KETERANGAN KONSESI BATUBARA
COAL CONCESSION PARTICULARS
Nama dan Alamat
Perusahaan
PT. Titian Utama Tanah Bumbu
Name & Address of
Company
Pemilik Perusahaan /
Konsesi
Teguh Ramadhani
Owner of Company /
Concession
Lokasi dan Perijinan Konsesi
Location / Details of Concession
Coal Mine License IUP Operasi Produksi
Nama dan lokasi konsesi Tamiang Layang, Barito Timur, Kalimantan
Tengah
Name & location of
concession
Kota/Desa terdekat & jaraknya dari Tamiang Layang
tambang
Town/village nearby & its distance from
mines
Nearest Airport / Sea port to Banjarbaru - South
mine site Kalimantan
Other mine related
documents
1. Site Map
2. ROA
Ukuran dan Luas Konsesi
Size and Extent of Concession
Luas konsesi
798 Ha [Seven hundreds Ninty Eight hectare]
Area of concession
Arah dan panjang
20 -25 [North] / 3 km
Strike direction & length
Jumlah singkapan & arah
Outcrops amount and Many
direction
Titik Koordinat
-
Coordinate point
Coal Seam details Thickne Min 0,8 m Max 1.8
ss m
Dip 15o 30o
Strike Length Min 500 m Max
3.000 m
Detail Pemboran
Drilling Details
Luas area yang diliputi oleh
pemboran 400 ha
Area covered by core drill
Jumlah lubang yang dibor 15
Number of holes drilled
Kedalaman lubang
500 m
Depth of holes
Pola pemboran
Cross line [on strike / back strike] & cutting & open hole
Drilling grid pattern
Jumlah meter pemboran
Coring Hole 2 bor holes
Total depth drilled
Estimasi deposit
2.000.000 MT
Estímate deposite depth
Detail Port
Port Details
Lokasi Dermaga / Barging
Point Min Draft 8,0 m
Barging / Jetty point
Nama tempat
Telang Baru, Tamiang Layang
Name of the place
Nama sungai
Barito River
Name of the river
Jarak dari tambang
60 km to Port
Distance from mine
Kapasitas / Ukuran Pontoon
300 feet barge
Barge capacity / size
Pelabuhan / Transshipment
terdekat
Taboneo, South Kalimantan
Nearest port /
transshipment
Nama & lokasi pelabuhan
BNJM Port
Name & location of port
Jarak dari Barging point
150 km Telang Baru to Taboneo
Distance from Barging point
Kapasitas / Tongkang
8.000 mt / 300 FT
Capacity / Barge
Additional details about barge 12 hours to Vessel Anchorage
loading
vessel loading port
Kualitas Batubara
Quality of Coal
Nilai kalori (adb) Min 6.500 Max 7.200
Caloric value
Kandungan abu (adb) Max
Min 9.10 12.0
Ash content
Kandungan air (arb) Min 03.00 Max 03.90
Total Moisture
Kandungan belerang (ADB) Max
Total Sulfur Min 0.80 1.5
Data Lapisan Batubara
Coal Seam Data
Nama formasi batubara
Name of coal bearing Tanjung Formation
formation
Jumlah lapisan
5 (four) Main Seam
Number of coal seams
Ketebalan dari masing2
lapisan 0,8 m; 1,0; 1,2; 1;5; 1,8 m
Each seam thickness
Rasio potongan 1 : 10
Stripping ratio
Others Data
Data Penunjang Lain
Status of Land
Area Penggunaan Lain
Status Lahan
Lebar jalan
12 - 15 Meter
Road width
Target Sales 1. Export Sales
2. Domestic Sales ( Cement, Power
Plant )
3. Local Sales ( Cement Conch, Tanjung Kalimantan
Selatan, Dist. 60 KM )
RKAB
Document to be released 2016
RKTTL 2016
KOORDINAT DAN GEOLOGY MAP PT. TUTB
No. South East
1 1 53 08.3 115 18 55.0
2 1 53 08.3 115 19 03.0
3 1 53 34.0 115 19 03.0
4 1 53 34.0 115 19 52.0
5 1 53 44.0 115 19 52.0
6 1 53 44.0 115 20 00.9
7 1 54 30.9 115 20 00.9
8 1 54 30.9 115 19 40.0
9 1 55 58.5 115 19 40.0
10 1 55 58.5 115 19 26.0
11 1 55 30.0 115 19 26.0
12 1 55 30.0 115 19 00.0
13 1 55 00.0 115 19 00.0
14 1 55 00.0 115 18 40.0
15 1 54 29.9 115 18 40.0
16 1 54 29.9 115 18 20.0
17 1 54 00.0 115 18 20.0
18 1 54 00.0 115 18 55.0