HIRADC - Pile Cap

The document summarizes a hazard identification, risk assessment, and risk control plan for pile cap activities by Kinetic Builders Sdn Bhd. It identifies 4 key job sequences: 1) mobilizing materials, 2) mobilizing machinery, 3) excavating the pile cap, and 4) installing rebar and formwork. Hazards associated with each sequence including slips/trips/falls, being hit by machinery or cutters, and falling are assessed. Existing and recommended control measures are provided to reduce risks and comply with Malaysian legal standards.

Uploaded by

Kalai Arasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
355 views4 pages

HIRADC - Pile Cap

The document summarizes a hazard identification, risk assessment, and risk control plan for pile cap activities by Kinetic Builders Sdn Bhd. It identifies 4 key job sequences: 1) mobilizing materials, 2) mobilizing machinery, 3) excavating the pile cap, and 4) installing rebar and formwork. Hazards associated with each sequence including slips/trips/falls, being hit by machinery or cutters, and falling are assessed. Existing and recommended control measures are provided to reduce risks and comply with Malaysian legal standards.

Uploaded by

Kalai Arasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

KINETIC BUILDERS SDN HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK

BHD CONTROL (HIRARC)


Activities: Pile Cap Date: 19 Feb 2022 Rev: 00

Risk
Assessment

Job Sequence Hazard Existing / Current Recommended Control

Likelihood
No. Effect PIC

Residual
Severity
/ Steps Identification Control Measures Legal Measures

Risk
1. Mobilize Poor Slip, trip and NIL FMA 3 2 6 Administrative controls  Project
Materials materials fall (BOWEC  Brief the workers before starting the Manager
arrangement 1986) job. (Toolbox briefing)  Site
 Mobilize materials at save zone. Engineer
OSHA  Ensure walkway is free from  SSS
ACT 1994 obstruction.

2. Mobilization of Heavy Bodily Injury NIL FMA 3 2 6 Administrative controls  Project


machinery vehicle (BOWEC  Site personnel to control the Manager
movement 1986) surrounding activities with using  Site
whistle and flag.  Engineer
OSHA  Engage experience operator
(Hit by ACT 1994
 SSS
machinery)  Supervise by supervisor
 Barricade the area put signage.

3. Excavated of Hit by Fatal Proper platform to FMA 3 4 12 Administrative controls  Project


pile cap excavator park excavator (BOWEC  Brief the workers before starting the Manager
Body injury 1986) job. (Toolbox briefing)  Site
 Mobilize materials at save zone. Engineer
OSHA  Apply permit to work  SSS
ACT 1994
KINETIC BUILDERS SDN HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK
BHD CONTROL (HIRARC)
Activities: Pile Cap Date: 19 Feb 2022 Rev: 00

Risk
Assessment

Job Sequence Hazard Existing / Current Recommended Control

Likelihood
No. Effect PIC

Residual
Severity
/ Steps Identification Control Measures Legal Measures

Risk
3. Cutting of pile Hit by sharp Major injury Cutter pile in good FMA 3 4 12 Administrative controls  Project
cutter of pile condition (BOWEC  Site personnel to control the Manager
Fatal 1986) surrounding activities with using  Site
Hit by whistle and flag.  Engineer
OSHA  Engage experience operator
unwanted ACT 1994
 SSS
pile  Supervise by supervisor
 Barricade the area put signage.

4.. Install of rebar Slip and fall Major injury Provided Proper FMA 3 3 9 Administrative controls  Project
Access (BOWEC  Provide temporary walkway Manager
1986)  Supervise by supervisor  Site Engineer
Wear proper PPE  Barricade the area put signage.  SSS
OSHA
ACT 1994

Install of Slip and fall Bodily injury Provided proper FMA 3 3 9 Administrative controls  Project
4. formwork access (BOWE  Ensure workers are well trained. Manager
Falling of C 1986)  Workers to be briefed before start  Site Engineer
timber Wear proper PPE work.  SSS
OSHA  Supervisor to monitor work.
ACT .
1994
KINETIC BUILDERS SDN HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK
BHD CONTROL (HIRARC)
Activities: Pile Cap Date: 19 Feb 2022 Rev: 00

5. Pouring Hit by Bodily injury Maintain proper FMA 3 4 12 Administrative controls  Project
concrete concrete access (BOWE Manager
bucket C 1986)  Provided competent signal man to  Site Engineer
control the concrete bucket  SSS
Struck by OSHA  Check concrete bucket before use
concrete ACT  Workers to be briefed before start
bucket 1994 work
 Supervisor to monitor work
6. Dismantle Hit by sharp Major injury  Proper stacking of FMA 3 3 9  Workers to be briefed before start  Project
formwork nail timber (BOWE dismantling form-work Manager
C 1986)  Supervisor to monitor work  Site Engineer
 SSS
OSHA
ACT
1994
KINETIC BUILDERS SDN HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK
BHD CONTROL (HIRARC)
Activities: Pile Cap Date: 19 Feb 2022 Rev: 00
7. Housekeeping Sharp object Slip and fall  Proper housekeeping FMA 3 1 3 Administrative controls  Project
to keep material in (BOWE  Workers to be briefed before start Manager
good arrangement.
Bodily injury  Workers to be
C 1986) work.  Site Engineer
briefed before start  Supervisor to monitor work  SSS
work. OSHA
 Wear safety shoes ACT
 Wear cotton gloves 1994
when handling with
sharp object.

Scattered Proper housekeeping Administrative controls


Slip and fall  FMA 3 1 3  Project
object and to keep material in  Workers to be briefed before start
(BOWE Manager
obstruction Bodily injury
good arrangement.
C 1986) work.
 Workers to be
briefed before start Supervisor to monitor work  Site
work. OSHA Engineer
 Wear safety shoes ACT
 Wear cotton gloves 1994
when handling with
 SSS
sharp object.