The inspection test report summarizes checks performed on electrical equipment batteries prior to commissioning. Key checks included verifying documentation compliance, equipment tags, chassis stability, painting condition, electrolyte levels, interconnections, power connections, switch function, damages, cleanliness, ventilation, floor/wall coatings, earthing, manufacturer tags, vendor checks, and punch list items. Remarks and inspector signatures were also documented.

Uploaded by

wassim nasri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views1 page

Itr Ew 07a - Eng

The inspection test report summarizes checks performed on electrical equipment batteries prior to commissioning. Key checks included verifying documentation compliance, equipment tags, chassis stability, painting condition, electrolyte levels, interconnections, power connections, switch function, damages, cleanliness, ventilation, floor/wall coatings, earthing, manufacturer tags, vendor checks, and punch list items. Remarks and inspector signatures were also documented.

Uploaded by

wassim nasri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT Report No:

CLIENT
(Partner (Client Logo)
Logo) INSPECTION TEST REPORT Date:
Checks of Electrical Equipment
Ready for Precommissioning
Subcontractor: ITR-EW-07A
Reference QCP No: QCP phase:

Test Notification n°: Notification Date:

Equipment: ELECTRICAL EQUIPMENT Type: BATTERY SET Equipment Tag:

Equipment Designation: System Tag:

Manufacturer: Model: P&ID No.:

Voltage Ratio: Nominal Frequency: Nominal Power:

Data Sheet No.: Drawing No.:

Checks Description C NC NA
Check the equipment, verifying the compliance with the project documentation in last revision: P&I D, drawings,
1.
specifications, standards, etc.
2. Check that the tag of the equipment is correct and appropriate.
3. Check that the chassis of the battery set is stable and aligned.
4. Check that the internal and external painting is in satisfactory condition and does not need to be touched-up.
Check that the battery cells are all installed and the electrolyte level is correct. There are no leaks and all cell
5.
containers are intact.
6. Check that the electrolyte characteristics and physical data available
Check that the interconnections between battery elements and blocks are performed minimizing short circuit risks. All
7.
terminals are cleaned, tightened and with protection covers. The Battery blocks have identification tags.
8. Check that the power connections of the battery sets are complete (the ITR of all cables are filled-in and signed).
9. Check that the switch isolator of the battery set functions mechanically correct.
10. Check that there are no damages/deformations.
Check that the cleanliness of battery cells is satisfactory. The room containing the battery cells is clean and free from
11.
dust, debris, foreign matters (condition for battery cell inspection).
12. Check that the ventilation system of the battery room works properly.
Check that the floor and walls of the Battery Room are covered by a suitable layer of acid resistant coating / tiles. The
13.
drain pit is properly done.
Check that the earthing system is connected to earthing network and that the terminal on the equipment is well
14.
tightened.
Check that eventual tags of identification and/or instruction supplied by the manufacturer are properly installed and
15.
complete.
16. All checks recommended by the Vendor have been executed.
17. Check that Eventual defects/abnormalities have been entered in the Project Punch List.
18. Check that the final documentation for QCP has been completed and signed off.
19. Check that all modifications have been highlighted on the “Master Copy” drawings (as built).
Remarks:

C = Conformance; NC = Non Conformance; NA = Not Applicable;


Conform Test Instrument Used:

Not Conform – Report n°: Tag n°:

INSPECTORS SUBCONTRACTOR CONTRACTOR CLIENT AUTHORITY (if any)

Name:
Signature:
Date:
The information included in this document and any attachments are confidential and may also be privileged. Document and any attachments are property of ABB
SpA.: theirs reproduction, circulation and use without prior consent are forbidden.
P.1/1 Mod. ITR-EW-07A/0