LED Specification
LED Specification
TECHNICAL SPECIFICATION
Supply, installing , testing and Commissioning of 80 W LED lamps along with
fixtures for switchyard lighting in Substations.
-1 - -1 -
3.1 SCOPE:
3.2 STANDARDS:
The Bidder shall furnish all valid type test reports along with the bid
including the following as applicable as per the standards.
l
-3-
ii. The luminary casing/housing shall be of stainless sheet steel SS304 grade or
aluminum having high conductivity preferably to grade 5000 or LM9 or similar to
high conductivity heat sink material.
e. The protective cum adhesive coating used on PCBs should be cleared and
transparent and should not affect color code of electronic components or
the product code of the company.
f. The construction PCBs and the assembly for the components for the PCBs
should be as per IS/IEC standards.
g. The electronics covered for this equipment shall pass all the tests called
for in the above specification. The tenderer shall indicate the deviation or
compliance otherwise the offer shall not be considered for evaluation.
iv. The connecting wires used inside the luminaire, shall be low smoke halogen free,
fire radiant e-beam cable and use protection shall be provided in input side.
v. Care shall be taken in the design that there is no water stagnation anywhere. The
entire housing shall be dust and water proof having IP65 protection as per IEC
60529.
vi. The LED module(s), Driver gear, etc. shall be designed in such a way so that
temperature of heat sink shall not exceed 15 0C above the ambient temperature.
-4-
vii. All the materials used in the luminaire shall be halogen free and fire retardant
confirming to safety standard UL94.
viii. Lumen maintenance of 70% for at least 50000 hours for Interior and exterior
applications. Data sheet showing lumen maintenance in the LED shall also be
submitted.
2. The connecting wires used in the circuit should be of UL grade and the
certificate of the same shall be made available on request.
-5-
3. constant current out put for wide input voltage range.
4. MCPCB should possess thermal conductivity of up to 3W/m-0 K
5. MCPCB thermal resistance should be less than 0.350 C-cm2/watt.
Protection
1. over current
2. over voltage
3. over temperature
4. under voltage protection
5. out put short circuit protection
Testing procedures and certificates
3.19.2 The following drawings for each item are to be supplied as a part of the
contract.
4.0 TESTS
a) All the offered equipment shall be fully type tested by the bidder as
per the relevant standard. The type tests must have been conducted
on the same rating of LED Luminaries/Fittings not earlier than ten
years as on the date of bid opening. The bidder shall furnish two sets
of the following type test reports as per relevant standards for each
type of equipment offered along with the bid. The offers received
without these test reports shall be treated as NON-RESPONSIVE .
b) Special tests other than type and routine tests, Bidder shall also be carry
out any tests that are required to establish the performance of the Light
fittings offered as per the technical specification at any stage at the bidder’s
cost.
c) The pre-shipment checks to be carried out by the Bidder are given under
clause 6.0, "Inspection".
d) The bidder shall offer the LED Luminaries / Fittings type tested. The type
tests should have been conducted not earlier than 10 years as on date of bid
opening. In the absence of not having valid type test reports as above, the
successful bidder shall conduct the type tests on the offered equipment
before supply.
a) Four (4) sets of certified test reports and oscillograms shall be submitted for
approval prior to despatch of the equipment. The equipment shall be
dispatched only when all the required type and routine tests have been
carried out and test reports have been approved by the Purchaser.
b) Four (4) copies of the test reports for the tests carried out on the ancillary
apparatus shall be furnished to the Purchaser for approval prior to despatch.
-7-
c) All auxiliary equipment shall be tested as per the relevant standard. Test
certificate shall be submitted for bought out items.
