This document provides a tie-in chart for an 8-inch pipeline project between Shikrapur and Wagholi in Pune, India. The chart outlines the planned activities along two sections of the pipeline, KM-01 and KM-02, including welding, testing, coating, trenching, lowering, backfilling and other notes. It identifies the project client as Torrent Gas and contractor as Chandrama Services.

Uploaded by

Saravanan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
220 views1 page

Tie in Chart

This document provides a tie-in chart for an 8-inch pipeline project between Shikrapur and Wagholi in Pune, India. The chart outlines the planned activities along two sections of the pipeline, KM-01 and KM-02, including welding, testing, coating, trenching, lowering, backfilling and other notes. It identifies the project client as Torrent Gas and contractor as Chandrama Services.

Uploaded by

Saravanan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TIE IN CHART - 8 INCH PIPELINE KM01&02

SHIKRAPUR - WAGHOLI PIPELINE PROJECT

PROJECT LAYING OF STEEL PIPELINE SERVICE FOR M/S TORRENT GAS ,PUNE

CLIENT M/S TORRENT GAS PVT LTD

TPIA M/S INTERNATIONAL CERTIFICATION SERVICE

CONTRACTOR M/S CHANDRAMA SERVICES


KM-01 MJ/TJ/GTJ T M M M T M M M T M M M T M M M M M T M M T M M M T M T M M T M M T M M T M M T M M T M M T M M T M M T M M T T T T T M T M M T M M T M T M T M M T M M T M M T M T M T M M T

KM-01 M/TJ/GTJ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38R 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 54A 54B 54C 54D 55 62 62AR 56 57 58RS 59RS 60 61 64 65 66 67 68 69 70 71 72 73 74 75 76 77R 78 79 80 81 82 83

WELDING

NDT

COATING

TRENCHING

LOWERING

BACKFILLING

MARBLE
REMARKS ALL ACTIVITY BALANCE OPEN CUT OPEN CUT S BEND UDIT PACKING HINDHUSTANI HOTEL - SWAGAT HOTEL SHOP

KM-02 MJ/TJ/GTJ M M M T M M T M M M T M M T M M T M M T M T M T M M M M T M M T M T M M M M M T M M T M M M T M M T M M T M M M T M M T M M T M T M M T M M T M M T M M T M M T M M T

KM-02 M/TJ//GTJ 1 2 3 4 5 6 7 8 9 10 11 12 13R 14R 15 16RS 17 18RS 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61R 61A 62 63 64 65R 66 67 68 69 70 71 72R 73 74 75 76 77 78 79 80 81 82

WELDING

NDT
DELETED

COATING

TRENCHING

LOWERING

BACKFILLING

HDD NALA HARD ROCK L&T PHATA


REMARKS CROSSING BREAKING PENDING ROAD CROASSING
ALL ACTIVITY BALANCE