1
2
                                       CERTIFICATE
This is to certify that CadetALI HAMZA Roll No:________has successfully completed the project Work
entitled HOSTEL MANAGEMENTin the subject Computer Science (083) laid down in the regulations of
CBSE for the purpose of Practical Examination in Class XII to be held in Sarvodaya Bal Vidyalaya, Rouse
Avenue on______________
Error! Not a valid embedded object.
Examiner: Name: _______________ Signature
                                                                                                    3
                        TABLE OF CONTENTS [ T O C ]
SER                               DESCRIPTION         PAGE NO
01    ACKNOWLEDGEMENT                                    04
02    INTRODUCTION                                       05
03    OBJECTIVES OF THE PROJECT                          05
04    PROPOSED SYSTEM                                    06
05    SYSTEM DEVELOPMENT LIFE CYCLE (SDLC)               07
06    PHASES OF SYSTEM DEVELOPMENT LIFE CYCLE            08
07    FLOW CHART                                         15
08    SOURCE CODE                                        16
09    OUTPUT                                             19
10    HARDWARE AND SOFTWARE REQUIREMENTS                 23
11    BIBLIOGRAPHY                                       24
                                                                4
                          ACKNOWLEDGEMENT
Apart from the efforts of me, the success of any project depends largely on the
encouragement and guidelines of many others. I take this opportunity to express my
gratitude to the people who have been instrumental in the successful completion of this
project.
     I would like to express my special thanks of gratitude to my teacher Mr. Manoj
Kumar Singh, who gave me golden.
opportunity to this wonderful project of English on Hostel Management and also help in
completing my project. I also came to know about management even more. I am really
thankful to them.
     I express my deep sense of gratitude to the Principal, Sarvodaya Bal Vidyalaya
who has been constantly motivating and extending their helping hands to us.
      I would also thank my parents and friends who helped me a lot in finalizing the
project within the limited time frame.
                                 PROJECT ON HOSTEL MANAGEMENT
                                          INTRODUCTION
        This project is based on management of hostels, such as information about the students such as his/her
college ID, in which department they belong to, etc.These information can be stored in the data and can be verified
whenever we want. This computer programme can be used for hostels schools etc.
                                                                                                                      5
                                  OBJECTIVES OF THE PROJECT
The objective of this project is to let the students apply the programming knowledge into a real- world
situation/problem and exposed the students how programming skills helps in developing a good software.
    1. Write programs utilizing modern software tools.
    2. Apply object oriented programming principles effectively when developing small to medium sized projects.
    3. Write effective procedural code to solve small to medium sized problems.
    4. Students will demonstrate a breadth of knowledge in computer science, as exemplified in the areas of
        systems, theory and software development.
    5. Students will demonstrate ability to conduct a research or applied Computer Science project, requiring
        writing and presentation skills which exemplify scholarly style in computer science.
PROPOSED SYSTEM
Today one cannot afford to rely on the fallible human beings of be really wants to stand against today’s merciless
competition where not to wise saying “to err is human” no longer valid, it’s out-dated to rationalize your mistake.
So, to keep pace with time, to bring about the best result without malfunctioning and greater efficiency so to replace
the unending heaps of flies with a much sophisticated hard disk of the computer.
One has to use the data management software. Software has been an ascent in atomizationvarious organisations.
Many software products working are now in markets, which have helped in making the organizations work easier and
efficiently. Data management initially hadto maintain a lot of ledgers and a lot of paperwork has to be done but now
software production this organization has made their work fasterand easier. Now only this software has to beloaded
on the computer and work can be done.
                                                                                                                       6
This prevents a lot of time and money. Thework becomes fully automated and any information regarding the
organization can beobtained by clicking the button.
Moreover, nowit’s an age of computers of and automatingsuch an organization gives the better look.
SYSTEM DEVELOPMENT LIFE CYCLE (SDLC)
                                                                                                           7
The systems development life cycle is a projectmanagement technique that divides complexprojects into smaller,
more easily managed segments or phases. Segmenting projectsallows managers to verify the successfulcompletion of
project phases before allocatingresources to subsequent phases.
Software developmentprojects typically include initiation, planning,design, development, testing,
implementation,and maintenance phases. However, the phasesmay be divided differently depending on
theorganization involved.
For example, initialproject activities might be designated as request, requirements-definition, and planningphases, or
initiation, concept-development,and planning phases. End users of the systemunder development should be involved
inreviewing the output of each phase to ensurethe system is being built to deliver the neededfunctionality.
                              PHASES OF SYSTEM DEVELOPMENT LIFE CYCLE
INITIATION PHASE
The Initiation Phase begins when a business sponsor identifies a need or an opportunity.
The purpose of the Initiation Phase is to:
       Identify and validate an opportunity to improve business accomplishments of the organization or a deficiency
         related to a business need.
