INSPECTION AND TEST PLAN
ON-SHORE PIPELINE CERTIFICATION
Project     :   TRUNKLINE 6" FROM MT-L-8385 M.8 STATION TO MT-R-6205 M.6 STATION
Owner       :   PT. PERTAMINA HULU SANGA SANGA
User        :   PT.PUTRA TUNGGAL MANDIRITMA
Location    :   PHSS KALTIM
3rd Party Insp. :                                     Migas Letter assignment                              R           :              Review                                SW         :     Spot Witness
                                                      No. : -                                              S           :              Surveillance / Inspection             V          :     Verify
Project Ref. :                                        Tgl. : -                                             W           :              Witness Inspection                    H          :     Hold point
Project Duration :                                                                                         P           :              Perform & Provide                     N/A        :     Not Applicable
                                                                                                                                                                                                              Surveillance Inspection
                                                                                         Reference                                                                        Acceptance                                           3rd Party
  No                                    Activity
                                                                                         Document                          Documents required                               Criteria               PTM           PHSS        Insp. Comp.   MIGAS
   1    Document Review
           - QA / QC Procedure                                                  SNI-13-3474                    QA Manual, QC Procedure                            SNI-13-3474                        P             R             R
           - Construction procedure                                             Owner Spec.& SNI-13-3474       Construction Procedure                             Owner Spec.& SNI-13-3474           P             R             R
           - Design basis
              a. Pipeline routing, incl. ROW                                    Owner Spec.& 300K              Design document                                    Owner Spec.& 300K                 N/A            P             R
              b. Physical and chemical characteristics of fluid                 Owner Spec.& SNI-13-3474       Design document                                    Owner Spec.& SNI-13-3474          N/A            P             R
              c. Material selection incl. Internal corrosion
                   assessment                                                   Owner Spec.& API Spec 5L       Design document                                    Owner Spec.& API Spec 5L          N/A            P             R
              d. Temperature / pressure profile                                 Owner Spec.& SNI-13-3474       Design document                                    Owner Spec.& SNI-13-3474          N/A            P             R
              e. Pressure containment (wall thickness calc.)                    Owner Spec.& SNI-13-3474       Calculation sheet                                  Owner Spec.& SNI-13-3474          N/A            P             R
              f. Pipeline expansion (if applicable)                             Owner Spec.& SNI-13-3474       Design document                                    Owner Spec.& SNI-13-3474          N/A            P             R
              g. Free span assessment (if applicable)                           Owner Spec.& SNI-13-3474       Design document                                    Owner Spec.& SNI-13-3474          N/A            P             R
              h. Lateral snaking assessment (if applicable)                     Owner Spec.& SNI-13-3474       Design document                                    Owner Spec.& SNI-13-3474          N/A            P             R
              I. Crossing design (if applicable)                                Owner Spec.& API 1102          Design document                                    Owner Spec.& API 1102             N/A            P             R
              j. Tie-in design (if applicable)                                  Owner Spec.& SNI-13-3474       Design document                                    Owner Spec.& SNI-13-3474          N/A            P             R
              k. Trenching assessment (if applicable)                           Owner Spec.& SNI-13-3474       Design document                                    Owner Spec.& SNI-13-3474          N/A            P             R
              l. Pig launcher / receiver design (if applicable)                 Owner Spec.& SNI-13-3474       Design document                                    Owner Spec.& SNI-13-3474           P             R             R
              m. Flange calculations (if applicable)                            Owner Spec.& ASME B16.5        Design document                                    Owner Spec.& ASME B16.5           N/A            P             R
              n. T-joints, valves, etc. (if applicable)                         Owner Spec.& SNI-13-3474       Design document                                    Owner Spec.& SNI-13-3474          N/A            P             R
            -   Pipeline drawings                                                                              Drawings                                                                              V             P             V
            -   WPS / PQR and Welder Certificate                                ASME IX / API 1104             WPS / PQR and Welder Certificate                   ASME IX / API 1104                 P             R             R
            -   NDT procedure and NDT personnel certificate                     ASME V / API 1104              NDT procedure and personnel certificate            ASME V / API 1104                  P             R             R
            -   Repair procedure                                                Owner Spec.& API 1104          Repair procedure                                   Owner Spec.& API 1104              P             R             R
            -   Hydrostatic test procedure                                      Owner Spec.& SNI-13-3474       Hydrostatic test procedure                         Owner Spec.& SNI-13-3474           P             R             R
            -   Cleaning, pigging, and drying procedures                        Owner Spec.& SNI-13-3474       Cleaning procedure                                 Owner Spec.& SNI-13-3474           P             R             R
            -   Safety devices and Instrumentation system                       Owner Spec.& SNI-13-3474       Data sheet, manufacturer certificate               Owner Spec.& SNI-13-3474           P             R             R
            -   Environmental protection and control system                     Owner Spec.& 84K               AMDAL / UKL-UPL report                             Owner Spec.& 84K                  N/A            P             R
            -   Corrosion control system
                a. Cathodic protection design report                            Owner Spec.& NACE              Design report                                      Owner Spec.& NACE                 N/A            P             R
                b. Anode manufacturing and installation spec.                   Owner Spec.& NACE              Design report                                      Owner Spec.& NACE                 N/A            P             R
                c. Coating manufacturing specifications                         Owner Spec.& NACE              Design specification                               Owner Spec.& NACE                 N/A            P             R
                d. Field joint coating specification                            Owner Spec.& NACE              Design specification                               Owner Spec.& NACE                 N/A            P             R
                e. Corrosion monitoring system specification                    Owner Spec.& NACE              Design specification                               Owner Spec.& NACE                 N/A            P             R
                f. Material take off / data sheets                              Owner Spec.& API Spec 5L       Data sheets                                        Owner Spec.& API Spec 5L          N/A            P             R