6.0 INSPECTION
6.1 General
i) The owner shall have access at all times to the works and all other places
of manufacture where the LED Luminaries/Fittings are being
manufactured and the Bidder shall provide all facilities for unrestricted
inspection of the Bidder's works, raw materials, manufacture of all the
accessories and for conducting necessary tests as detailed herein.
ii) The successful Bidder shall keep the Purchaser informed in advance of the
time of starting and of the progress of manufacture of equipment in its
various stages so that arrangements could be made for inspection.
iv) The acceptance of any quantity of equipment shall in no way relieve the
successful Bidder of his responsibility for meeting all the requirement of
this specification and shall not prevent subsequent rejection if such
equipment are later found to be defective.
a) The Bidder shall chalk out a detailed inspection and testing programme for
manufacturing activities for the various components. An indicative
programme of inspection as envisaged by the Purchaser. This is not
however intended to form a comprehensive programme as it is Bidder's
responsibility to draw up and carry out such a programme duly
approved by the Purchaser. The owner reserves the right to carryout
any tests by a third party.
7.1 The bidder shall invariably furnish the following information along with his offer
failing which the offer shall be liable for rejection. Information shall be
separately given for individual type of equipment offered.
a) The Structure of organization
-8-
k) List of testing equipment available with the bidder for final testing of
equipment specified and test plant limitation, if any vis-a-vis the type.
Special acceptance and routine tests specified in the relevant standards.
These limitations shall be very clearly brought out in "Schedule of
Deviations" from the specified test requirements.
7.2 The Contractor shall within 30 days of placement of order, submit the following
information to the purchaser.
i) List of the raw material as well as bought out accessories and the names of
sub-suppliers selected from those furnished along with the offer.
ii) Type test certificates of the raw material and bought out accessories if
required by the purchaser.
iii) Quality Assurance Plan (QAP) with hold points for purchasers inspection.
QAP and purchasers hold points shall be discussed between the purchaser
and contractor before the QAP is finalised.
The contractor shall submit the routine test certificates of bought out accessories and
central excise invoice for raw material at the time of routine testing if required by the
purchaser and ensure that the quality assurance requirements of specification are
followed by the sub-contractor.
-9-
7.3.1 The Quality Assurance Programme shall give a description of the Quality System
and Quality Plans with the following details.
a) Quality System:
b) Quality Plans:
a. An outline of the proposed work and program sequence.
b. The structure of contractors organizations for the contract.
c. The duties and responsibilities ensuring quality of work
d. Hold and notification points.
e. Submission of engineering documents required by this specification.
f. The Inspection of the materials and components on request.
g. Reference to contractors work procedures appropriate to each activity.
h. Inspection during fabrication/construction.
i. Final inspection and test.
8.0 DOCUMENTATION:
8.1 i) The Bidder shall furnish along with the bid the dimensional drawings
of LED Luminaries / Fittings, GA and all other accessories.
ii) These drawings shall include the following information.
a) Detailed internal drawings of LED Luminaries / Fittings clearly
indicating all the details of assembly incorporating all important
dimensions, ratings etc.
b) Tolerances on dimensions.
c) Material designation used for different components with
reference to standards.
i) Four copies of type test reports shall be furnished to the Purchaser within
one month of conducting the tests. one copy will be returned duly
certified by Purchaser to the Bidder within three weeks thereafter and
on receipt of the same Bidder shall commence with the commercial
production of the concerned material.
iii) All records of routine test reports shall be maintained by the Bidder at
his works for periodic inspection by the Purchaser.
iv) All test reports for tests conducted during manufacture shall be maintained
by the Bidder. These shall be produced for verification as and when
requested for by the Purchaser.
The Bidder shall within 2 weeks of placement of order, submit four sets of final
versions of all the above drawings for Purchaser's approval. The Purchaser shall
communicate his comments/approval on the drawings to the Bidder within
reasonable time. The Bidder shall, if necessary, modify the drawings and resubmit
four copies of the modified drawings for Purchaser's approval within two weeks
from the date of Purchaser's comments.
After receipt of Purchaser's approval, the Bidder shall within three weeks, submit
6 prints and two good quality reproducible of the approved drawings for
Purchaser's use.
