C03               Interface and Connection Schedule
        C04               Foundation Loading Diagram and Support Details
        C05               Special
         D                DESIGN AND OPERATIONAL DATA
        D01               Piping and Instrument Diagrams (P&ID's)
        D02               One Line Electrical Diagrams
        D03               Schematic Diagrams
        D04               Utilities Schedule
        D05               Weight Data Sheets
        D06               Equipment Data Sheets
        D07               Noise Level Data Sheets
        D08               Schedule of Electrical Equipment in Hazardous Areas
        D09               Detailed Description of Operation
        D10               HVAC Ducting and Instrument Diagrams and flow Diagrams
        D11               Process Flow Diagrams, Heat and Mass Balance
        D12               Electrical Power Supplies Data Sheet
        D13               Enclosure Ventilation Requirements
        D14               Instrument Index
        D15               Instrument Data Sheets
        D16               Cause and Effect Charts
        D17               Instrument/Electrical Logic Diagram
        D18               VDU Screen Display Graphics (D2)
        D19               Block Wiring Schematic
         E                GENERAL DETAILS AND SUB ASSEMBLY DWGS
        E01               Cross Section Drawing/Exploded View Diagram With Parts List
        E02               Mechanical Seal Drawings
        E03               Shaft Alignment Drawings
        E04               Name Plate Format Drawings
        E05               Sub Assembly Arrangements
        E06               Detailed Fabrication Drawings
        E07               Miscellaneous Drawings
         F                INSTRUMENT/ELECTRICAL INTERCONNECTIONS &
                          DETAILSS
          F01             Electrical Connection Diagram
          F02             Instrument/Electrical Panel Detail Drawing
          F03             Termination Diagrams
          F04             Cable Schedule
          F05             Instrument Termination and Hook up Details
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 18 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
  Document Category                                     Description
        F06               Instrument Loop Diagrams
        F07               Instrument PLC Data Communication Protocol
         G                CALCULATIONS & PERFORMANCE DATA
        G01               Pressure Vessel/Tank Mechanical Calculations
        G02               Process/Utility Calculations
        G03               Structural Steel Calculations
        G04               Foundation Support Calculations
        G05               System Head Loss Calculations
        G06               Lateral Critical Speed Calculations
        G07               Torsional Critical Speed Calculations
        G08               Bearing Life Calculations
        G09               Thrust Bearing Sizing Calculations
        G10               Heat Emission Calculations
        G11               Acoustic Analysis for Reciprocating Compressors
        G12               Hydraulic Calculations
        G13               Exchanger Thermal Rating Calculations
        G14               Instrument Calculations
        G15               Enclosure Ventilation System Calculations
        G16               Exhaust Duct Calculations
        G17               Coupling Selection Calculations
        G18               Lube and Seal Oil System
        G19               Anti Surge Valve Sizing
        G20               Pulsation Damper Design Calculations
        G21               Rotor/Shaft System Unbalanced Response Analysis
        G22               Piping Stress Analysis
        G23               Crane Failure Mode Analysis
        G24               ESD Valve
        G25               Relief Valve and Bursting Disc Calculations
        G26               Electrical Protection Study
        G27               Current and Potential (CT/VT) Transformer Curves
        G28               Motor Performances Curves
        G29               Combustion Gas Turbine Performance Curves
        G30               Centrifugal Pump Performance Curves
        G31               Rotary Pump Curves
        G32               Centrifugal Compressor Performance Curves
        G33               Fan Performance Curves
        G34               Engine Performance Curves
        G35               General Performance Data
        G36               Speed/Torque Starting Curves
        G37               Reciprocating Pump Performance Curves
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 19 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
  Document Category                                     Description
        G38               Lighting Performance Data
        G39               Battery Charge/Discharge Calculations
        G40               Power System Analysis Data
        G41               Reliability/Availability Data and Calculations
        G42               Performance Guarantee
        G43               Short Circuit Calculations
        G44               Miscellaneous Calculations
         H                SHIPPING, HANDLING, INSTALLATION &
