QAP K-House

This document outlines the fabrication quality assurance plan for K-House. It details the raw materials used, inspection procedures, acceptance criteria, responsibilities and record keeping for each stage of fabrication. Key raw materials include HR sheets, hot rolled sections, outer and inner GPPP sheets and roof/wall panels. Inspections include checking dimensions, surface defects, markings and edge preparations. Records such as inspection reports, MTCs and lab reports will be maintained to document compliance.

Uploaded by

Abhinash Tamang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
336 views4 pages

QAP K-House

This document outlines the fabrication quality assurance plan for K-House. It details the raw materials used, inspection procedures, acceptance criteria, responsibilities and record keeping for each stage of fabrication. Key raw materials include HR sheets, hot rolled sections, outer and inner GPPP sheets and roof/wall panels. Inspections include checking dimensions, surface defects, markings and edge preparations. Records such as inspection reports, MTCs and lab reports will be maintained to document compliance.

Uploaded by

Abhinash Tamang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

FABRICATION QUALITY ASSURANCE PLAN

K-HOUSE

REVISION CONTROL SHEET


Rev. No Issue Date Document Number Documents Prepared By Reviewed By Approved By

R0 19-Jul-21 TSL/S&S/NI/QAC/LOG-001 Factory Inspection Call Register Abhinash Tarique Hassan Nitin Kr. Thakur
Thapa

R0 19-Jul-21 TSL/S&S/NI/QAC/QAP-014 Fabrication Quality Assurance Plan- K-House Neeraj Yadav Tarique Hassan Nitin Kr. Thakur

Abhinash
R0 19-Jul-21 TSL/S&S/NI/QAC/IR-007 Factory Inspection Report - Before Dispatch Tarique Hassan Nitin Kr. Thakur
Thapa

Prepared By Reviewed By Approved By


Name Neeraj Yadav Tarique Hassan Nitin Kr. Thakur
Designation QA-Engineer Manager- Project Planning & Control Head - Project Planning & Control
Date 19.08.2021 19.08.2021 19.08.2021
Doc. No.: TSL/S&S/NI/QAC/LOG-001
TATA STEEL LIMITED - NEST IN
Rev. No.: Effect from:
R0 19-Jul-21 FACTORY INSPECTION CALL REGISTER
Project Name/No. Location:
ClientProduct
Name: Category: Ref. Documents:
Component Manufacturer

Inspection Call Name of Inspection


Sl. No. Item Description Qty. Offered Inspection Remarks
reference Inspector Date & Time

(Name of CM) TSL- Nest In (Name of Client)

Signature & Date

Name
Designation

Page 2 of 4
Doc. No.:
TSL/S&S/NI/QAC/QAP-014 TATA STEEL LIMITED - NEST IN
Rev. No.: Effect from:
R0 19-Aug-21 FABRICATION QUALITY ASSURANCE PLAN- K HOUSE

Project Name/No: MAIN ITEM: K-House QAP No.


Client: SUB- ITEM: QAP DATE
Component PO NO. & DATE
Manufacturer/ Vendor:
Frequency of Responsibility
Sl.No Stage Description Characteristics Inspection Procedure Check Reference Documents Accepted Norms Format of Record Record Document Number
V NI C
a) Chemical Properties a) MTC Verification a) 100% a) IS 10748 / IS 2062 a) R a) R a) R a) MTC / Lab Report
b) Mechanical Propoerties b) MTC Verification b) 100% Mill Test Certificate b) IS 10748 / IS 2062 b) R b) R b) R b) MTC / Lab Report
1 Raw Material HR Sheets
c) Dimensions c) Measurement c) 10% of each lot Reference Drawing c) As per approved Drawing c) P c) R/W c) R c) Inspection Report
d) Physical condition d) Visual d) 100% d) Free from visible defects d) P d) R/W d) R d) Inspection Report

a) Chemical Properties a) MTC Verification a) 100% a) IS 10748 / IS 2062 a) R a) R a) R a) MTC / Lab Report
2 Raw Material Hot Rolled Sections (Angles, Tubes, b) Mechanical Propoerties b) MTC Verification b) 100% Mill Test Certificate b) IS 10748 / IS 2062 b) R b) R b) R b) MTC / Lab Report
etc) c) Dimensions c) Measurement c) 10% of each lot Reference Drawing c) As per approved Drawing c) P c) R/W c) R c) Inspection Report
d) Physical condition d) Visual d) 100% d) Free from visible defects d) P d) R/W d) R d) Inspection Report

