0% found this document useful (0 votes)
54 views14 pages

System

This document contains a summary of items and quantities for an engineering project. It includes details on embankments, site preparation such as excavations and deductions, and electrical trenches. The embankments section lists the location, dimensions, and quantities of material for different embankments. The site preparation section provides information on the areas and quantities deducted for various building features and infrastructure. Finally, the electrical trenches section specifies trench dimensions and burial method.

Uploaded by

saif ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views14 pages

System

This document contains a summary of items and quantities for an engineering project. It includes details on embankments, site preparation such as excavations and deductions, and electrical trenches. The embankments section lists the location, dimensions, and quantities of material for different embankments. The site preparation section provides information on the areas and quantities deducted for various building features and infrastructure. Finally, the electrical trenches section specifies trench dimensions and burial method.

Uploaded by

saif ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Width Height/

Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)

1.5.1 Embankments - 1 Sq.M.

1.5.2 Embankments - 2 Road Ramp for Dyke Cu.M 1 13 10 2 260 Flat portion at the Dyke top
1.5.2 Embankments - 2 Road Ramp for Dyke Cu.M 1 29 8 2 232 Sloping Portion only

1.5.2 Embankments - 2 Road Ramp for Culvert-1 Cu.M 1 29 20 3 1740 Flat portion at the Dyke top

1.5.2 Embankments - 2 Road Ramp for Culvert-1 Cu.M 1.5 31.5 14.5 3 1027.7 Sloping Portion only

1.5.2 Embankments - 2 Road Ramp for Culvert-2 Cu.M 1.5 12 14 3 378.0 Sloping Portion only

3637.7

2.1 Site Preparation Plot Boundary J55 Sq.M. 1 303 432 130896
2.1 Site Preparation Dedn for Road type-1 J55 Sq.M. -1 489 12 -5868
2.1 Site Preparation Dedn for Road type-2 J55 Sq.M. -1 1612 6 -9672
2.1 Site Preparation Dedn for SWD J55 Sq.M. -1 3295 1.5 -4942.5
2.1 Site Preparation Dedn for U-304 J55 Sq.M. -1 97.3 97.5 -9486.75
2.1 Site Preparation Dedn for U-302 J55 Sq.M. -1 14 11 -154
2.1 Site Preparation Dedn for U-204 J55 Sq.M. -1 30.2 30.2 -912.04
2.1 Site Preparation Dedn for D-501A/B J55 Sq.M. -1 22.3 13.3 -296.59
2.1 Site Preparation Dedn for G-504A/B J55 Sq.M. -1 11 10 -110
2.1 Site Preparation Dedn for D-502A/B J55 Sq.M. -1 19.5 10 -195
2.1 Site Preparation Dedn for G-503A/B J55 Sq.M. -1 11.3 10.3 -116.39
2.1 Site Preparation Dedn for U-501 J55 Sq.M. -1 40 20 -800
2.1 Site Preparation Dedn for U-502 J55 Sq.M. -1 11 11 -121
2.1 Site Preparation Dedn for U-205 J55 Sq.M. -1 10.3 20.3 -209.09
2.1 Site Preparation Dedn for U-205/206 J55 Sq.M. -1 10.3 28.3 -291.49
2.1 Site Preparation Dedn for U-101 J55 Sq.M. -1 20.3 20.3 -412.09
2.1 Site Preparation Dedn for D-101 J55 Sq.M. -1 24.3 24.3 -590.49
2.1 Site Preparation Dedn for G-206A/B J55 Sq.M. -1 13.3 10.3 -136.99
2.1 Site Preparation Dedn for U-203 J55 Sq.M. -1 19.5 10.3 -200.85
2.1 Site Preparation Dedn for G-204A/B J55 Sq.M. -1 16.1 10.3 -165.83
2.1 Site Preparation Dedn for U-202 J55 Sq.M. -1 20.3 15.3 -310.59
2.1 Site Preparation Dedn for G-203A/B J55 Sq.M. -1 15.9 10 -159
2.1 Site Preparation Dedn for D-503 J55 Sq.M. -1 10 10 -100
Dedn for
2.1 Site Preparation G-205A/B,207A/B,E- J55 Sq.M. -1 40.7 10.3 -419.21
201,D-203
Dedn for
2.1 Site Preparation G-205A/B,207A/B,E- J55 Sq.M. -1 9.3 6.15 -57.195
201,D-203
2.1 Site Preparation Dedn for U-301 J55 Sq.M. -1 49.7 106 -5268.2
2.1 Site Preparation Dedn for U-201 J55 Sq.M. -1 44.7 24 -1072.8

2.1 Site Preparation Dedn for D-201,202,204 J55 Sq.M. -1 161.1 65.6 -10568.16

2.1 Site Preparation Dedn for Sub-55 J55 Sq.M. -1 15 30 -450


2.1 Site Preparation Dedn for Sub-55 J55 Sq.M. -1 16 29 -464
2.1 Site Preparation Dedn for PIB-55 J55 Sq.M. -1 25 25 -625
2.1 Site Preparation Dedn for Parking Area J55 Sq.M. -1 18 25 -450
2.1 Site Preparation Dedn for Culvert Area J55 Sq.M. -1 19 20 -380
2.1 Site Preparation Dedn for Culvert Area J55 Sq.M. -1 16 14.5 -232
2.1 Site Preparation Dedn for Foundations J55 Sq.M. -1 0
76270.745

2.1.3 Gatch Sq.M.

2.6.1.1.1 Electrical Trench-300W X 1200D Directly Buried M


2.6.1.1.2 Electrical Trench-400W X 1000D Directly Buried M
2.6.1.1.3 Electrical Trench-500W X 1000D Directly Buried M
2.6.1.1.4 Electrical Trench-600W X 1000D Directly Buried M
2.6.1.1.5 Electrical Trench-700W X 1000D Directly Buried M
2.6.1.1.6 Electrical Trench-800W X 1000D Directly Buried M
2.6.1.1.7 Electrical Trench-900W X 1000D Directly Buried M
2.6.1.1.8 Electrical Trench-1000W X 1200D Directly Buried M
2.6.1.1.9 Electrical Trench-1100W X 1000D Directly Buried M
2.6.1.1.10 Electrical Trench-1500W X 1400D Directly Buried M
2.6.1.1.11 Electrical Trench-400W X 1200D Directly Buried M
2.6.1.1.12 Electrical Trench-2500W X 1400D Directly Buried M
2.6.1.1.13 Electrical Trench-600W X 1200D Directly Buried M
2.6.1.1.14 Electrical Trench-3000W X 1400D Directly Buried M
2.6.1.1.15 Electrical Trench-5000W X 1400D Directly Buried M

2.6.1.2.1 Instrunent Trench-300W X 750D Directly Buried M


2.6.1.2.2 Instrunent Trench-400W X 750D Directly Buried M
2.6.1.2.3 Instrunent Trench-500W X 750D Directly Buried M
2.6.1.2.4 Instrunent Trench-600W X 750D Directly Buried M
2.6.1.2.5 Instrunent Trench-1000W X 750D Directly Buried M