                          PRECOMMISSIONING
          H01             Erection & Installation Procedure
          H02             Unpacking and Preservation Procedure
          H03             Handling and Shipping Procedures
          H04             Pre-Commission/Commissioning Procedure
          H05             Erection Fasteners Summary List
          H06             Sling/Lifting Arrangement
           J              MANUFACTURING & QUALITY PROCEDURE
          J01             Quality Management System Certificate
          J02             Quality Plan
          J03             Inspection and Test Plan
          J04             Pressure Test Procedures
          J05             Performance Testing and Acceptance Test Procedures
          J06             Software Quality System
          J07             Weight Procedure
          J08             Health Safety & Environmental Management System
          J09             Health Safety & Environmental Plan (HS&E Plan)
          J10             Proposed Software Listing
           K              MAINTENANCE & SPARES DATA
          K01             Lube Oil and Operating Fluids Schedule
          K02             Recommended Start-up and Commissioning Spares List
          K03             Recommended Spares for Two Years Operation
           L              PERFORMANCE & DESIGN CERTIFICATION
          L01             Performance Test Report/Results
          L02             Factory Acceptance Test Report (FAT)
          L03             Vibration Report
          L04             Noise Reports
          L05             Weighing Report and Certificate
          L06             Dimensional Report
          L07             Fire Test Reports/Certificates
          L08             Equipment Hazardous Area Certificates
          L09             HAZID/Hazop Reports
          L10             Register of Safety Related Devices
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 20 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
  Document Category                                     Description
                          TEST & INSPECTION REPORTS
          M01             Material Test Certificate
          M02             Welder Performance Qualification Certificates
          M03             NDE Operator Qualifications
          M04             Production Test Results (Including Welding)
          M05             NDE Records
          M06             Heat Treatment Records
          M07             Material Traceability Records
          M08             Name Plate Rubbing/Photo's
          M09             Electrical Machinery Type Tests
          M10             Routine Test Certificate - Electrical Machinery
          M11             Measurement of Resistance
          M12             Painting/Insulation Inspection Report
          M13             Charpy Impact Test
                          RENEWABLE TEST & CALIBRATION DATA
          N01             Pressure Test Certificates
          N02             Instrument Test and Calibration Certificate
          N03             General Performance Data
          N04             Insulation Resistance Test
          N05             Vessel & Exchanger Code Data Reports
          N06             Certificate of Compliance
          N07             Release Notes
          N08             Independent Inspection Authority Release Note/Waivers
          N09             Concession Records (Deviation Decision Requests)
          N10             Material Safety Data Sheets
          N11             Certificate of Conformity
           Q              MATERIALS ENGINEERING DATA (SUPPLIER WELDED)
          Q01             Weld Procedure Specification (WPS) and Qualification (QPQ)
                          Records
          Q02             Non-Destructive Examination Procedures (NDE)
          Q03             Manufacturing Procedures Including Heat Treatment
          Q04             Surface Preparation and Painting Procedure
           R              MATERIALS CERTIFICATES (SITE WELDED)
          R01             Material Certificates - Bulk Items
          R02             Material Certificates - Package Welded Interfaces
           T               MANUALS
          T01             Despatch Dossier
          T02             Operating Manual
          T03             Maintenance Manual
          T04             Certification Data Book - (Operations)
          T05             Manufacturing Records - (Manufacturing Record Book)
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 21 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
  Document Category                                   Description
        T06               Material Certification Manual
APPENDIX – D: SYSTEM CODE
       System                                  System Description
        Code
          0               Wells/Pipelines
         S01              Wells – Thang Long
          S02             Wells – Dong Do
          S03             Flowlines - Thang Long (Well Stream)
          S04             Flowlines -Dong Do (Well Stream)
          S05             Pipelines - FPSO to Thang Long WHP Water Injection
          S06             Pipelines - FPSO to Dong Do WHP Water Injection
          S07             Pipeline - FPSO to Thang Long WHP Gas lift