       Identify significant assumptions and constraints on solutions to that need.
       Recommend the exploration of alternative concepts and methods to satisfy the need including questioning the
        need for technology, i.e., will a change in the business process offer a solution?
       Assure executive business and executive technical sponsorship. The Sponsor designates a Project Manager and
        the business need is documented in a Concept Proposal. The Concept Proposal includes information about
        the business process and the relationship to the Agency/Organization.
       Infrastructure and the Strategic Plan. A successful Concept Proposal results in a Project Management Charter
         which outlines the authority of the project manager to begin the project.
Careful oversight is required to ensure projects support strategic business objectives and resources are effectively
implemented into an organization's enterprise architecture. The initiation phase begins when an opportunity to add,
improve, or correct a system is identified and formally requested through the presentation of a business case. The
business case should, at a minimum, describe a proposal’s purpose, identify expected benefits, and explain how the
proposed system supports one of the organization’s business strategies. The business case should also identify
alternative solutions and detail as many informational, functional, and network requirements as possible.
                                                                                                                       8
SYSTEM CONCEPT DEVELOPMENT PHASE
The System Concept Development Phase begins after a business need or opportunity is validated by the
Agency/Organization Program Leadership and the Agency/Organization CIO.
The purpose of the System Concept Development Phase is to:
      Determine the feasibility and appropriateness of the alternatives.
      Identify system interfaces.
      Identify basic functional and data requirements to satisfy the business need.
      Establish system boundaries; identify goals, objectives, critical success factors, and performance measures.
      Evaluate costs and benefits of alternative approaches to satisfy the basic functional requirements
      Assess project risks
      Identify and initiate risk mitigation actions, and Develop high-level technical architecture, process models,
        data models, and a concept of operations. This phase explores potential technical solutions within the
        context of the business need.
       It may include several trade-off decisions such as the decision to use COTS software products as opposed to
        developing custom software or reusing software components, or the decision to use an incremental delivery
        versus a complete, onetime deployment.
      Construction of executable prototypes is encouraged to evaluate technology to support the business process.
       The System Boundary Document serves as an important reference document to support the Information
       Technology Project Request (ITPR) process.
      The ITPR must be approved by the State CIO before the project can move forward.
PICTORIAL REPRESENTATION OF SDLC:
                                                                                                                      9
PLANNING PHASE
The planning phase is the most critical step in completing development, acquisition, and maintenance projects.
Careful planning, particularly in the early stages of a project, isnecessary to coordinate activities and manage project
risks effectively. The depth and formality of project plans should be commensurate with the characteristics and risks
of a given project. Project plans refine the information gathered during the initiation phase by further identifying the
specificactivities and resources required to complete a project.
A critical part of a project manager’sjob is to coordinate discussions between user, audit, security, design,
development, and network personnel to identify and document as many functional, security, and
networkrequirements as possible. During this phase, a plan is developed that documents the approach to be used
and includes a discussion of methods, tools, tasks, resources, project schedules, and user input.
Personnel assignments, costs, project schedule, and target dates are established.
A Project Management Plan is created with components related to acquisition planning, configuration management
planning, quality assurance planning, concept of operations, system security, verification and validation, and systems
engineering management planning.
REQUIREMENTSANALYSIS PHASE
This phase formally defines the detailed functional user requirements using high-level requirements identified in the
Initiation, System Concept, and Planning phases. It also delineates the requirements in terms of data, system
performance, security, and maintainability requirements for the system. The requirements are defined in this phase
                                                                                                                      10
to a level of detail sufficient for systems design to proceed. They need to be measurable, testable, and relate to the
business need or opportunity identified in the Initiation Phase. The requirements that will be used to determine
acceptance of the system are captured in the Test and Evaluation Master Plan.
The purposes of this phase are to:
       Further define and refine the functional and data requirements and document them in the Requirements
        Document,
       Complete business process reengineering of the functions to be supported (i.e., verify what information drives
        the business process, what information is generated, who generates it, where does the information go, and
        who processes it),
       Develop detailed data and process models (system inputs, outputs, and the process.
       Develop the test and evaluation requirements that will be used to determine acceptable system performance.
DESIGN PHASE
The design phase involves converting the informational, functional, and network requirements identified during the
initiation and planning phases into unified design specifications that developers use to script programs during the
development phase. Program designs areconstructed in various ways. Using a top-down approach, designers first
identify and link major program components and interfaces, then expand design layouts as they identify and link
smaller subsystems and connections.
Using a bottom-up approach, designers first identify and link minor program components and interfaces, then expand
design layouts as they identify and link larger systems and connections. Contemporary design techniques often use
prototyping tools that build mock-up designs of items such as application screens, database layouts, and system
architectures. End users, designers, developers, database managers, and network administrators should review and
refine the prototyped designs in an iterative process until they agree on an acceptable design. Audit, security, and
quality assurance personnel should be involved in the review and approval process. During this phase, the system is
designed to satisfy the functional requirements identified in the previous phase. Since problems in the design phase
could be very expensive to solve in the later stage of the software development, a variety of elements are considered
in the design to mitigate risk. These include:
       Identifying potential risks and defining mitigating design features.