2.6.1.3.1 Telecom buried trenches -300W x 700D Directly Buried M

2.6.2.1.1 Electrical Concrete Trench -400W X 1000D M

2.6.2.1.2 Electrical Concrete Trench -500W X 1000D M

2.6.2.1.3 Electrical Concrete Trench -600W X 1000D M

2.6.2.1.4 Electrical Concrete Trench -700W X 1000D M

2.6.2.1.5 Electrical Concrete Trench -800W X 1000D M

2.6.2.1.6 Electrical Concrete Trench -900W X 1000D M

2.6.2.1.7 Electrical Concrete Trench -1000W X 1000D M

2.6.2.1.8 Electrical Concrete Trench -1100W X 1000D M

2.6.2.1.9 Electrical Concrete Trench -1200W X 1000D M

616234002.xlsx Old UG Back-up 1 of 14


Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)

2.6.2.1.10 Electrical Concrete Trench -1300W X 1000D M

2.6.2.1.11 Electrical Concrete Trench -1400W X 1000D M

2.6.2.1.12 Electrical Concrete Trench -1500W X 1000D M

2.6.2.2.1 Instrunent concrete Trench 300W X 750D M

2.6.2.2.2 Instrunent concrete Trench 400W X 750D M

2.6.2.2.3 Instrunent concrete Trench 500W X 750D M

2.6.2.2.4 Instrunent concrete Trench 600W X 750D M

2.6.2.5.1 Piping Trench- 800W x 1500D M


2.6.2.5.2 Piping Trench- 800W x 2000D M
2.6.2.5.3 Piping Trench- 1000W x 1000D M

Trench for SWD-Road


2.6.2.7 Trench for SWD-Road crossing crossing J55 M 200.7

2.7.1.2 Pipe Crossing -10 Inch Pipe

2.7.2.1 100 Dia Pipe M


2.7.2.2 150 Dia Pipe M
2.7.2.3 200 Dia Pipe M

2.8.1.1 200 Dia OWS M 239


2.8.1.2 300 Dia OWS M 288
2.8.1.3 350 Dia OWS M 778

2.8.3.1 2 Inch Pipe FW M


2.8.3.2 3 Inch Pipe FW M
2.8.3.3 4 Inch Pipe FW M
2.8.3.4 6 Inch Pipe FW M
2.8.3.5 8 Inch Pipe FW M
10 Inch Pipe FW M
2.8.3.7 12 Inch Pipe FW M

2.8.3.1 2 Inch Pipe CD M


2.8.3.2 8 Inch Pipe CD M

5.1.1 Electrical Duct Bank- 1300W X 700D X 11000L Nos

5.1.2 Electrical Duct Bank- 1500W X 1000D X 11000L Nos

5.1.3 Electrical Duct Bank- 900W X 600D X 13000L Nos

5.1.4 Electrical Duct Bank- 900W X 800D X 13000L Nos

5.1.5 Electrical Duct Bank- 1100W X 800D X 13000L Nos

5.1.6 Electrical Duct Bank- 1300W X 700D X 11000L Nos

5.1.7 Electrical Duct Bank- 1300W X 800D X 13000L Nos

5.2.1 Instrument Duct Bank- 550W X 350D X 13000L Nos

5.2.2 Instrument Duct Bank- 1000W X 1000D X 13000L Nos

5.3 Telecom Duct Bank- 550W X 350D X 13000L Nos

6.1.1.1 Heavy Duty Paving - 200 Thk For G-504A/B J55 Sq.M. 1 11 10 110
6.1.1.1 Heavy Duty Paving - 200 Thk For G-503A/B J55 Sq.M. 1 11.3 10.3 116.39
6.1.1.1 Heavy Duty Paving - 200 Thk For G-206A/B J55 Sq.M. 1 13.3 10.3 136.99
6.1.1.1 Heavy Duty Paving - 200 Thk Ffor G-204A/B J55 Sq.M. 1 16.1 10.3 165.83
6.1.1.1 Heavy Duty Paving - 200 Thk For G-203A/B J55 Sq.M. 1 15.9 10 159

6.1.1.1 Heavy Duty Paving - 200 Thk For G-205A/B,207A/B,E- J55 1 40.7 10.3 419.21
201,D-203 Sq.M.

For G-205A/B,207A/B,E-
6.1.1.1 Heavy Duty Paving - 200 Thk 201,D-203 J55 Sq.M. 1 9.3 6.15 57.195

6.1.1.2 Heavy Duty Paving - 150 Thk For U-204 J55 Sq.M. 1 30.2 30.2 912.04
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for D-501A/B J55 Sq.M. 1 22.3 13.3 296.59
Heavy Duty Paving - 150 Thk Dedn for tank J55 3.14 -2 5.6 -49.2
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for D-502A/B J55 Sq.M. 1 19.5 10 195
Heavy Duty Paving - 150 Thk Dedn for tanks J55 3.14 -2 6.6 -68.4
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-501 J55 Sq.M. 1 40 20 800
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-502 J55 Sq.M. 1 11 11 121
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-205 J55 Sq.M. 1 10.3 20.3 209.09
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-205/206 J55 Sq.M. 1 10.3 28.3 291.49
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-101 J55 Sq.M. 1 20.3 20.3 412.09
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for D-101 J55 Sq.M. 1 24.3 24.3 590.49
Heavy Duty Paving - 150 Thk Dedn for tank J55 3.14 -1 9.6 -72.3
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-203 J55 Sq.M. 1 19.5 10.3 200.85
6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for U-202 J55 Sq.M. 1 20.3 15.3 310.59

6.1.1.2 Heavy Duty Paving - 150 Thk Dedn for D-201,202,204 J55 Sq.M. 1 161.1 65.6 10568.16

Heavy Duty Paving - 150 Thk Dedn for tanks J55 3.14 -3 37 -3224

6.2.1 Light Duty Paving Sq.M. 1


6.3.1 Light Duty Concrete Walkway Sq.M. 1
616234002.xlsx Old UG Back-up 2 of 14
Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)

7.1 Gravel Filling Sq.M.

7.4 Asphalt paving -

9.2 Insert Plate MT

9.3.1 Anchor fastener -M12 - 110 MT

9.4.1 Pipe sleeve - 150mm dia M


9.4.2 Pipe sleeve - 200mm dia M

7.3.1 Plant Road Type 1- 8m Road pipe track/ service J55 489 489
corridor M

7.3.2 Plant Road Type 2- 6m Road M 211 211


7.3.2 Plant Road Type 2- 6m Road U-204 J55 M 655 655
7.3.2 Plant Road Type 2- 6m Road U-501 J55 M 86 86
7.3.2 Plant Road Type 2- 6m Road U-205,206,101 J55 M 309 309
7.3.2 Plant Road Type 2- 6m Road U-205,202,203 J55 M 56 56
7.3.2 Plant Road Type 2- 6m Road SUB, PIB, Parking J55 M 295 295
1612