3 Raw Material Outer Sheet 0.4 mm GPPP Surface Defect / Thickness Visual / Measurement One Sample As per approved drawings As per approved drawings P R R Inspection Report

4 Raw Material Inner Sheet 0.4 mm GPPP Surface Defect / Thickness Visual / Measurement One Sample As per approved drawings As per approved drawings P R R Inspection Report

5 Raw Material Puff Insulation - (40 Kg/m3) Dimensional Measurement Measurement One Sample As per approved drawings As per approved drawings P R R Inspection Report

6 Raw Material Roof Panels - 30 (+23) mm Dimensional Measurement Measurement One Sample As per approved drawings As per approved drawings P R R Inspection Report

7 Raw Material Side Wall & Partition Panels - 50mm Dimensional Measurement Measurement One Sample As per approved drawings As per approved drawings P R R Inspection Report

In Process As per shop floor drawings and cutting As per shop floor drawings and cutting
8 Marking Dimension Measurement 100% P R R Inspection report
Inspection plans. plans.

In Process As per shop floor drawings and cutting As per shop floor drawings and cutting Inspection Report
9 Cutting of the sheets Edge preparations etc Visual / Measurement 100% P R R
Inspection plans. plans.

a) Dimensions a) Measurement a) 100% a) P a) R/W a) R


10 In Process Welding b) Weld Appearances b) Measurement b) 100% AWS D1.1 AWS D1.2 b) P b) R/W b) R Inspection Report
Inspection
c) DP Test c) Visual c) 10% of each lot c) P c) R/W c) R

a) Surface Profile a) SA2.5


a) Surface Preparation by manual Measurement a) 100% a) SA2.5
cleaning b) IS 1477-2 (1971) a) P a) R/W a) R
11 In Process Painting b) Paint Specification b) 100%
c) As per Specs
b) IS 1477-2 (1971)
b) R b) R b) R
Inspection Report
Inspection b) Paint Specification Review c) 25% c) overall 90 microns
c) P c) R/W c) R
c) DFT c) DFT Measurement

a) Packing List
Packing List
Packaging & Material Dispatch Clearance Invoice b) Invoice
12 Shipping Shipping Certificate Review of Documents 100% Weighment Slips As per Specs/Client requirement P R/W NA c) Weighment Slips
E-way Bill d) E-way Bill
e) Inspection Report/Checklist

A. STATUTORY REQUIREMENTS SHALL BE COMPLIED WITH BY THE VENDOR. SIGN.


B. MATERIAL TESTS OF SAMPLES DRAWN BY NEST-IN SHALL BE WITNESSED BY NEST-IN. V NAME
C. FOR STAGES WITNESSED/DOCUMENTS REVIEWED BY NEST-IN, COPIES OF RELEVANT DOCUMENTS SHALL BE FURNISHED TO NEST-IN. DATE
D. INSTRUMENTS FOR ANY PERFORMANCE TESTS SHALL HAVE VALID CALIBRATION CERTIFICATE. (SUBJECTED TO QAP) SIGN.
NOTES

E. QAP no. must follow the system-QAP/Project No./Sr. no. of inspection NI NAME
F. LEGEND: V - VENDOR, NI – NEST IN, C – NEST-IN’s CLIENT, DATE
RMTC - RAW MATERIAL TEST CERTIFICATE, MTC -MATERIAL TEST CERTIFICATE, AWS - American Welding Society SIGN.
P - PERFORM, W- WITNESS, R - REVIEW, NA- Not Applicable C NAME
DATE
Doc. No.:
TSL/S&S/NI/QAC/IR-007 TATA STEEL LIMITED - NEST IN
Rev. No.: Effect from:
R0 19-Jul-21 Factory Inspection Report - Before Dispatch

Project Name/No. Location:


Client Name: Date:
Component Manufacturer
Product Category: Ref. documents
Acceptance
Name of Inspection/Test
SL.No. Item Description Qty. Offered Value (as per UoM Observed Value Deviation Accepted Rejected Remarks
Conducted
QAP)

(Name of CM) TSL- Nest In (Name of Client)

Signature & Date

Name
Designation

Page 4 of 4