Mto Recycle CGS-3

This document provides a cost estimate for procurement of materials for a recycle line project for a client. It lists 22 items needed including pipes, flanges, elbows, reducers, valves, and other fittings. The total cost is estimated at 171,510,650 Indonesian Rupiah. The document provides specifications for each item referring to appropriate API, ASME, or other standards. It is signed by the Project Manager and General Manager with the date of November 15, 2022 in Jakarta.

Uploaded by

Wandi Tok
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views1 page

Mto Recycle CGS-3

This document provides a cost estimate for procurement of materials for a recycle line project for a client. It lists 22 items needed including pipes, flanges, elbows, reducers, valves, and other fittings. The total cost is estimated at 171,510,650 Indonesian Rupiah. The document provides specifications for each item referring to appropriate API, ASME, or other standards. It is signed by the Project Manager and General Manager with the date of November 15, 2022 in Jakarta.

Uploaded by

Wandi Tok
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Pengadaan : MTO Recycle Line CGS-3

Project : Project Penyesuaian Pompa Rokan


Client : PT Pertamina Gas
Harga Perhitungan Sendiri (HPS)

Owner Estimate (OE)

Unit Price Total


NO ITEM Qty UoM
(IDR) (IDR)
1 2" PIPE SMLS CS BE SCH.20 API 5L GR.B, ASME B36.10 2 M Rp 517.500 Rp 1.035.000
2 6" PIPE SMLS CS BE SCH.40 API 5L GR.B, ASME B36.10 6 M Rp 1.822.060 Rp 10.932.360
3 6" FLANGE 300# RFWN BW SCH. 40 A105, ASME B16.5 5 EA Rp 887.800 Rp 4.439.000
4 2" FLANGE 300# RFWN BW SCH. 80 A105, ASME B16.5 4 EA Rp 321.770 Rp 1.287.080
5 6" ELBOW 90 DEG LR BW CS SCH. 40 A 234 WPB, ASME B16.9 1 EA Rp 1.625.065 Rp 1.625.065
6 6" ELBOW 45 DEG BW CS SCH. 40 A 234 WPB, ASME B16.9 3 EA Rp 1.078.700 Rp 3.236.100
7 6" x 3" CONC. RED BW CS SCH.40 X SCH.40 A 234 WPB, ASME B16.9 2 EA Rp 1.482.235 Rp 2.964.470
8 3" x 2" CONC. RED BW CS SCH.40 X SCH.80 A 234 WPB, ASME B16.9 2 EA Rp 264.040 Rp 528.080
9 6" x 3/4" 6000# SOCKOLET CS A 105 5 EA Rp 529.230 Rp 2.646.150
10 3/4" 6000# THRADOLET THRD CS A 105 1 EA Rp 529.230 Rp 529.230
11 3/4" -6000# HEX HEAD PLUG A-105 THR'D 1 EA Rp 188.600 Rp 188.600

6" GASKET-300# SPWD METALIC GRAPHITE FILLER 316 L WINDING NO INNER RING,
12 EA Rp 747.500 Rp 4.485.000
CS CENT. RING ASME B16.20 6
2" GASKET -#300 RF SPIRAL WOUND GRAPHITE FILLED 4.4MM THK INNER/OUTER
13 EA Rp 259.900 Rp 1.559.400
RINGS SS316L ASME B16.20 6
3/4"x125mm STUDBOLT A 193 GR.B7 & HEAVY NUTS A194 GR. 2H C/W WASHER
14 EA Rp 114.343 Rp 1.372.120
FLUOROCARBON COATED,ASME B18.2.1/B18.2.2 (for 6"-300#) 12
3/4"x160mm STUDBOLT A 193 GR.B7 & HEAVY NUTS A194 GR. 2H C/W WASHER
15 EA Rp 114.343 Rp 2.744.240
FLUOROCARBON COATED,ASME B18.2.1/B18.2.2 (for 6"-300#) FOR RO 24
5/8"x95mm STUDBOLT A 193 GR.B7 & HEAVY NUTS A194 GR. 2H C/W WASHER
16 EA Rp 195.500 Rp 6.256.000
FLUOROCARBON COATED,ASME B18.2.1/B18.2.2 for (2"-300#) 32
7/8"x120mm STUDBOLT A 193 GR.B7 & HEAVY NUTS A194 GR. 2H C/W WASHER
17 EA Rp 195.500 Rp 4.692.000
FLUOROCARBON COATED,ASME B18.2.1/B18.2.2 for ( 10"-150#) 24

18 6" RO-001 /002 EA Rp 9.200.000 Rp 18.400.000


2

19 3/4" PI-001 & PI-002 EA Rp 9.288.939 Rp 37.155.755


4

20 2" GLOBE VALVE 300# A 216 WCB OR 105 WNRF AS PER DATA SHEET EA Rp 8.395.000 Rp 16.790.000
2

21 10" CHECK VALVE 150# A 216 WCB OR 105 WNRF AS PER DATA SHEET EA Rp 39.445.000 Rp 39.445.000
1
3/4" GATE VALVE 800#, A105 BODY & BONNET, ASTM A182-F6A + 11.5-13.5% Cr TRIM,
22 API 602 DESIGN, SW c/w A106B Sch.160 NIPPLE 100MM x NPTF, REFER TO DOC. EA Rp 1.840.000 Rp 9.200.000
PMRK-PPR-00-PIP-DTS-002 DATA SHEET FOR MANUAL VALVE 5
Total Rp 171.510.650

Jakarta, 15 November 2022 Jakarta, 15 November 2022


Project Manager, EPC & Operation Maintenance General Manager, EPC & Operation Maintenance

Herliansyah Rudiawan