7.3.3 Plant Road Type 3- 3.8m Road M

12.3.2 Gatch Parking Sq.M.


Parking Sq.M. 1 25 18 450

13.1.4 OWS Manholes Nos 25


13.1.4a Clean out pit - 1.2m x 1.2m x 1.2m deep Nos 14
13.1.2 Sump for Storm water Drain Nos 4

13.1.3.1 Inspection Pit Nos


20.2.6 Septic Tank Nos

13.2.1 Storm Water Drain-1 pipe track/ service J55 824 824
corridor M
13.2.1 Storm Water Drain-1 Off-spec storage pond J55 M 390 390
13.2.1 Storm Water Drain-1 U-204 J55 M 1033 1033
13.2.1 Storm Water Drain-1 U-501 J55 M 118 118
13.2.1 Storm Water Drain-1 U-205,206,101 J55 M 499 499
13.2.1 Storm Water Drain-1 U-205,202,203 J55 M 87 87
13.2.1 Storm Water Drain-1 SUB, PIB, Parking J55 M 344 344
3295

13.2.2 Storm Water Drain - 2 Inside Dyke J55 M 385 385


13.2.3 Storm Water Drain - 3 M
13.2.4 Storm Water Drain - 4 M

14.1.1 Catch pits Nos 33

14.2.1 RC Culvert 1 Nos 1 19 20 3 1


14.2.2 RC Culvert 2 Nos 1 16 14.5 3 1

15.1.1.1 Valve pit of size 1.5m W X 1.5m L X 1.2m D For Fire Water Nos 1

15.1.1.2 Valve pit of size 2m W X 2m L X 1.2m D For Fire Water Nos

15.1.2 Roding Pit Nos

15.1.3 Flange Pit Nos

15.1.4 Valve pit of size 1.5m W X 2m L X 1.2m D for OWS For OWS Nos 4

15.1.5 Telecom pit with cover - 750 W x 1400 L x 1100 D Nos

16.1.1 Fence @ 3000c/c M

16.2.1.1 Gates - Emergency Gates- 6.3m 2 posts for each gate Nos
16.2.1.2 Gates - Emergency Gates- 8.3m 2 posts for each gate Nos
16.1.2 Gates - Boom Gates 2 posts for each gate Nos

16.3.1.1 Gates - Man access-1.4m 2 posts for each gate Nos

16.4 Crash Barriers Post @ every 1.5m M

16.5 Pipe Bollards Pre-cast Nos

20.2.5 Trap Degrase - 1000mm x 1000mm x 1000mm Pre-cast Nos

20.2.7.2 Earth Pit Nos


Precast Concrete block - Electrical- 300 x 300x 500
20.2.7.3 deep Pre-cast Nos

20.2.8.1 Precast Block - Instrumentation Pre-cast Nos

2.6.1.3.1 Telecom buried trenches -800W x 800D Directly Buried

6.4 Curb stones U-204 J55 M 1 120 120


6.4 Curb stones D-501A/B J55 M 1 71.2 71.2
6.4 Curb stones G-504A/B J55 M 1 26 26
616234002.xlsx Old UG Back-up 3 of 14
Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)
6.4 Curb stones D-502A/B J55 M 1 59 59
6.4 Curb stones Dedn for G-503A/B J55 M 1 37.2 37.2
6.4 Curb stones Dedn for U-501 J55 M 1 120 120
6.4 Curb stones Dedn for U-502 J55 M 1 44 44
6.4 Curb stones Dedn for U-205 J55 M 1 61.2 61.2
6.4 Curb stones Dedn for U-205/206 J55 M 1 87.5 87.5
6.4 Curb stones Dedn for U-101 J55 M 1 81.2 81.2
6.4 Curb stones Dedn for D-101 J55 M 1 97.2 97.2
6.4 Curb stones Dedn for G-206A/B J55 M 1 47.2 47.2
6.4 Curb stones Dedn for U-203 J55 M 1 47.6 47.6
6.4 Curb stones Dedn for G-204A/B J55 M 1 52.8 52.8
6.4 Curb stones Dedn for U-202 J55 M 1 71.2 71.2
6.4 Curb stones Dedn for G-203A/B J55 M 1 45.8 45.8
Dedn for
6.4 Curb stones G-205A/B,207A/B,E- J55 M 1 102 102
201,D-203
Dedn for
6.4 Curb stones G-205A/B,207A/B,E- J55 M 1 12.3 12.3
201,D-203

20.2.2 1.2 m height T- wall M

6.1.1.1 Grade Slab Sq.M.

6.1.1.3 RC Ramp Cu.M.

22.1.1 CP Transformer Rectifier; 200mm above GL. Nos


CP Junction Box/distribution / bond box 50mm
22.1.2 above GL. Nos
22.1.3 Test station ; 50mm above GL. Nos

22.2 Buried trench for Anode installation m


Trench - 500mm x 1500mm

22.3 Buried trench for Cable Laying m


Trench - 500mm x 700mm

22.4 Anode bed Borewell Nos

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-002 J60-3 M 3 55 8 2 165

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-002 J60-3 M 2 93 8 2 186

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-003 J60-3 M 2 60 8 2 120

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-003 J60-3 M 2 55 8 2 110

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-003 J60-3 M 1 72 8 2 72

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-005 J60-3 M 4 40 8 2 160

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-005 J60-3 M 1 65 8 2 65

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-006 J60-3 M 4 70 8 2 280

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-006 J60-3 M 1 60 8 2 60

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-006 J60-2 M 6 35 8 2 210

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-007 J60-3 M 3 60 8 2 180

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-007 J60-3 M 2 55 8 2 110

20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-008 J60-5 M 4 96 6 2 384

20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-008 J60-5 M 2 95 6 2 190

20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-009 J60-5 M 3 95 6 2 285

20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-009 J60-5 M 1 55 6 2 55

20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-010 J60-5 M 2 90 6 2 180

20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-010 J60-5 M 1 55 6 2 55

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-011 J60-2 M 1 60 8 2 60

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-011 J60-2 M 2 55 8 2 110

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-012 J60-2 M 1 60 8 2 60

616234002.xlsx Old UG Back-up 4 of 14


Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-013 J60-2 M 1 95 8 2 95

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-013 J60-2 M 1 55 8 2 55

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-013 J60-2 M 1 52 8 2 52

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-014 J60-2 M 1 55 8 2 55

20.4.2 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-014 J60-2 M 1 100 8 2 100

20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-016 J60-5 M 4 33 6 2 132

20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-016 J60-5 M 2 45 6 2 90

20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-016 J60-5 M 2 90 6 2 180

20.4.1 Tankage area access Ramp - over Dyke wall J60-S-VA-541686-016 J60-5 M 2 65 6 2 130

2.1 Site Preparation J60-S-VA-541686-002 J60-3 Sq.M. 1 830 250 207500


2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 744 206 -153264
2.1 Site Preparation Pump paving area J60-3 Sq.M. -1 78 19 -1482
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -1 830 12 -9960
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -1.5 250 12 -4500
2.1 Site Preparation storm water drain J60-3 Sq.M. -1 1361 2.5 -3402.5

