Republic of the Philippines Restos
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES 9 a
Mabini Campus, Anonas St,, Santa Mesa, Manila 1106
SQ THECOUNTRY’S F* POLYTECHNIC UNIVERSITY
REQUEST FOR QUOTATION
The Polytechnic University of the Philippines (PUP) - Bids and =~
& Awards Committee (BAC) will undertake a Shopping for the ©
Procurement of Various Cleaning Supplies and Materials for FY 2022.) ©
in accordance with Section 53 of the 2016 Revised Implementing Rules and =
Regulations of Republic Act No. 9184. The Approved Budget for the Contract
(ABC) is One Hundred Fifty-Seven Thousand Three Hundred Ninety-
Two Pesos and Seventy Centavos (PhP157,392.70).
Estimated Timeline
Estimated Delivery Period . December 2022 onwards
Estimated Payment Period * December 2022 onwards
AdOO GFTIONIN
Please quote your best offer for the item described herein, subject to
the Terms and Conditions provided at the last page of this Request for
Quotation (RFQ). Submit your quotation duly signed by you or your duly
authorized representative not later than _DEC 02 202 10:00 A.M. at
_ the Procurement Management Office, Room 318 South Wing, PUP A.
Mabini Campus, Anonas St., Santa Mesa, Manila. Open submission may be
© submitted, manually or through email at the address and contact numbers
indicated below.
amu!
Copies of the following documents, in its valid and updated versions,
are required to be submitted along with your signed quotation, to wit:
8
8
3
1. Business or Mayor's Permit;
2. PhilGEPS Registration Number;
3. Income or Business Tax Return;
x 4, Notarized Omnibus Sworn Statement for this particular
8 procurement project;
5. Net Financial Contracting Capacity (Sec. 53.2, 53.3.2, and 53.4); ©
and 8
g
Failure to submit any or all of the foregoing documents may result to the ©
© automatic disqualification of the quotation.
For inquiries, feel free to contact us at (02) 5335-1774 / (0960)249-
8568 or email us at_procurementoffice@pup.edu.ph.
8
Sg
8
a0:
Ween al MIR
BAC Chairman
Ad09
I,
Page 1 of 6Republic of the Philippines PUPREFOGPRVDAOS
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES 2.6 srs
Mabini Campus, Anonas St, Santa Mesa, Manila 1106
SNE tHe COUNTRY’S F POLYTECHNIC UNIVERSITY
ERMS and CONDI
‘Suppliers shall provide correct and accurate information in this form
Price quotation/s must be valid for a period of thirty (30) calendar days from the date
of submission.
Price quotation/s, to be denominated in Philippine peso shall include all taxes, duties
and/or levies payable.
Quotations exceeding the Approved Budget for the Contract shall be rejected outright
‘Award of contract shall be made to the lowest calculated and responsive quotation (for
goods and infrastructure) ot, the highest rated offer (for consulting services) which
complies with the minimum ‘technical specifications and other terms and conditions
stated herein.
6. Contracts, in the form of a purchase order, agreement, or any memorandum, shall be
duly signed or received within five (5) days from the receipt of the Notice of Award by
the supplier, through its authorized representative/s. Otherwise, failure to receive the
contract shall be a ground for the cancellation of the award.
7. The Notice to Praceed shall, likewise, be duly signed and received within five (5) days
from the receipt of the contract, by the supplier, through ts authorized
representative/s. Otherwise, failure to receive the Notice to Proceed shall be a ground
for the cancellation of the contract. However, in cases where the contract specifies a
condition for its implementation, the Notice to Proceed must be duly signed and
received within five (5) days from the satisfaction of the condition and the issuance of
the Notice to Proceed.
g
8. Any interlineations, erasures or overwriting shall be valid only if they are signed or
initialed by you or any of your duly authorized representative/s.
= 9. The item/s shall be delivered according to the requirements specified in the Technical
Specifications.
aT.
09
10. The UNIVERSITY shall have the right to inspect and/or to test the goods to confirm
their conformity to the technical specifications.
Ae
11, In case two or more suppliers are determined to have submitted the Lowest Calculated
Quotation/Lowest Calculated and Responsive Quotation, the GPPB-TSO shall adopt and
employ "draw lots” as the tie-breaking method to finally determine the single winning
> provider in accordance with GPPB Circular 05-2005.
12. Supplier shall guarantee his deliveries to be free from defects. Any defective item(s) /
Product(s), therefore that may be discovered by the UNIVERSITY within three (3)
‘months after acceptance of the same, shall be replaced by the supplier within seven (7)
calendar days upon receipt of a written notice to that affect. Warranty period shall be
= three (3) months, in case of Expendable Supplies, or one (1) year, in case of Non-
expendable Supplies. Warranty shall be covered by, at the Supplier’s option, either
retention money in an amount equivalent to at least five percent (5%) of every
progress payment, or a special bank guarantee equivalent to at least five percent (5%)
of the Contract Price. The said amounts shall only be released after the lapse of the
warranty period; provided however, that the supplies delivered are free from patent and
latent defects and all the conditions imposed under this contract have been fully met.
