SHEET : 1 OF: 7
TEST REPORT FOR FEEDER PROTECTION RELAY PAGE :
DATE : 19.06.2022
Client : M/s. BPCL Refinery,Mahul,Mumbai,Maharastra.
Project: Maintenance and Testing of Relays
1. Location : RMP SUBSTATION-1/BD HT 210
Feeder Name : Plant Feeder-IC-2 HT-213 (HGU)
P.NO : 01
2. Name Plate Details:
Make ABB
Type REF 541
TESTED BY VOLTECH WITNESSED BY
SHEET : 2 OF: 7
TEST REPORT FOR FEEDER PROTECTION RELAY PAGE :
DATE : 19.06.2022
Client : M/s. BPCL Refinery,Mahul,Mumbai,Maharastra.
Project: Maintenance and Testing of Relays
Sl. No. 133016
CT Ratio 1250/5 A
3. Settings:
NEF1(LOW) NOC3(LOW)
Operation Mode Definite Time Operation Mode Normal Inverse
Start Current 10% In Start Current 1.0 In
Operating time 0.5 Sec TMS 0.18
NEF1(HIGH)
TESTED BY VOLTECH WITNESSED BY
SHEET : 3 OF: 7
TEST REPORT FOR FEEDER PROTECTION RELAY PAGE :
DATE : 19.06.2022
Client : M/s. BPCL Refinery,Mahul,Mumbai,Maharastra.
Project: Maintenance and Testing of Relays
Operation Mode Definite Time
Start Current 0.15 In
Operating time 0.5 Sec
4.Measurements:
Reference Injected current(A) Measured current(A)
R 5.0 1250.1
TESTED BY VOLTECH WITNESSED BY
SHEET : 4 OF: 7
TEST REPORT FOR FEEDER PROTECTION RELAY PAGE :
DATE : 19.06.2022
Client : M/s. BPCL Refinery,Mahul,Mumbai,Maharastra.
Project: Maintenance and Testing of Relays
Y 5.0 1250.3
B 5.0 1250.1
N 5.0 1250.3
TESTED BY VOLTECH WITNESSED BY
SHEET : 5 OF: 7
TEST REPORT FOR FEEDER PROTECTION RELAY PAGE :
DATE : 19.06.2022
Client : M/s. BPCL Refinery,Mahul,Mumbai,Maharastra.
Project: Maintenance and Testing of Relays
5.SECONDARY INJECTION TEST
5.1 NOC3(LOW):
Operate Time (s)
Ref Set Current (A) Operated Current (A) TMS
X2 X5
RY 5.0 5.02 0.18 1.796 0.863
YB 5.0 5.02 0.18 1.795 0.864
5.2 NEF1(LOW):
TESTED BY VOLTECH WITNESSED BY
SHEET : 6 OF: 7
TEST REPORT FOR FEEDER PROTECTION RELAY PAGE :
DATE : 19.06.2022
Client : M/s. BPCL Refinery,Mahul,Mumbai,Maharastra.
Project: Maintenance and Testing of Relays
Ref Set Current (A) Operated Current (A) Set Time (s) Operate Time (s)
E/F 0.5 0.521 0.5 0.518
5.3 NEF1(HIGH):
Ref Set Current (A) Operated Current (A) Set Time (s) Operate Time (s)
E/F 0.75 0.751 0.5 0.516
6. Functional checks: (Whether Operational Checks OK / Not OK / Not Applicable)
1 Correct operations of LED OK
TESTED BY VOLTECH WITNESSED BY
SHEET : 7 OF: 7
TEST REPORT FOR FEEDER PROTECTION RELAY PAGE :
DATE : 19.06.2022
Client : M/s. BPCL Refinery,Mahul,Mumbai,Maharastra.
Project: Maintenance and Testing of Relays
2 Correct operations of B/O OK
3 Correct circuit breaker tripping contacts OK
4 Master trip relay tripping properly OK
5 CT shorting link should be short OK
7. Comments : Nil.
8. Remarks : Relay Found Healthy.
TESTED BY VOLTECH WITNESSED BY