2.1 Site Preparation J60-S-VA-541686-003 J60-3 Sq.M. 1 619 391 242029


2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 342 206 -70452
2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 262 266 -69692
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -2 619 6 -7428
2.1 Site Preparation Pump paving area J60-3 Sq.M. -1 57 12 -684
2.1 Site Preparation Pump paving area J60-3 Sq.M. -1 39 8 -312
2.1 Site Preparation storm water drain J60-3 Sq.M. -1 2265 2.5 -5662.5
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -1 766 12 -9192
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -1 383 6 -2298
2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 211 70 -14770

2.1 Site Preparation J60-S-VA-541686-004 J60-3 Sq.M. 1 465 264 122760


2.1 Site Preparation storm water drain J60-3 Sq.M. -1 949 2.5 -2372.5
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -1 528 6 -3168
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -1 465 6 -2790

2.1 Site Preparation J60-S-VA-541686-005 J60-3 Sq.M. 1 316 264 83424


2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 183 71 -12993
2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 202 61 -12322
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -1 316 6 -1896
2.1 Site Preparation Pump paving area J60-3 Sq.M. -1 52 9 -468
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -2 264 6 -3168
2.1 Site Preparation storm water drain J60-3 Sq.M. -1 940 2.5 -2350
2.1 Site Preparation Pump paving area J60-3 Sq.M. -1 30 11 -330

2.1 Site Preparation J60-S-VA-541686-006 J60-3 Sq.M. 1 355 322 114310


2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 239 120 -28680
2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 159 65 -10335
2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 40 80 -3200
2.1 Site Preparation Pump paving area J60-3 Sq.M. -1 49 10 -490
2.1 Site Preparation Pump paving area J60-3 Sq.M. -1 76 9 -684
2.1 Site Preparation storm water drain J60-3 Sq.M. -1 2455 2.5 -6137.5
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -2 322 6 -3864
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -2 322 12 -7728
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -2 287 12 -6888
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -1 287 6 -1722

2.1 Site Preparation J60-S-VA-541686-006 J60-2 Sq.M. 1 355 168 59640


2.1 Site Preparation Dedn for Dyke area J60-2 Sq.M. -1 100 90 -9000
2.1 Site Preparation Dedn for Dyke area J60-2 Sq.M. -1 60 50 -3000
2.1 Site Preparation Dedn for Dyke area J60-2 Sq.M. -1 55 30 -1650
2.1 Site Preparation Pump paving area J60-2 Sq.M. -1 84 19 -1596
2.1 Site Preparation Pump paving area J60-2 Sq.M. -1 66 10 -660
2.1 Site Preparation storm water drain J60-2 Sq.M. -1 2.5 0
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -2 168 6 -2016
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -2 168 12 -4032
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -1 36 12 -432
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -2 287 12 -6888
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -1 146 12 -1752

2.1 Site Preparation J60-S-VA-541686-007 J60-3 Sq.M. 1 476 320 152320


2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 166 272 -45152
2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 151 85 -12835
2.1 Site Preparation Dedn for Dyke area J60-3 Sq.M. -1 266 216 -57456
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -2 476 6 -5712
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -1 476 12 -5712
2.1 Site Preparation Pump paving area J60-3 Sq.M. -1 72 11 -792
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -2 320 6 -3840
2.1 Site Preparation Dedn for Road J60-3 Sq.M. -1 320 12 -3840
2.1 Site Preparation storm water drain J60-3 Sq.M. -1 2327 2.5 -5817.5
2.1 Site Preparation Pump paving area J60-3 Sq.M. -1 65 10 -650

2.1 Site Preparation J60-S-VA-541686-008 J60-5 Sq.M. 1 534 502 268068


2.1 Site Preparation Dedn for Dyke area J60-5 Sq.M. -2 475 207 -196650
2.1 Site Preparation storm water drain J60-5 Sq.M. -1 4193 2.5 -10482.5
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -2 540 6 -6480
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 37 12 -444

616234002.xlsx Old UG Back-up 5 of 14


Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)
2.1 Site Preparation Pump paving area J60-5 Sq.M. -1 90 13 -1170
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -2 502 6 -6024
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 502 12 -6024
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -2 511 12 -12264

2.1 Site Preparation J60-S-VA-541686-009 J60-5 Sq.M. 1 713 435 310155


2.1 Site Preparation Dedn for Dyke area J60-5 Sq.M. -2 409 259 -211862
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -2 435 12 -10440
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 435 6 -2610
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 713 6 -4278
2.1 Site Preparation Pump paving area J60-5 Sq.M. -1 61 13 -793
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 216 6 -1296
2.1 Site Preparation storm water drain J60-5 Sq.M. -1 2353 2.5 -5882.5

2.1 Site Preparation J60-S-VA-541686-010 J60-5 Sq.M. 1 413 391 161483


2.1 Site Preparation J60-5 Sq.M. 1 322 242 77924
2.1 Site Preparation Dedn for Dyke area J60-5 Sq.M. -1 407 258 -105006
2.1 Site Preparation Dedn for Dyke area J60-5 Sq.M. -1 258 202 -52116
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 242 6 -1452
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 242 12 -2904
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 413 12 -4956
2.1 Site Preparation storm water drain J60-5 Sq.M. -1 1080 2.5 -2700

2.1 Site Preparation J60-S-VA-541686-011 J60-2 Sq.M. 1 568 200 113600


2.1 Site Preparation Additional J60-2 Sq.M. 1 75 51 3825
2.1 Site Preparation Dedn for Dyke area J60-2 Sq.M. -1 545 144 -78480
2.1 Site Preparation Pump paving area J60-2 Sq.M. -1 54 10 -540
2.1 Site Preparation storm water drain J60-2 Sq.M. -1 1209 2.5 -3022.5
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -2 568 6 -6816
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -1 200 6 -1200
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -1.5 75 12 -1350

2.1 Site Preparation J60-S-VA-541686-012 J60-2 Sq.M. 1 294 200 58800


2.1 Site Preparation Dedn for Dyke area J60-2 Sq.M. -1 270 135 -36450
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -2 294 6 -3528
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -1 200 6 -1200
2.1 Site Preparation storm water drain J60-2 Sq.M. -1 733 2.5 -1832.5

2.1 Site Preparation J60-S-VA-541686-013 J60-2 Sq.M. 1 480 358 171840


2.1 Site Preparation Dedn for Dyke area J60-2 Sq.M. -1 411 328 -134808
2.1 Site Preparation Pump paving area J60-2 Sq.M. -1 28 10 -280
2.1 Site Preparation storm water drain J60-2 Sq.M. -1 701 2.5 -1752.5
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -1 429 6 -2574
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -2 358 12 -8592