0907
13. Payment shall be processed after delivery and upon the submission of the required
supporting documents, in accordance with existing accounting rules and regulations.
Please note that the corresponding bank transfer fee, if any, shall be chargeable to the
contractor's account.
14. The performance security may be released by the UNIVERSITY after the issuance of the
Certificate of Final Acceptance, subject to the fallowing conditions:
a. UNIVERSITY has no claims fled against the supplier or the surety company
.Tehas no claims for labor and materials fled against the CONTRACTOR; and
c. Other terms of the contract. [Section 39.5 of the 2016 RIRR of Republic Act No. 9184
(RA. No, 9184) otherwise known as the "Government Procurement Reform Act]
Page 2 of 6POLYTECHNIC UNIVERSITY OF THE PHILIPPINES F244 zon
Mabini Campus, Anonas St., Santa Mesa, Manila 1106
THE COUNTRY’S F*' POLYTECHNIC UNIVERSITY
15. If delays are likely to be incurred, the supplier must notify the UNIVERSITY in writing,
It must state therein the cause/s and duration of the expected delay. The UNIVERSITY
may grant time extensions, at its discretion, if based on meritorious grounds, with or
‘without liquidated damages. In all cases, the request for extension should be submitted
before the lapse of the original delivery date. The maximum allowable extension shall
not be longer than the initial delivery period as stated in the original contract. (Manual
of Procedures for the Procurement of Goods and Services)
. All deliveries by the supplier shall be subject to inspection and acceptance by the
UNIVERSITY. The UNIVERSITY reserves the right to reduce the price in case of non-
conformity of the product(s)/item(s) with the technical specifications reflected in the
purchase order.
|. If the supplier fails to deliver any or all of the items within the period(s) specified in
the purchase order, the UNIVERSITY shall, without prejudice to its other remedies
under this agreement and under applicable laws, be entitled to liquidated damages, 2
sum equivalent to one-tenth of one percent of the total amount of the undelivered
items for each day of delay. Once the cumulative amount of the liquidated damages
reaches ten percent (10%), the UNIVERSITY may rescind or terminate the agreement,
without prejudice to other courses of action and remedies available under the
circumstances. (IRR-A Section 68, Annex “D" of R.A. No. 9184)
‘The UNIVERSITY shall terminate the contract for default when any of the following
conditions attend its implementation:
t
8. There being no force majeure, the supplier fails to deliver any or all of the goods
within the periog(s) specified in the contract, or within any extension thereof
granted by the UNIVERSITY pursuant to a request made by the supplier prior to
the delay, and such failure amounts to at least ten percent (10%) of the contract
price;
b. As a result of force majeure, the supplier Is unable to deliver or perform any or all
Of the goods or services, amounting to at least ten percent (10%) of the contract
price, for @ period of not less than sixty (60) calendar days after the receipt of the
fotice from the UNIVERSITY stating that the circumstance of force majeure is
deemed to have ceased
© The supplier fails to perform any other obligation(s) under the contract; or
4d. The supplier, in the judgment of the UNIVERSITY, has engaged. in corrupt,
fraudulent, collusive or coercive practices in competing for or in executing the
contract. (Paragraph III, Annex "I" of the 2016 IRR of R.A. No. 9184)
c
The UNIVERSITY reserves the right to impose administrative penalties upon the
supplier when he commits any of the acts which constitute as an offense or violation
under Section 69, Article XXIII of Republic Act No. 9184. Likewise, in addition to the
foregoing penalties, the UNIVERSITY reserves its right to blacklist the supplier for
offenses or violations committed during competitive bidding and contract
implementation, pursuant to the Uniform Guidelines for Blacklisting or Manufacturers,
Suppliers, Distributors, Contractors, and Consultants. (Appendix 17 of R.A. No. 9184)
|. Any and all disputes arising from this Contract shall be amicably settled by the Parties.
For unsettled disputes, the same shall be submitted to arbitration in accordance with
the provisions of Republic Act No. 876, otherwise known as the “Arbitration Law” and
R.A. No. 9285 otherwise known as the “Alternative Dispute Resolution Act of 2004”.
(Section 59 of the 2016 RIRR of R.A. No. 9184). The arbitral award shall be final and
binding upon the parties and may be enforced before a court of competent jurisdiction.
Page 3 of 6
Republic of the Philippines PUP-REFOS PRU.
8
8
a
2.|; POLYTECHNIC UNIVERSITY OF THE PHILIPPINES 2. a
Mabini Campus, Anonas St, Santa Mesa, Manila 1106
THE COUNTRY’S F POLYTECHNIC UNIVERSITY
Solicitation Number SHO-22-0.443
Project Identification No.