            -   Operation and maintenance procedure                             Owner Spec.& SNI-13-3474       Operation & maintenance procedure                  Owner Spec.& SNI-13-3474          N/A            P             R
                                                                                   INSPECTION AND TEST PLAN
                                                                                                     ON-SHORE PIPELINE CERTIFICATION
Project     :   TRUNKLINE 6" FROM MT-L-8385 M.8 STATION TO MT-R-6205 M.6 STATION
Owner       :   PT. PERTAMINA HULU SANGA SANGA
User        :   PT.PUTRA TUNGGAL MANDIRITMA
Location    :   PHSS KALTIM
3rd Party Insp. :                                     Migas Letter assignment                                R            :            Review                                SW         :     Spot Witness
                                                      No. : -                                                S            :            Surveillance / Inspection             V          :     Verify
Project Ref. :                                        Tgl. : -                                               W            :            Witness Inspection                    H          :     Hold point
Project Duration :                                                                                           P            :            Perform & Provide                     N/A        :     Not Applicable
                                                                                                                                                                                                                  Surveillance Inspection
                                                                                           Reference                                                                       Acceptance                                              3rd Party
  No                                     Activity
                                                                                           Document                            Documents required                            Criteria               PTM              PHSS        Insp. Comp.              MIGAS
   2    Site Inspection & Verification
            - On-shore Installation Preparation
                a. Pre-installation survey                                        Owner Spec.& SNI-13-3474       Inspection report, check list                     Owner Spec.& SNI-13-3474          P                   S               N/A
                b. Extent of preparation for crossings                            Owner Spec.& API 1102          Inspection report, check list                     Owner Spec.& API 1102             P                   S               N/A
            -   Pipeline Installation
                a. Pipeline material inspection & tracebility                     Owner Spec.& API Spec 5L       Material / Mill certificate                       Owner Spec.& API Spec 5L          P                  W                 R
                b. Pipeline route and ROW survey                                  Owner Spec.& 300K              Survey report                                     Owner Spec.& 300K                 P                R&S               R&S
                c. Repairs of damage to external & internal coat                  Owner Spec.& NACE              Repair procedure, inspection report               Owner Spec.& NACE                 P               R & SW             R&S
                d. Welding inspection (incl. Electrode & fit-up)                  ASME IX / API 1104             Inspection report, check list                     ASME IX / API 1104                P               R & SW            R & SW
                e. Non Destructive Testing process                                ASME V / API 1104              NDT procedure, NDT record                         ASME V / API 1104                 SW              R & SW            R & SW
                f. Excavation, welding and NDT of repairs                         Owner Spec.& SNI-13-3474       Procedure, Inspection report                      Owner Spec.& SNI-13-3474           H              R & SW            R & SW
                g . Field joints coating / insulation (if any)                    Owner Spec.& NACE              Coating procedure, calibration cert., report      Owner Spec.& NACE                 P               R & SW            R & SW
                h. Pipe lowering activities                                       Owner Spec.& SNI-13-3474       Check list                                        Owner Spec.& SNI-13-3474          P                R&S              R & SW
                i. Tie-in (line-up and fit-up)                                    Owner Spec.& SNI-13-3474       Tie-in procedure / check list                     Owner Spec.& SNI-13-3474          P                R&S              R&W
                j. Trenching                                                      Owner Spec.                    Trenching report                                  Owner Spec.                       P                R&S              R & SW
                k. Safety devices and instrument inspection                       Owner Spec.                    Inspection report, check list                     Owner Spec.                       P                R &W             R&W
   3    Testing and Commissioning
        - Pigging and cleaning / Check gauge plate                                Owner Spec.& SNI-13-3474       Pigging inspection report , check list            Owner Spec.& SNI-13-3474          P                R&W                 W
        - System pressure testing
           a. Water sampling                                                      Owner Spec.& SNI-13-3474       Sampling report                                   Owner Spec.& SNI-13-3474          P                  R                  V
           b. Inhibitors (if applicable)                                          Government Regulation &        Catalog product                                   Government Regulation &           P                  R                  V
                                                                                  Owner Spec.& Appl.code                                                           Owner Spec.& Appl.code
            c. Water filling                                                      Owner Spec.& 84K               Check list                                        Owner Spec.& 84K                  P                 R&S               SW
            d. Instrumentation and equipment calibration                          Owner Spec.& 84K               Calibration certificate                           Owner Spec.& 84K                  P                 R&S              V&H
            e. Pressure Test                                                      84K , Owner Spec &                                                               84K , Owner Spec &
                                                                                  SNI-13-3474                    Test procedure and report                         SNI-13-3474                       P                 R&H                H
            h. Dewatering and Cleaning                                            84 K & Owner Spec              Test procedure and report                         84 K & Owner Spec                 P                 R&S             R & SW
                                                                                  SNI-13-3474                                                                      SNI-13-3474
   4    Final Report
        - Installation data package / dossier                                     Owner Spec.& SNI-13-3474       QC Inspection report, document dossier            Owner Spec.& SNI-13-3474           P                  R                 R
        - Certificate / Result of inspection                                      84K                            QC Inspection report, document dossier            84K                               N/A                N/A                P
Note: This ITP has been discussed and approved by all parties concerned during Pre-inspection meeting
            Prepared by                                                         Review & Approved by ,                                     Review & Veryfied by,                                     Ditjen MIGAS
            PT.Putra Tunggal Mandiritama                                        PT.Pertamina Hulu Sanga Sanga                              PJIT
            ………………………………...                                                     ………………………………...                                            ……………………………………………......                                   ..................................................