2.1 Site Preparation J60-S-VA-541686-014 J60-2 Sq.M. 1 433 358 155014


2.1 Site Preparation Dedn for Dyke area J60-2 Sq.M. -1 411 328 -134808
2.1 Site Preparation Pump paving area J60-2 Sq.M. -1 29 10 -290
2.1 Site Preparation storm water drain J60-2 Sq.M. -1 709 2.5 -1772.5
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -1 433 6 -2598
2.1 Site Preparation Dedn for Road J60-2 Sq.M. -1 358 6 -2148
0
2.1 Site Preparation J60-S-VA-541686-015 J60-4 Sq.M. 1 566 380 215080
2.1 Site Preparation Dedn for Dyke area J60-4 Sq.M. -4 52 52 -10816
2.1 Site Preparation Dedn for Dyke area J60-4 Sq.M. -4 56 50 -11200
2.1 Site Preparation Dedn for Dyke area J60-4 Sq.M. -4 56 56 -12544
2.1 Site Preparation Pump paving area J60-4 Sq.M. -1 74 10 -740
2.1 Site Preparation Pump paving area J60-4 Sq.M. -1 25 10 -250
2.1 Site Preparation Pump paving area J60-4 Sq.M. -1 60 10 -600
2.1 Site Preparation Dedn for Road J60-4 Sq.M. -1 380 12 -4560
2.1 Site Preparation Dedn for Road J60-4 Sq.M. -2 380 6 -4560
2.1 Site Preparation Dedn for Road J60-4 Sq.M. -1 566 6 -3396
2.1 Site Preparation Dedn for Road J60-4 Sq.M. -2 566 12 -13584
2.1 Site Preparation storm water drain J60-4 Sq.M. -1 3872 2.5 -9680

2.1 Site Preparation J60-S-VA-541686-016 J60-5 Sq.M. 1 667 199 132733


2.1 Site Preparation Dedn for Dyke area J60-5 Sq.M. -2 225 50 -22500
2.1 Site Preparation Dedn for Dyke area J60-5 Sq.M. -1 230 150 -34500
2.1 Site Preparation Dedn for Dyke area J60-5 Sq.M. -1 109 102 -11118
2.1 Site Preparation Pump paving area J60-5 Sq.M. -1 30 12 -360
2.1 Site Preparation Pump paving area J60-5 Sq.M. -1 33 12 -396
2.1 Site Preparation Pump paving area J60-5 Sq.M. -1 27 12 -324
2.1 Site Preparation Pump paving area J60-5 Sq.M. -1 27 12 -324
2.1 Site Preparation storm water drain J60-5 Sq.M. -1 1803 2.5 -4507.5
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 667 6 -4002
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 199 6 -1194
2.1 Site Preparation Dedn for Road J60-5 Sq.M. -1 270 12 -3240
Dedn for Road J60-5 Sq.M. -2 199 12 -4776
783940

2.1.3 Gatch Sq.M.

2.6.1.1.1 Electrical Trench-300W X 1200D Directly Buried M


2.6.1.1.2 Electrical Trench-400W X 1000D Directly Buried M
2.6.1.1.3 Electrical Trench-500W X 1000D Directly Buried M
2.6.1.1.4 Electrical Trench-600W X 1000D Directly Buried M
2.6.1.1.5 Electrical Trench-700W X 1000D Directly Buried M
2.6.1.1.6 Electrical Trench-800W X 1000D Directly Buried M
2.6.1.1.7 Electrical Trench-900W X 1000D Directly Buried M

616234002.xlsx Old UG Back-up 6 of 14


Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)
2.6.1.1.8 Electrical Trench-1000W X 1200D Directly Buried M
2.6.1.1.9 Electrical Trench-1100W X 1000D Directly Buried M
2.6.1.1.10 Electrical Trench-1500W X 1400D Directly Buried M
2.6.1.1.11 Electrical Trench-400W X 1200D Directly Buried M
2.6.1.1.12 Electrical Trench-2500W X 1400D Directly Buried M
2.6.1.1.13 Electrical Trench-600W X 1200D Directly Buried M
2.6.1.1.14 Electrical Trench-3000W X 1400D Directly Buried M
2.6.1.1.15 Electrical Trench-5000W X 1400D Directly Buried M

2.6.1.2.1 Instrunent Trench-300W X 750D Directly Buried M


2.6.1.2.2 Instrunent Trench-400W X 750D Directly Buried M
2.6.1.2.3 Instrunent Trench-500W X 750D Directly Buried M
2.6.1.2.4 Instrunent Trench-600W X 750D Directly Buried M
2.6.1.2.5 Instrunent Trench-1000W X 750D Directly Buried M

2.6.1.3.1 Telecom buried trenches -300W x 700D Directly Buried M

2.6.2.1.1 Electrical Concrete Trench -400W X 1000D M

2.6.2.1.2 Electrical Concrete Trench -500W X 1000D M

2.6.2.1.3 Electrical Concrete Trench -600W X 1000D M

2.6.2.1.4 Electrical Concrete Trench -700W X 1000D M

2.6.2.1.5 Electrical Concrete Trench -800W X 1000D M

2.6.2.1.6 Electrical Concrete Trench -900W X 1000D M

2.6.2.1.7 Electrical Concrete Trench -1000W X 1000D M

2.6.2.1.8 Electrical Concrete Trench -1100W X 1000D M

2.6.2.1.9 Electrical Concrete Trench -1200W X 1000D M

2.6.2.1.10 Electrical Concrete Trench -1300W X 1000D M

2.6.2.1.11 Electrical Concrete Trench -1400W X 1000D M

2.6.2.1.12 Electrical Concrete Trench -1500W X 1000D M

2.6.2.2.1 Instrunent concrete Trench 300W X 750D M

2.6.2.2.2 Instrunent concrete Trench 400W X 750D M

2.6.2.2.3 Instrunent concrete Trench 500W X 750D M

2.6.2.2.4 Instrunent concrete Trench 600W X 750D M

2.6.2.5.1 Piping Trench- 800W x 1500D M


2.6.2.5.2 Piping Trench- 800W x 2000D M
2.6.2.5.3 Piping Trench- 1000W x 1000D M

Trench for SWD-Road


2.6.2.7 Trench for SWD-Road crossing crossing M

2.7.1.2 Pipe Crossing -10 Inch Pipe

2.7.2.1 100 Dia Pipe M


2.7.2.2 150 Dia Pipe M
2.7.2.3 200 Dia Pipe M

2.8.1.1 200 Dia OWS M


2.8.1.2 300 Dia OWS M
2.8.1.3 450 Dia OWS M

2.8.3.1 2 Inch Pipe FW M


2.8.3.2 3 Inch Pipe FW M
2.8.3.3 4 Inch Pipe FW M
2.8.3.4 6 Inch Pipe FW M
2.8.3.5 8 Inch Pipe FW M

