NBC FORM NO.
A - 03
Republic of the Philippines
City of Malolos
Province of Bulacan
OFFICE OF THE BUILDING OFFICIAL
ELECTRICAL PERMIT
APPLICATION NO. ELECTRICAL PERMIT NO.
______________________ - E ______________________ - E
BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE OWNER/APPLICANT)
OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
FOR CONSTRUCTION OWNED FORM OF OWNERSHIP USE OR CHARACTER OF OCCUPANCY
BY AN ENTERPRISE
ADDRESS: NO., STREET, BARANGAY, CITY/MUNICIPALITY ZIP CODE TELEPHONE NO
LOCATION OF CONSTRUCTION: LOT NO. _______________ BLK NO. ________________ TCT NO. ______________________ TAX DEC. NO. ____________________
STREET_______________________________________________________ BARANGAY ____________________________________________________ CITY OF MALOLOS
SCOPE OF WORK
NEW INSTALLATION RECONNECTION OF SERVICE ENTRANCE RELOCATION OF SERVICE ENTRANCE
ANNUAL INSPECTION SEPARATION OF SERVICE ENTRANCE OTHERS (Specify)___________________________________
TEMPORARY UPGRADING OF SERVICE ENTRANCE __________________________________________________
SUMMARY OF ELECTRICAL LOADS/CAPACITIES APPLIED FOR
TOTAL CONNECTED LOAD TOTAL TRANSFORMER CAPACITY TOTAL GENERATOR/UPS CAPACITY
___________________ kVA _____________________ kVA ____________________ kVA
BOX 2 (TO BE ACCOMPLISHED IN PRINT BY THE DESIGN PROFESSIONAL)
DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS
Address
PRC. No Validity
Date____________
PROFESSIONAL ELECTRICAL ENGINEER PTR. No Date Issued
(Signed and Sealed Over Printed Name)
Issued at TIN
BOX 3
SUPERVISOR / IN-CHARGE OF ELECTRICAL WORKS
PROFESSIONAL ELECTRICAL ENGINEER REGISTERED ELECTRICAL ENGINEER REGISTERED MASTER ELECTRICIAN
Date______________
(Signed and Sealed Over Printed Name)
PRC. No Validity
PTR. No Date Issued
Issued at TIN
Address
BOX 4 BOX 5
BUILDING OWNER WITH MY CONSENT: LOT OWNER
Date_____________ Date____________
(Signature Over Printed Name) (Signature Over Printed Name)
Address Address
C.T.C. No. Date Issued Place Issued C.T.C. No. Date Issued Place Issued
TO BE ACCOMPLISHED BY THE PROCESSING & EVALUATION DIVISION
BOX 6
RECEIVED BY: DATE:
FIVE (5) SETS OF ELECTRICAL DOCUMENTS
ELECTRICAL PLANS AND SPECIFICATIONS EXPECTED DATE OF COMPLETION/INSTALLATION/CONSTRUCTION
SPECIAL FIXTURES AND EQUIPMENT ___________________________________________________________
PROPOSED STARTING DATE OF INSTALLATION/CONSTRUCTION OTHERS (Specify)____________________________________________
___________________________________________________________ ___________________________________________________________
BOX 7
PROGRESS FLOW
IN OUT PROCESSED BY:
DATE TIME DATE TIME
ELECTRICAL ARNOLD E. PUNONGBAYAN
OTHERS (Specify) ELECTRICAL ENGINEER
PRC Reg. No.:_________________
Validity:_______________________
BOX 8
ACTION TAKEN:
PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:
1. That the proposed electrical works shall be in accordance with the electrical plans filed with this Office and in conformity with
the provisions of the latest Philippine Electrical Codes, the National Building Code and its IRR.
2. That prior to any electrical installation, the Owner/Permittee shall submit a duly accomplished prescribed Notice of
Construction to the Office of the Building Official.
3. That for installed electrical capacity of 200 amperes and above at 230 volts nominal and above, a specialty electrical contractor
duly licensed by the Philippine Contractors Accreditation Board (PCAB) shall be required.
4. That a duly licensed electrical practitioner shall be in-charge of the installation, and that upon completion of the electrical works,
he shall submit the entry of the logbook duly signed and sealed to the OBO including as-built plans and other documents. He
shall also accomplish the Certificate of Completion stating that the electrical works conform to the provisions of the Philippine
Electrical Codes, the National Building Code and its IRR.
5. That this permit is null and void unless accompanied by the building permit except for projects involving purely electrical works
in which case only the building permit number of the existing building/structure shall be required.
6. That a Certificate of Final Electrical Inspection (CFEI) shall be secured prior to the actual occupancy of the building.
7. That this permit shall be posted at the door or site of work.
RECOMMENDING APPROVAL: APPROVED BY:
ENGR. CECILIA C. SANTOS ENGR. RICASOL P. MILLAN
ENGINEER II CITY ENGINEER
Date ___________________ Date ___________________