       Performing a security risk assessment.
       Developing a conversion plan to migrate current data to the new system.
       Determining the operating environment.
       Defining major subsystems and their inputs and outputs.
       Allocating processes to resources.
       Preparing detailed logic specifications for each software module. The result is a draft System Design Document
        which captures the preliminary design for the system.
                                                                                                                   11
      Everything requiring user input or approval is documented and reviewed by the user. Once these documents
       have been approved by the Agency CIO and Business Sponsor, the final System Design Document is created
       to serve as the Critical/Detailed Design for the system.
      This document receives a rigorous review by Agency technical and functional representatives to ensure that it
       satisfies the business requirements. Concurrent with the development of the system design, the Agency
       Project Manager begins development of the Implementation Plan, Operations and Maintenance Manual, and
       the Training Plan.
DEVELOPMENT PHASE
   The development phase involves converting design specifications into executable programs. Effective
   development standards include requirements that programmers and other project participants discuss design
   specifications before programming begins. The procedures help ensure programmers clearly understand program
   designs and functional requirements. Programmers use various techniques to develop computer programs. The
   large transaction oriented programs associated with financial institutions have traditionally been developed using
   procedural programming techniques. Procedural programming involves the line-by-line scripting of logical
   instructions that are combined to form a program. Effective completion of the previous stages is a key factor in
   the success of the Development phase. The Development phase consists of:
      Translating the detailed requirements and design into system components.
      Testing individual elements (units) for usability.
      Preparing for integration and testing of the IT system.
INTEGRATION AND TEST PHASE
      Subsystem integration, system, security, and user acceptance testing is conducted during the integration and
       test phase. The user, with those responsible for quality assurance, validates that the functional
       requirements, as defined in the functional requirements document, are satisfied by the developed or
       modified system. OIT Security staff assesses the system security and issue a security certification and
       accreditation prior to installation/implementation.
Multiple levels of testing are performed, including:
      Testing at the development facility by the contractor and possibly supported by end users
      Testing as a deployed system with end users working together with contract personnel
                                                                                                                  12
       Operational testing by the end user alone performing all functions.
        Requirements are traced throughout testing, a final Independent Verification & Validation evaluation is
        performed and all documentation is reviewed and accepted prior to acceptance of the system.
IMPLEMENTATION PHASE
This phase is initiated after the system has been tested and accepted by the user. In this phase, the system is installed
to support the intended business functions. System performance is compared to performance objectives established
during the planning phase. Implementation includes user notification, user training, installation of hardware,
installation of software onto production computers, and integration of the system into daily work processes. This
phase continues until the system is operating in production in accordance with the defined user requirements.
OPERATIONS AND MAINTENANCE PHASE
The system operation is on-going. The system is monitored for continued performance in accordance with user
requirements and needed system modifications are incorporated. Operations continue as long as the system can be
effectively adapted to respond to the organization’s needs. When modifications or changes are identified, the system
may re-enter the planning phase.
The purpose of this phase is to:
       Operate, maintain, and enhance the system.
       Certify that the system can process sensitive information.
       Conduct periodic assessments of the system to ensure the functional requirements continue to be satisfied.
       Determine when the system needs to be modernized, replaced, or retired.
                                                             start
                                                         CHOICE=INT                                                   13
                                                         (INPUT(“ENT
                                                         ER THE
                                                         CHOICE ”))
             IF
             CHOICE=
             =1:
coll_ID=input("ENTER YOUR COLLEGE ID")
  name=input("ENTER YOUR NAME")
  add=input("ENTER YOUR    ADDRESS")
  dept=input("ENTER YOUR
DEPARTMENT")
       print(abc)
                                         14
                Elif
                Choice==
                2;
   roll_no=int(input("enter your roll
   number"))
     mysql="select*from
   hostel_management where
   roll_no={}".format(roll_no)
print("roll_no:",data[0][0])
print("name:",data[0][1])
print("address:",data[0][2])
print("room_no:",data[0][3])
print("dept:",data[0][4])
print("fees:",data[0][5])
            elif
            choice==2
            :
                                        15
print("AVAILABLE DEPARTMENTS AS FOLLOWS")
 print("1.COMPUTER")
 print("2.BIO")
 print("3.TECH")
 print("4.PHYSICS")
 print("5.ECO")
 print("6.ENG")
      department=input("ENTER YOUR
      DEPARTMENT")
        mysql="select*from fees where
      department='{}'".format(department
      )
         c1.execute(mysql)
         data=c1.fetchall()
                         elif
                         choice==
                         4:
                      print("your fees
                      is:",data[0][1])
                                            16
                            print( "SORRY,YOU
                            ARE NOT AUTHORIZED
                            TO USE THIS SITE ")
                                      els
                                      e
                          print("QUITTING!!!!!!!!!")