10 Inch Pipe FW M

2.8.3.7 12 Inch Pipe FW M

2.8.3.1 2 Inch Pipe CD M

2.8.3.2 8 Inch Pipe CD M

5.1.1 Electrical Duct Bank- 1300W X 700D X 11000L Nos

5.1.2 Electrical Duct Bank- 1500W X 1000D X 11000L Nos

5.1.3 Electrical Duct Bank- 900W X 600D X 13000L Nos

616234002.xlsx Old UG Back-up 7 of 14


Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)

5.1.4 Electrical Duct Bank- 900W X 800D X 13000L Nos

5.1.5 Electrical Duct Bank- 1100W X 800D X 13000L Nos

5.1.6 Electrical Duct Bank- 1300W X 700D X 11000L Nos

5.1.7 Electrical Duct Bank- 1300W X 800D X 13000L Nos

5.2.1 Instrument Duct Bank- 550W X 350D X 13000L Nos

5.2.2 Instrument Duct Bank- 1000W X 1000D X 13000L Nos

5.3 Telecom Duct Bank- 550W X 350D X 13000L Nos

6.1.1.3 Heavy Duty Paving - 200 Thk


6.1.1.2 Heavy Duty Paving - 150 Thk

20.3 Tankage area paving (within Bund/Dyke wall)

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-002 J60-3 Sq.M. 1 744 206 153264

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -4 65 -13267

20.3.1 200mm thick approved clean sand cushion J60-3

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-003 J60-3 Sq.M. 1 342 206 70452

20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 262 266 69692

20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 211 70 14770

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -4 62 -12070

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -3 35 -2885

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-005 J60-3 Sq.M. 1 183 71 12993

20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 202 61 12322

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -3 9 -190.755

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -2 24 -904.32

20.3.1

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-006 J60-3 Sq.M. 1 239 120 28680

20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 159 65 10335

20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 80 40 3200

20.3.1 200mm thick approved clean sand cushion Dyke area J60-2 Sq.M. 1 100 90 9000

20.3.1 200mm thick approved clean sand cushion Dyke area J60-2 Sq.M. 1 60 50 3000

20.3.1 200mm thick approved clean sand cushion Dyke area J60-2 Sq.M. 1 50 30 1500

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -3 37 -3223.995

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -1 27 -572.265

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -4 20 -1256

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -2 14 -307.72

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -2 15 -353.25

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -2 8 -100.48

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -4 14 -615.44

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-007 J60-3 Sq.M. 1 272 166 45152

20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 151 85 12835

20.3.1 200mm thick approved clean sand cushion Dyke area J60-3 Sq.M. 1 266 216 57456

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -3 42 -4154.22

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -2 30 -1413

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -1 35 -961.625

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-3 Sq.M. -1 61 -2920.985

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-008 J60-5 Sq.M. 2 475 207 196650

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -4 73 -16733.06

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-009 J60-5 Sq.M. 2 409 259 211862

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -4 75 -17662.5

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-010 J60-5 Sq.M. 1 407 258 105006

20.3.1 200mm thick approved clean sand cushion Dyke area J60-5 Sq.M. 1 202 258

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -3 75 -13246.875

616234002.xlsx Old UG Back-up 8 of 14


Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-011 J60-2 Sq.M. 1 545 144 78480

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -2 64 -6430.72

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-012 J60-2 Sq.M. 1 270 135 36450

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -1 64 -3215.36

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-013 J60-2 Sq.M. 1 411 328 134808

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -2 84 -11077.92

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-014 J60-2 Sq.M. 1 411 328 134808

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-2 Sq.M. -2 84 -11077.92

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-015 J60-4 Sq.M. 4 52 52 10816

20.3.1 200mm thick approved clean sand cushion Dyke area J60-4 Sq.M. 4 56 50 11200

20.3.1 200mm thick approved clean sand cushion Dyke area J60-4 Sq.M. 4 56 56 12544

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-4 Sq.M. -4 23 -1661.06

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-4 Sq.M. -4 20 -1256

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-4 Sq.M. -4 27 -2289.06

20.3.1 200mm thick approved clean sand cushion J60-S-VA-541686-016 J60-5 Sq.M. 2 225 50 22500

20.3.1 200mm thick approved clean sand cushion Dyke area J60-5 Sq.M. 1 230 150 34500

20.3.1 200mm thick approved clean sand cushion Dyke area J60-5 Sq.M. 1 109 102 11118

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -6 18 -1526.04

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -3 41 -3958.755

20.3.1 200mm thick approved clean sand cushion Dedn for tanks 3.14 J60-5 Sq.M. -3 29 -1980.555

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-002 J60-3 Sq.M. 1 78 19 1482

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-003 J60-3 Sq.M. 1 57 12 684
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-003 J60-3 Sq.M. 1 39 8 312

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-005 J60-3 Sq.M. 1 30 11 330
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-005 J60-3 Sq.M. 1 52 9 468

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-006 J60-3 Sq.M. 1 49 10 490
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-006 J60-3 Sq.M. 1 76 9 684
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-006 J60-2 Sq.M. 1 66 10 660
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-006 J60-2 Sq.M. 1 84 18 1512

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-007 J60-3 Sq.M. 1 65 10 650
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-007 J60-3 Sq.M. 1 72 11 792

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-008 J60-5 Sq.M. 1 90 13 1170

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-009 J60-5 Sq.M. 1 61 13 793

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-011 J60-2 Sq.M. 1 54 10 540

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-013 J60-2 Sq.M. 1 28 10 280

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-014 J60-2 Sq.M. 1 29 10 290

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-015 J60-4 Sq.M. 1 74 10 740
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-015 J60-4 Sq.M. 1 25 10 250
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-015 J60-4 Sq.M. 1 60 10 600

9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-016 J60-5 Sq.M. 1 30 12 360
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-016 J60-5 Sq.M. 1 33 12 396
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-016 J60-5 Sq.M. 1 27 12 324
9.1.4 150mm thick Concrete Grade slab J60-S-VA-541686-016 J60-5 Sq.M. 1 27 12 324

13.1 Asphalt Road


0
13.1.1 Primary Road: 8m wide + 2m wide shoulder J60-S-VA-541686-002 J60 J60-3 M 1330 1330
Primary Road: 8m wide + 2m wide shoulder
13.1.1 J60-S-VA-541686-003 J60 J60-3 M 2147 2147

Primary Road: 8m wide + 2m wide shoulder


13.1.1 J60-S-VA-541686-004 J60 J60-3 M 264 264

Primary Road: 8m wide + 2m wide shoulder


13.1.1 J60-S-VA-541686-005 J60 J60-3 M 333 333

Primary Road: 8m wide + 2m wide shoulder


13.1.1 J60-S-VA-541686-006 J60 J60-3 M 1709 1709

Primary Road: 8m wide + 2m wide shoulder


13.1.1 J60-S-VA-541686-006 J60 J60-2 M 837 837

Primary Road: 8m wide + 2m wide shoulder


13.1.1 J60-S-VA-541686-007 J60 J60-3 M 1116 1116

Primary Road: 8m wide + 2m wide shoulder


13.1.1 J60-S-VA-541686-008 J60 J60-5 M 3256 3256

616234002.xlsx Old UG Back-up 9 of 14


Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)
Primary Road: 8m wide + 2m wide shoulder
13.1.1 J60-S-VA-541686-009 J60 J60-5 M 2234 2234

