A The Day Before Activities (Date) : Erection Contractor Main Contractor Client

The document provides a daily site report for a construction project including activities from the previous day, planned activities for the next day, materials delivered, and manpower and equipment details. Sections include the previous day's activities by location and staff roles, today's activities by staff roles, the day ahead plan by staff roles, materials delivered on a given date, and a table with manpower counts and equipment quantities.

Uploaded by

Smart Shiva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

A The Day Before Activities (Date) : Erection Contractor Main Contractor Client

The document provides a daily site report for a construction project including activities from the previous day, planned activities for the next day, materials delivered, and manpower and equipment details. Sections include the previous day's activities by location and staff roles, today's activities by staff roles, the day ahead plan by staff roles, materials delivered on a given date, and a table with manpower counts and equipment quantities.

Uploaded by

Smart Shiva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Utthunga Technologies Pvt Ltd.

,
DAILY SITE REPORT
ERECTION CONTRACTOR MAIN CONTRACTOR CLIENT
Date

Project Title : Manpower Equipment

A The Day Before Activities (Date) Location / Remarks Designation No:s Equipment Qty

1 Site Welding m/c

2 Project Engineer Cutting m/c

3 Site Engineer Gas cutter

4 Supervisor Grinder machine

5 Technician Wright angle

6 HSE Officer Sprit level

B Today Activities (Date) Store Keeper Hammer

1 Steel Fitter Drilling Machine


2 Welder Winch Machine

3 Electrician

4 Grinder Man

5 Gas Cutter
6 Rigger

C Day ahead Plan (Date) Helper

1 Painter

2 Operator

3 Total 0 Total 0

4 Vehicle Special tools


5 Land cruiser Pallet Trolley

D Material Delivered on (Date) 30 Seater bus Multimeter

1 Boom Loader 10Kv Megger

2 Hydra Earth Tester

3 10T Truck Cable Winch

4 Crane Drum stand


EPC Contractor Erection Vendor Remarks