PART
C- EARTHWORK Item 403- Metal Structures
Item 100- Clearing and Grubbing
Item 404- Reinforcing Steel
Item 101- Removal of Structures and Obstructions
Item 405- Structural Concrete
Item 102- Excavation
Item 406- Pre stressed Concrete Structures
Item 103- Structure Excavation
Item 407- Concrete Structures
Item 104- Embankment
Item 408- Steel Bridges
Item 105- Subgrade Preparation
Item 409- Welded Structural Steel
Item 106- Compaction Equipment and Density Control Strips
Item 410- Treated and Untreated Timber
Item 107- Overhaul
Item 411- Paint
Item 412- Elastomeric Bearing Pads
PART D- SUBBASE AND BASE COURSE
Item 413- Pre Molded Joint Filler for Concrete Paving and
Item 200- Aggregate Sub base Course Structural Construction
Item 201- Aggregate Base Course
Item 202- Crushed Aggregate Base Course PARTG-DRAINAGE AND SLOPEPROTECTION
STRUCTURES
Item 203- Lime Stabilized Road Mix Base Course
Item 500- Pipe Culverts and Storm Drains
Item 204- Portland Cement Stabilized Road Mix Base
Course Item 501- Under drains
Item 205- Asphalt Stabilized Road Mix Base Course Item 502- Manholes, Inlets and Catch Basins
Item 206- Portland Cement Treated Plant Mix Base Course Item 503- Drainage Steel Grating with Frame
Item 207- Aggregate Stockpile Item 504- Cleaning and Reconditioning Existing Drainage
Structures
Item 505- Riprap and Grouted Riprap
PART E- SURFACE COURSES
Item 506- Stone Masonry
Item 300- Aggregate Surface Course
Item 507- Rubble Concrete
Item 301- Bituminous Prime Coat
Item 508- Hand-Laid Rock Embankment
Item 302- Bituminous Tack Coat
Item 509- Sheet Piles
Item 303- Bituminous Seal Coat
Item 510- Concrete Slope Protection
Item 304- Bituminous Surface Treatment
Item 511- Gabions and Mattresses
Item 305- Bituminous Penetration Macadam Pavement
PART H- MISCELLANEOUS STRUCTURES
Item 306- Bituminous Road Mix Surface Course
Item 600- Curb and/or Gutter
Item 307- Bituminous Plant-Mix Surface Course-General
Item 601- Sidewalk
Item 308- Cold Asphalt Plant-Mix Item 602- Monuments, Markers and Guide Posts
Item 309- Bituminous Plant-Mix (Stockpile Maintenance
Mixture) Item 603- Guardrail
Item 310- Bituminous Concrete Surface Course Hot Laid Item 604- Fencing
Item 311- Portland Cement Concrete Pavement Item 605- Road Sign
Item 606- Pavement Markings
Item 607- Reflective Pavement Studs
PART F- BRIDGE CONSTRUCTION Item 608- Topsoil
Item 400- Piling Item 609- Sprigging
Item 401- Railings Item 610- Sodding
Item 402- Timber Structures Item 611- Tree Planting
Item 612- Reflective Thermoplastic Stripping Material (Solid
Form)
PART I- MATERIALS DETAILS
Item 700- Hydraulic Cement
Item 701- Construction Lime (Hydrated)
Item 702- Bituminous Materials
Item 703- Aggregates
Item 703A- Mineral Filler
Item 704- Masonry Units
Item 705- Joint Materials
Item 706- Concrete Clay, Plastic and Fiber Pipe
Item 707- Metal Pipe
Item 708- Chemical Admixtures For Concrete
Item 709- Paints
I t e m 7 1 0 - R e i n f o r c i n g S t e e l
a n d W i r e R o p e
Item 711- Fence and Guardrail
Item 712- Structural Metal
Item 713- Treated and Untreated Timber
Item 714- Water
Item 715- Geotextiles
Soil: Load-Bearing Value
A soil test is the only way to really know the
load-bearing value (LBV) of the soil for your
intended footers. But below is a guide to basic
soil types and their LBVs:
Bedrock: 12,000 (Pounds Per Sq. Foot)
Sedimentary rock: 6,000
Sandy gravel or gravel: 5,000
Sand, silty sand, clayey sand, silty
gravel, and clayey gravel: 3,000
Clay, sandy clay, silty clay, and clayey
silt: 2,000
Depth of Footings
Footings should extend to a minimum of
12" below undisturbed soil. Undisturbed soil is
soil that has never been turned over, tilled,
graded, hoed, or anything of that nature, by man
or machine.