Primary Road: 8m wide + 2m wide shoulder


13.1.1 J60-S-VA-541686-010 J60 J60-5 M 897 897

Primary Road: 8m wide + 2m wide shoulder J60-S-VA-541686-011 J60 J60-2 1411 1411
13.1.1 M
Primary Road: 8m wide + 2m wide shoulder
13.1.1 J60-S-VA-541686-012 J60 J60-2 M 588 588

Primary Road: 8m wide + 2m wide shoulder


13.1.1 J60-S-VA-541686-013 J60 J60-2 M 716 716

Primary Road: 8m wide + 2m wide shoulder


13.1.1 J60-S-VA-541686-014 J60 J60-2 M 358 358

Primary Road: 8m wide + 2m wide shoulder J60-S-VA-541686-015 J60 J60-4 1404 1404
13.1.1 M
Primary Road: 8m wide + 2m wide shoulder
13.1.1 J60-S-VA-541686-016 J60 J60-5 M 867 867

19467

7.3.3 Plant Road Type 3- 3.8m Road M

12.3.2 Gatch Parking Sq.M.

13.1.4 OWS Manholes Nos


13.1.4a Clean out pit - 1.2m x 1.2m x 1.2m deep Nos
13.1.2 Sump for Storm water Drain Nos

13.1.3.1 Inspection Pit Nos


20.2.6 Septic Tank Nos

Trapezoidal open ditch with Cast-in-situ


15.3.1.1 J60-S-VA-541686-002 J60-3 M 1361
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-003 J60-3 M 2265
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-004 J60-3 M 949
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-005 J60-3 M 940
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ J60-S-VA-541686-006 J60-3 1560
15.3.1.1 M
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-006 J60-2 895
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-007 J60-3 M 2327
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ J60-S-VA-541686-008 J60-5 4193
15.3.1.1 M
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-009 J60-5 M 2353
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-010 J60-5 M 1080
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ J60-S-VA-541686-011 J60-2 1359
15.3.1.1 M
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-012 J60-2 M 733
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-013 J60-2 M 1417
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ J60-S-VA-541686-014 J60-2 709
15.3.1.1 M
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-015 J60-4 M 3872
Reinforced Concrete Lining
Trapezoidal open ditch with Cast-in-situ
15.3.1.1 J60-S-VA-541686-016 J60-5 M 1803
Reinforced Concrete Lining

0
13.2.2 Storm Water Drain - 2 M
13.2.3 Storm Water Drain - 3 M
13.2.4 Storm Water Drain - 4 M

14.1.1 Catch pits Nos


14.2.1 Storm Water Drain - Culvert 1 Nos
14.2.2 Storm Water Drain - Culvert 2 Nos

Valve pit of size 4m W X 3m L X 1.2m D for Fire


15.1.1.1 Water Nos

15.1.1.2 Valve pit of size 2m W X 2m L X 1.2m D for Fire


Water Nos

15.1.2 Roding Pit Nos

15.1.3 Flange Pit Nos

15.1.4 Valve pit of size 1.5m W X 2m L X 1.2m D for OWS Nos

15.1.5 Telecom pit with cover - 750 W x 1400 L x 1100 D Nos

16.1.1 Fence @ 3000c/c M

16.2.1.1 Gates - Emergency Gates- 6.3m 2 posts for each gate Nos
16.2.1.2 Gates - Emergency Gates- 8.3m 2 posts for each gate Nos
16.1.2 Gates - Boom Gates 2 posts for each gate Nos

16.3.1.1 Gates - Man access-1.4m 2 posts for each gate Nos

16.4 Crash Barriers Post @ every 1.5m M

16.5 Pipe Bollards Pre-cast Nos


616234002.xlsx Old UG Back-up 10 of 14
Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)

20.2.5 Trap Degrase - 1000mm x 1000mm x 1000mm Pre-cast Nos

20.2.7.2 Earth Pit Nos


Precast Concrete block - Electrical- 300 x 300x 500
20.2.7.3 deep Pre-cast Nos

20.2.8.1 Precast Block - Instrumentation Pre-cast Nos

2.6.1.3.1 Telecom buried trenches -800W x 800D Directly Buried

6.4 Curb stones M

20.2.2 1.2 m height T- wall M

6.1.1.1 Grade Slab Sq.M.

6.1.1.3 Ramp Cu.M.

22.1.1 CP Transformer Rectifier; 200mm above GL. Nos


CP Junction Box/distribution / bond box 50mm
22.1.2 above GL. Nos
22.1.3 Test station ; 50mm above GL. Nos

22.2 Buried trench for Anode installation m


Trench - 500mm x 1500mm

22.3 Buried trench for Cable Laying m


Trench - 500mm x 700mm

22.4 Anode bed Borewell Nos

3.2.1a SWD 8 inch J60-3 m 1230 1230


3.2.1a SWD 8 inch J60-5 m 940 940
3.2.1a SWD 8 inch J60-4 m 85 85
3.2.1a SWD 8 inch J60-2 m 238 238

9.2 Asphalt Paving J60-S-VA-541686-002 J60 J60-3 m2 1 90 13 1170


9.2 Asphalt Paving J60-S-VA-541686-003 J60 J60-3 m2 1 39 11 429
9.2 Asphalt Paving J60-S-VA-541686-003 J60 J60-3 m2 1 72 13 936
9.2 Asphalt Paving J60-S-VA-541686-005 J60 J60-3 m2 1 38 11 418
9.2 Asphalt Paving J60-S-VA-541686-005 J60 J60-3 m2 1 52 15 780
9.2 Asphalt Paving J60-S-VA-541686-006 J60 J60-3 m2 1 62 12 744
9.2 Asphalt Paving J60-S-VA-541686-006 J60 J60-3 m2 1 87 12 1044
9.2 Asphalt Paving J60-S-VA-541686-006 J60 J60-2 m2 1 79 12 948
9.2 Asphalt Paving J60-S-VA-541686-006 J60 J60-2 m2 1 86 12 1032
9.2 Asphalt Paving J60-S-VA-541686-007 J60 J60-3 m2 1 66 12 792
9.2 Asphalt Paving J60-S-VA-541686-007 J60 J60-3 m2 1 70 12 840
9.2 Asphalt Paving J60-S-VA-541686-008 J60 J60-5 m2 1 90 12 1080
9.2 Asphalt Paving J60-S-VA-541686-009 J60 J60-5 m2 1 63 12 756
9.2 Asphalt Paving J60-S-VA-541686-011 J60 J60-2 m2 1 54 12 648
9.2 Asphalt Paving J60-S-VA-541686-013 J60 J60-2 m2 1 27 12 324
9.2 Asphalt Paving J60-S-VA-541686-014 J60 J60-2 m2 1 27 12 324
9.2 Asphalt Paving J60-S-VA-541686-015 J60 J60-4 m2 1 88 12 1056
9.2 Asphalt Paving J60-S-VA-541686-015 J60 J60-4 m2 1 38 12 456
9.2 Asphalt Paving J60-S-VA-541686-015 J60 J60-4 m2 1 64 12 768
9.2 Asphalt Paving J60-S-VA-541686-016 J60 J60-5 m2 2 29 13 754
9.2 Asphalt Paving J60-S-VA-541686-016 J60 J60-5 m2 2 29 10 580

