0% found this document useful (0 votes)
32 views1 page

ST 01

This document is a monthly statement from the Multan Electric Power Company detailing the units received and sent out from the 132 KV Grid Station in Industrial Estate Rahim Yar Khan. It includes information on power transformers, total units, capacitor details, and load percentages. The statement is intended for internal review and forwarding to the appropriate sub-division for further processing.

Uploaded by

khalid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views1 page

ST 01

This document is a monthly statement from the Multan Electric Power Company detailing the units received and sent out from the 132 KV Grid Station in Industrial Estate Rahim Yar Khan. It includes information on power transformers, total units, capacitor details, and load percentages. The statement is intended for internal review and forwarding to the appropriate sub-division for further processing.

Uploaded by

khalid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MULTAN ELECTRIC POWER COMPANY .

LTD(MEPCO)
MONTHLY STATEMENT SHOWING UNITS RECIVED & SENT OUT
I.R.O 132 KV GRID STATION INDUSTRIAL ESTATE RAHIM YAR KHAN. FOR THE MONTH OF ___/20____
ST-01

REMARKS

DIFFERENCE
NAE OF POWER TRANSFORMER TOTAL TOTAL CAPACITOR MINIMUM MAXIMUM
AUX WHERE AUX UNIT
SR.NO GRID UNIT UNIT % AGE KVARH P/F LOAD LOAD
UNITE ARE
STATION RECIVED SENT % AGE % AGE
INCLUDED
VOLTAGE ONLINE OFFLINE
NAME MVA
RATIO
MVAR MVAR
INDUSTRIAL ESTATE RAHIM YAR
132 KV GRID STATION

132/11 KV

31.5/40
KHAN

MVA
HEC
1

No: Date:

Incharge
132 KV G/S Industrial Estate
Forward to A.M (T) SS&T Sub Division Rahim Yar Khan Rahim Yar Khan

You might also like