Name of the Project Procurement of Various
Cleaning Supplies and
Materiales ae
Location of the Project PUP Sta, Mesa, Manila
a November 23, 2022
Quotation No. 2-22-09-363
Name of Company
‘Address
TIN
PhilGEPS Registration Number
INSTRUCTIONS
Accomplish this RFQ correctly, accurately and completely.
Do not alter the contents of this form in any way.
All technical specifications are mandatory. Failure to comply with any of the
mandatory requirements will disqualify your quotation.
Failure to follow these instructions will disqualify your entire quotation.
Suppliers shall submit the original brochures showing certifications of the
products being offered.
Sir/Madam:
After having carefully reading and accepting the Terms and Conditions in this
Request for Quotation, I/We hereby provide my/our quotation for the item/s as
follows:
TE! L SPECIFICATION
. Please quote your best offer for the item/s below. Please do not leave any
blank items. Indicate “0” if the item/s is/are being offered for free,
. The quotes prices should be inclusive of all costs and applicable taxes.
3. If the space below is not sufficient, you may attach a separate sheet and
index it as “Annex A”, It shall be submitted along with this document.
Procurement of Various Cleaning Supplies and Materials
Item | Unit Description Quantity | Unit Price | Remarks
No.
a._| piece [AIR Freshener, aerosol, 280mi/150gmin | __200
2._| piece | Broom, soft (tambo) 60.
piece | Broom, Stick (Ting-Ting), usable length: 50
3
760mm min Ei
4g, | bottle | Cleaner, Toilet Bowl and Urinal, 900mI-| 150 | P___
000ml cap Total Lot Price
5._| pack | Cleanser, Scouring Powder 150
Page 4 of 6
Republic of the Philippines PUP FEROS PRMOOOS
TOHINOD
Ad00 G:
FTTIOUNO:
Ad09 6:
2
OFTIOWIN
Ad
TIOWINO:
AdO9 :
11NOO
AdOO G3TION,Republic of the Philippines PUPREFA.6 PRIC-GOS
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES Ea. 6 201
Mabini Campus, Anonas St., Santa Mesa, Manila 1106 :
BZ! THE COUNTRY’S F POLYTECHNIC UNIVERSITY
| pack | Detergent Power, all purpose, 1kg. 100
7._| piece | Disinfectant Spray, Aerosol type 100
8.__| piece | Dustpan, non-rigid plastic 50
8._| can _| Floor Wax, Paste, Red 100
10._| piece _| Furniture Cleaner, aerosol type 150 3
a1. | piece | Mophandle, heavy duty 50 | 3
12._| piece_| Mophead, made of rayon 200 |
33._| pack | Rags, all cotton 150
14._| bundle | Scouring Pad 200
35. | piece | Wastebasket, non-rigid plastic 62 i
steneneess Nothing Follows **ereeee8 |
TOTAL COST
x 3
8 3
2 8
& ‘SCHEDULE OF REQUIREMENTS —_ 8
1. The delivery schedule stipulates hereafter the delivery date to the project |
site. }
2. If the space below is not sufficient, you may attach a separate sheet and
index it as “Annex B”, It shall be submitted along with this document.
Item No. | Description Total | Delivery
| [Quantity | Period
| |
= . og
S 5
5 8
© | Approved Budget for the Total Offered Quotation as
Contract (ABC) _
In words:
8
g
In figures: 3
3
Page 5 of 6ROLLED
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES 2.) 46 sy
Mabini Campus, Anonas St., Santa Mesa, Manila 1106 E
THE COUNTRY’S F POLYTECHNIC UNIVERSITY
[J NT DETAILS
Payment shall be made promptly through Landbank’s LODAP-ADA/Bank Transfer
facility after submission of the billing statement/invoice and upon fulfillment of
other obligations as stipulated in the contract as well as upon inspection and
acceptance of the goods by the end user.
Banking Institution
Account Number
‘Account Name
Branch
LEGAI FINA L RE!
1. Kindly state “Complied” or “Not Complied under the second column.
2. Under the third column, please indicate, with much accuracy, the permit
number, license number, registration number, ITR number, TCC number, as
the case may be.
3. Please do not leave any items blank. Write “N/A” when it is not applicable in
your case.
‘Statement of
‘Compliance
Date of Tssuance | Date of Expiration oF
Document or Filing Valiclty
Number
1 | Mayor's or Business
Permit
2 | PhIIGEPS Reaistration
Number
3 | Income or Business,
Tax Return
Notarized Omnibus
Sworn Statement
5 | Net Financial
Contracting Capacity
Conforme:
‘Signature over Printed Position or Designation Date
Name
Office Telephone Number Fax or Mobile Number Email Address/es
Page 6 of 6
PUP-REFO-6PRVO.05
Ad09 GFTIONLNOD
g
a
AdOO