          S08             Pipeline - Export gas
          S09             Pig Launcher/Receiver
           1              Hydrocarbon liquid system
          S10             Well Flow Metering
          S11             Well Fluid Heater
          S12             Production Separation
          S13             Crude oil treatment/analysis/measurement system
          S14             Crude oil storage system
          S15             Export pump/Crude oil offloading system
          S16             Condensate system
          S17             Oil recovery system
          S18             ESP
          S19             Spare
           2              Hydrocarbon gas system
          S20             Associated gas gathering system
          S21             Gas conditioning / Glycol system
          S22             Gas lift system
          S23             Export gas system
          S24             Fuel gas system
          S25             Gas metering
          S26             Process Relief System and Flare System
          S27             Spare
          S28             Spare
          S29             Spare
           3              Produced water/sand handling system
                          Produced Water treatment System/Hydrocylone, Contaminated/Oily
          S30
                          Water Treatment and Disposal system/OIW monitoring system
          S31             Water Injection
          S32             Sand monitoring and detection system
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 22 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
       System                                 System Description
        Code
          S33             Sand removal system, Sand cleaning and handling system
          S34             Spare
          S35             Spare
          S36             Spare
          S37             Spare
          S38             Spare
          S39             Spare
           4              Subsea, mooring, riser and turret system
          S40             Subsea equipment /Subsea SSIV/PLEM
          S41             Mooring system
          S42             Flexible hose and Riser system
          S43             Turret
          S44             FPSO marine system and other process support equipment
          S45             Spare
          S46             Spare
          S47             Spare
          S48             Spare
          S49             Spare
           5              Safety Systems
          S50             Safety equipment/Lifeboats/Escape and life survival system
                          Fire fighting system (Extinguishers/Firewater System/Sprinkler
          S51
                          Systems/Deluge Systems/Foam System
          S52             ESD
          S53             ICS and other control system
          S54             Fire & Gas Detection System
          S55             General Alarms/Public Address
          S56             Telecommunications
          S57             Emergency Lighting & Small Power/Navaids
          S58             Spare
          S59             Spare
           6              Utilities
          S60             Service/Potable Water
          S61             Instrument & Utility Air
          S62             Chilled Water
          S63             Inert Gas
          S64             Diesel
          S65             Helifuel
          S66             Chemical Injection
          S67             Seawater System
          S68             Heating Medium/Hot Oil
          S69             Drains - Hazardous (Closed)
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 23 of 24
                    DRAWING AND DOCUMENT NUMBERING PROCEDURE
       System                                 System Description
        Code
          7               Utilities
         S70              Drains - Hazardous (Open)
         S71              Drains – Non Hazardous (Open)
         S72              Sewage/Sanitary
         S73              Cooling Medium
         S74              Hydraulics
         S75              Material Handling and lifting system
         S76              Spare
         S77              Spare
         S78              Spare
         S79              Spare
          8               Power Utilities
         S80              Main Power Generation No 1
         S81              Main Power Generation No 2
         S82              HV Distribution
         S83              LV Main Power Distribution
         S84              DC Power Systems/UPS
         S85              Lighting & Small Power
         S86              Earthing System
         S87              Emergency Power
         S88              ESP electrical and control system
         S89              Spare
          9               Accommodation/Structure/Other
         S90              Accommodation/Offices HVAC
         S91              Accommodation/Offices/Buildings
         S92              Workshops/Labs
         S93              Topsides/Plant HVAC
         S94              Jacket Appurtenances
         S95              Area Completions
         S96              Spare
         S97              Spare
         S98              Spare
         S99              Internal DCS Numbering
Document No.: TLDD-0000-1AAG-A10-0001 Revision A5
Page No.: 24 of 24