CADANGAN MEROBOH DAN MEMBINA SEMULA RUMAH SESEBUAH 1
TINGKAT SEDIADA KEPADA RUMAH SESEBUAH 2 TINGKAT DI
KAMPUNG TASIK AMPANG
FINAL SUMMARY OF TENDER
Item Description Amount (RM)
1 Preliminaries
2 Piling Works (All Provisional)
3 Main Building Works
4 External Works
Tender Sum
PRELIMINARIES
Item Description Unit Qty Rate Amount (RM)
A Generally
B Definitions
C Location of Site and Visit to Site
D Scope of Works
E Form of Contract
F Appendix to the Conditions of Contract
G Temporary Lighting and Power Supply
H Temporary Hoarding and Gates
I Temporary Access Roads
J Temporary Drains, Silt Trap and Washing Tyres of
Vehicles
K Project Signboard
L Site Security, Safeguarding the Works and Watching
M Temporary Water Supply
N Discrepancies in Drawings
O Site Supervisory Staff
P Insuring the Works
Q Plant and Equipment
R Construction Industry Development Board Levy
S Setting Out
T Programme and Progress Charts
U Existing Services
V As-Built Drawings
Carried Forward
Item Description Unit Qty Rate Amount (RM)
Brought Forward
W Progress Reports and Progress Photographs
X Safety, Health and Welfare of Workmen and Fire
Regulations
Y Standard Operating Procedures (SOP)
Z Mosquito Prevention
AA Site Meetings
AB Interim Progress Payment
AC Sait Facilities
AD Clearing of Site and Clearing of Building, etc.
AE Any Other Items
i)
ii)
iii)
Total Preliminaries Carried to Final Summary
PILING WORKS
Item Description Unit Qty Rate Amount (RM)
Total Piling Works (All Provisional) Carried to Final Summary
MAIN BUILDING WORKS
Item Description Unit Qty Rate Amount (RM)
Item Description Unit Qty Rate Amount (RM)
Element 1 - Work Below Lowest Floor Finish Carried to Summary
Item Description Unit Qty Rate Amount (RM)
Element 2 - Frame Carried to Summary
Element 3 - Upper Floor Carried to Summary
Element 4 - Flat Roof Construction Carried to Summary
Item Description Unit Qty Rate Amount (RM)
Element 5 - Roof Covering and Rainwater Goods Carried to Summary
Item Description Unit Qty Rate Amount (RM)
Element 6 - Staircase, Staircase Finishes Carried to Summary
Element 7 - External Wall Carried to Summary
Element 8 - Doors Carried to Summary
Item Description Unit Qty Rate Amount (RM)
Element 9 - Windows Carried to Summary
Element 10 - Internal Wall Carried to Summary
Element 11 - Internal Floor Finishes Carried to Summary
Item Description Unit Qty Rate Amount (RM)
Element 12 - Internal Wall Finishes Carried to Summary
Element 13 - Internal Ceiling Finishes Carried to Summary
Item Description Unit Qty Rate Amount (RM)
Element 14 - External Finishes Carried to Summary
Element 15 - Sanitary Fittings Carried to Summary
Element 16 - Electrical Installation Carried to Summary
Item Description Unit Qty Rate Amount (RM)
i)
ii)
iii)
Element 17 - Plumbing and Sanitary Installation Carried to Summary
Item Description Unit Qty Rate Amount (RM)
Summary
1 Work Below Lowest Floor Finish
2 Frame
3 Upper Floor
4 Flat Roof Construction
5 Roof Covering and Rainwater Goods
6 Staircase, Staircase Finishes and Handrailing
7 External Wall
8 Doors
9 Windows
10 Internal Wall
11 Internal Floor Finishes
12 Internal Wall Finishes
13 Internal Ceiling Finishes
14 External Finishes
15 Sanitary Finishes
16 Electrical Installation
17 Plumbing and Sanitary Installation
Total Main Building Works Carried to Final
Summary
EXTERNAL WORKS
Item Description Unit Qty Rate Amount (RM)
Element 1 - Demolition and Site Clearance Carried to Summary
Element 2 - Road Works Carried to Summary
Element 3 - Surface Water Drainage Carried to Summary
Element 4 - Fencing and Gates Carried to Summary
Item Description Unit Qty Rate Amount (RM)
Element 5 - External Sewerage Works Carried to Summary
Element 6 - Miscellaneous Carried to Summary
Summary
1 Demolition and Site Clearance
2 Road Works
3 Surface Water Drainage
4 Fencing and Gates
5 External Sewerage Works
6 Miscellaneous
Total External Works Carried to Final Summary