15879

15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-002 J60 J60-3 m 1 578 578
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-002 J60 J60-3 m 1 578 578
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-002 J60 J60-3 m 1 578 578
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-002 J60 J60-3 m 1 578 578
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-003 J60 J60-3 m 1 548 548
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-003 J60 J60-3 m 1 548 548
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-003 J60 J60-3 m 1 528 528
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-003 J60 J60-3 m 1 528 528
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-003 J60 J60-3 m 1 351 351
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-005 J60 J60-3 m 1 193 193
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-005 J60 J60-3 m 1 193 193
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-005 J60 J60-3 m 1 193 193
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-005 J60 J60-3 m 1 223 223

616234002.xlsx Old UG Back-up 11 of 14


Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-005 J60 J60-3 m 1 223 223
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-3 m 1 360 360
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-3 m 1 360 360
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-3 m 1 210 210
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-3 m 1 210 210
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-3 m 1 160 160
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-2 m 1 140 140
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-2 m 1 140 140
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-2 m 1 140 140
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-2 m 1 140 140
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-2 m 1 160 160
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-006 J60 J60-2 m 1 115 115
15.3.1.4a Rect ditch with gratting -1
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-007 J60 J60-3 m 1 388 388
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-007 J60 J60-3 m 1 388 388
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-007 J60 J60-3 m 1 388 388
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-007 J60 J60-3 m 1 321 321
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-007 J60 J60-3 m 1 698 698
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-008 J60 J60-5 m 1 652 652
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-008 J60 J60-5 m 1 652 652
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-008 J60 J60-5 m 1 652 652
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-008 J60 J60-5 m 1 652 652
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-009 J60 J60-5 m 1 669 669
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-009 J60 J60-5 m 1 669 669
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-009 J60 J60-5 m 1 669 669
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-009 J60 J60-5 m 1 669 669
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-010 J60 J60-5 m 1 666 666
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-010 J60 J60-5 m 1 666 666
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-010 J60 J60-5 m 1 666 666
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-011 J60 J60-2 m 1 561 561

15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-011 J60 J60-2 m 1 560 560

15.3.1.4a Rect ditch with gratting -1 0


15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-012 J60 J60-2 m 1 540 540
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-013 J60 J60-2 m 1 740 740
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-013 J60 J60-2 m 1 740 740
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-014 J60 J60-2 m 1 740 740
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-014 J60 J60-2 m 1 740 740
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-015 J60 J60-4 m 4 156 624
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-015 J60 J60-4 m 4 156 624
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-015 J60 J60-4 m 4 168 672
15.3.1.4a Rect ditch with gratting -1 0
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-016 J60 J60-5 m 6 175 1050
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-016 J60 J60-5 m 2 380 760
15.3.1.4a Rect ditch with gratting -1 J60-S-VA-541686-016 J60 J60-5 m 1 313 313

26104

3.3.2c OWS 12 inch Network-1 J60 m 5353 5353


3.3.2c OWS 12 inch Network-2 J60 m 7299 7299

15.1.1a OWS MH -1 J60 Nos. 166 166

16.1.2a OWS Valve pit -1 J60 Nos. 80 80

15.2a OWS sumps


15.2b.1 Sump-1 J60 Nos 80 80

15.2.1 CB-1 J60 Nos. 107 107

21.1.b Fencing J60 m 282.8 282.8

21.2.1.1a Gate 8.0m J60 Nos. 0 0


21.2.1.1b Gate 6.0m J60 Nos. 6 6
21.2.1.1c Gate 3.6m J60 Nos. 3 3

21.2.1.2a Gate 1.0m J60 Nos. 4 4


21.2.1.2b Gate 1.2m J60 Nos. 2 2

20.3.2 Tankage 100mm thk Gravel paving J60 m2 1 29 16 464


20.3.2 Tankage 100mm thk Gravel paving J60 m2 1 42 18 756
20.3.2 Tankage 100mm thk Gravel paving J60 m2 1 30 17 510

16.3.1 Hand Hole Pit 1 J60 Nos. 0 0

3.1.1a Tel Buried Trench - 1 Soil Trench J60 m 3000 3000


616234002.xlsx Old UG Back-up 12 of 14
Width Height/
Sr. No. Items Location Reference Phase Unit No.s Length (m) Total Remarks
(m) thk. (m)
8.3.1 Tel concrete trench -1 RCC Trench J60 m 110 110

7.3.1 Tel DB -1 J60 Nos. 12 12

616234002.xlsx Old UG Back-up 13 of 14


JI-2022/ Sohar Refinery Expansion Project, Oman
OVERALL PRICING SUMMARY-JI-2022/04-001-MEI PACKAGE (ITB-3)
2.5 (a)    Provisional Subcontract Price
REV : 0
REF: SECTION-5 , CLAUSE 6, "SUBCONTRACT PRICE" OF SUBCONTRACT ITB Date : 20.05.14

Important Note to Subcontractor : Subcontractor shall include associated preliminaries in direct rates only. No Separate
preliminaries are to be quoted.
A] PKG#5 - AREA-4 / UTILITY & OFFSITE MEI
S.No Bill Provisional Subcontract
Provisional Element Description Remarks
Price in USD
No.
1 Bill-3 Structural Erection 9,943,631
2 Bill-4A Field Piping 17,555,504
3 Bill-4.1 Primary Pipe Supports 364,780
4 Bill-4.2 Piping Offline Manual Valve Testing 138,000
5 Bill-5.1 Static Equipment Erection 4,612,170
6 Bill-5.2 Rotary Equipment Erection 7,422,728
7 Bill-8 Piping Insulation 17,386,382
8 Bill-8E Equipment Insulation 3,063,635
9 Bill-9 Field Piping Painting 1,305,421
10 Bill-10 HSE Not Included
11 Bill-6 Electrical 14,266,464
12 Bill-6.1 Telecom 1,531,163
13 Bill-6.2 Cathodic Protection Not Included
14 Bill-7 Instrumentation 6,060,684
15 N.A EXCLUSIONS / QUALIFICATIONS / DEVIATIONS
TOTAL PRICE FOR
PKG#5 - AREA-4 / UTILITY & OFFSITE MEI ==> 83,650,562

616234002.xlsx CMEI SUMMARY Page 14 of 14