8.4 Adequate copies of contract drawings, acceptance and routine test certificates, duly
approved by the Purchaser shall accompany each of the dispatched consignment.
8.5 The manufacturing of the equipment shall be strictly in accordance with the
approved drawings and no deviation shall be permitted without the written
approval of the Purchaser. All manufacturing and fabrication work in connection
with the equipment prior to the approval of the drawing shall be at the Bidder's
risk only.
8.6 Six copies of nicely printed and bound volumes of operation, maintenance and
erection manuals in English language shall be supplied by the Bidder along
with each LED Luminaries / Fittings to destination. The manual shall contain all
the drawings and information required for erection, operation and maintenance of
- 11 -
theLED Luminaries/Fittings. The manual shall also contain a set of all the
approved drawings, type, routine & acceptance Test reports etc.
8.6 Approval of drawings by the Purchaser shall not relieve the Bidder of his
responsibility and liability for ensuring correctness and correct interpretation of
the latest revision of applicable standards, rules and codes of practices. The
equipment shall conform in all respects to high standards of engineering, design,
workmanship and latest revisions of relevant standards at the time of ordering
and the Purchaser shall have the power to reject any material which in his
judgment is not in full accordance therewith.
The Bidder shall ensure that the packing and bill of material are approved by the
Purchaser before despatch.
9.3 Weight of the LED Luminaries / Fittings shall be designed, so that the LED
Luminaries / Fittings, can be transported by road. Heaviest single packet that can
be transported by owner's trailor is about 60 MTs.
components
0
36 System Resistance 0.35 C/W
37 Heat dissipation and cooling process Natural convection
38 Thermal Conductivity >3.0Watt/mK.
39 Thermal resistance 0.340 C –cm 2/watt
40 IEC applicable IEC 62321
ELECTRICAL
41 Input voltage 100V – 300V
- 13 -
S.No Parameters Details/Guaranteed value
42 Power factor >0.96
43 Input frequency 47 – 53 Hz
44 Driver Efficiency 96%
45 THD (Total Harmonic Distortion) <2.4%
46 Adjusting of the Luminaire The luminaire should have adjustable
inclination adopter for inclinations from 00 to 90 0.in order
to meet field requirements like effective
illumination can be achieved at various
heights by changing the inclination of the
luminaire.
47 Logo on the Luminaire Manufactures logo should be integrated in
the heat sink of the luminaire
Sl.
No. Parameters Details/Guaranteed value
1. Name of the manufacturer of the Light fitting offered
Complete Postal address with Fax And Phone numbers.
2. Name of the manufacturer of the LEDs that go in to the
light fitting offered with Complete Postal address with
Fax And Phone numbers
3. Names of the manufacturers of all the other components
that go in to the light fitting offered with Complete
Postal addresses with Fax And Phone numbers of all
these manufacturers.
LUMINAIRE
4. Output Luminous Flux of luminaire
5. Average Lux Level of luminaire
6. Beam Angle of luminaire
7. Uniformity
8. Photometric Curve
9. Material of Luminaire & Diffuser
10. Dimensions
11. Weight of the luminaire
12. Operating temperature
13. Adjusting of the luminaire inclination
14. Luminaire finishing colours
15. Body & lamp shade material
Working temperature.
17. Working humidity
- 14 -
18. Working life
19. Lamp’s efficiency
20. Fixture efficiency
21. Light Distribution curve /beam pattern
22. Lamp base
23. The highest light intensity angle
24. Electrical insulation class
25. Conformity with IP-65 fixtures
Sl.
No. Parameters Details/Guaranteed value
MCPCB
39. Operating temperature
40. Junction temperature of Electronic components
41. System resistance
42. Heat dissipation & cooling process
43. Thermal conductivity
44. Thermal resistance
45. IEC applicable
Electrical
- 15 -
46. Input voltage
47. Power Factor
48. Input frequency
49. Driver efficiency
50. THD (Total Harmonic Distortion)