0% found this document useful (0 votes)
10K views2 pages

Penal Action For UC

Penal Action for UC

Uploaded by

Raghu
Copyright
© Public Domain
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
10K views2 pages

Penal Action For UC

Penal Action for UC

Uploaded by

Raghu
Copyright
© Public Domain
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
PHONE:086645-295696 EMAIL! dtcp,ap@omall.com GOVERNMENT OF ANDHRA PRADESH Town and Country Planning Department To From : The Director of Town and The Commissioners of D. wee hom capital Municipal Corporations/ AE rt mengelaalt Municipalities/Nagar Panchayats Guntur District- 522 508. LrRoc,No, 6424/2019/P, dt. 25-08-2020 Sir, sub; O/o DT&CP, AP, Mangalaciri — Action on Unauthorised Constructions - Penal Actional against the unauthorised Buildings under provisions of AP Building Rules — Action taken Report ~ Called for-Reg. Ref:- 1) This Office Lr.Roc.No.6424/2019/P, dt. 13.11.2019. -BRRRER- The attention of Commissioners of all the Urban Local Bodies in the State is invited to the provisions of Rule 3; Sub Rule 33(J) of AP Building Rules issued in G.O.Ms.No.119 MA., dt. 28.03.2017 where in “the functional/line agencies dealing with electric power, water supply, drainage and sewerage shall not give regular connections to the buildings unless occupancy certificate is produced, or alternatively may charge 3 times the tariff till such time occupancy certificate is produced, This condition shall also be applicable to = unauthorised constructions and buildings constructed without ‘sanctioned building plan. In addition to the above, the Local Body shall collect every year two times the property as Penalty from the ; Pp tax enal Further, this office In the reference cited has requested the Commissioners of ers all the Urban Local Bodies to strict! ly implement thi ae @ enforcement actions as per i ce Se ciel TS File No.MAU03-17/41 0/2019-PLG-DOTCP It is therefore requested to furnish the details of penalties levied for the unauthorised constructions and buildings constructed in deviation to approved plans in respect of property tax, water supply charges, drainage charges etc. under provisions of AP Building Rules in the Proforma enclosed. This shall be treated as urgent. Yours faithfully, DIRECTOR OF TOWN AND COUNTRY PLANNING. Encl: Proforma. Copy to all RDDDTPs/DTCPOs with instructions to collect the informatio D n from th Urban Local Bodies of their respective Region and submit immediately. Copy to all RDMAs for information and necessary action. Copy to the C&DMA, AP, Guntur for favaour of information.

You might also like