                                   stop
                            SOURCECODE
import mysql.connector as mys
mycon =
mys.connect(host='localhost',user='root',passwd='aliha
mz4561',database='ali')
                                                         17
mycon.autocommit==True
if mycon.is_connected():
      print('sucessfully connected')
mycur=mycon.cursor()
'''mycur.execute("create table
hostel_management_boy(college_Id int primary
key,name varchar(20),address varchar(100),room_no
int,dept varchar(15),food char(10),fees int)")
mycur.execute("create table
hostel_management_girl(college_Id int primary
key,name varchar(20),address varchar(100),room_no
int,dept varchar(15),food char(10),fees int)")
mycur.execute("create table fee(dept varchar(30), fee
int)")
a = "insert into fee values(%s,%s)"
b=[('Computer',8000),('Mechanical',7000),('B.Sc',5000),
('Chemical',7000)]
mycur.executemany(a,b)
mycon.commit()
'''
import random
print('                                           WELCOME
TO HOSTEL MANAGEMENT
')
print('*************************************************************
********************************************************************
************************')
#global variables
Id=''
name=''
add=''
dept=''
food=''
gen=''
fee=''
room=''
                                                                       18
def new():
  global Id
  global name
  global add
  global dept
  global food
  global gen
  global room
  global fee
   print('                                           ADMISSION
FORM
')
print('*************************************************************
********************************************************************
*********************')
  Id=input('Enter your college ID: ')
  name=input('Enter your Name: ')
  add= input('Enter your full address: ')
  dept=input('Enter your department: ')
  food=input('Do you want food? ')
  fee=str(fee())
  gen=input('Enter your gender: ')
  if gen =='m' or gen=='M' or gen=="male" or
gen=='Male' :
     room=str(room1())
     HM_boy()
  else:
     room=str(room2())
     HM_girl()
def HM_boy():
   abc= ("insert into hostel_management_boy
values("+Id+",'"+name+"','"+add+"',"+room+",'"+dept+"'
,'"+food+"',"+fee+")")
  print(abc)
  print(‘Successfully Recorded’)
  mycur.execute(abc)
  mycon.commit()
def HM_girl():
                                                                       19
   xyz=("insert into hostel_management_girl
values("+Id+",'"+name+"','"+add+"',"+room+",'"+dept+"'
,'"+food+"',"+fee+")")
  print(xyz)
  print(‘Successfully Recorded’)
  mycur.execute(xyz)
  mycon.commit()
def room1():
  room=random.randint(1,251)
  mycur.execute("select * from
hostel_management_boy where
room_no={}".format(room))
  row = mycur.fetchall()
  if mycur.rowcount<=4:
     print(room)
     return room
  else:
     room1()
def room2():
  room=random.randint(1,201)
  mycon.execute("select * from
hostel_management_girl where
room_no={}".format(room))
  row = mycur.fetchall()
  if mycur.rowcount<=4:
     return room
  else:
     room2()
def fee():
   mycur.execute("select * from fee where dept
='{}'".format(dept))
  print(dept)
  data=mycur.fetchall()
  fee = data[0][1]
  print(data)
  if food == 'yes':
                                                         20
     fee+=1000
     print('Your fees is: ',fee)
     return fee
  else:
     print('Your fees is: ',fee)
     return fee
def fcheck():
   print('                                             FEE
CHECKING
')
print('*************************************************************
********************************************************************
*************************')
  coll_id=input('Enter your college Id: ')
  g=input('Enter your gender: ')
  if g =='m' or gen=='M' or gen=="male" or
gen=='Male' :
    mysql="select * from hostel_management_boy
where college_Id={}".format(coll_id)
     mycur.execute(mysql)
     data=mycur.fetchall()
     print('Your fees is:',data[0][6])
  else:
    mysql="select * from hostel_management_girl
where college_Id={}".format(coll_id)
     mycur.execute(mysql)
     data=mycur.fetchall()
     print('Your fees is:',data[0][6])
def Hcheck():
   print('                                           HOSTEL
ROOM CHECKING
')
print('*************************************************************
********************************************************************
************************')
  coll_id=input('Enter your college Id: ')
  g=input('Enter your gender: ')
  if g =='m' or gen=='M' or gen=="male" or
gen=='Male' :
                                                                       21
    mysql="select * from hostel_management_boy
where college_Id={}".format(coll_id)
     mycur.execute(mysql)
     data=mycur.fetchall()
     print('Your room no is:','HM -',data[0][3])
  else:
    mysql="select * from hostel_management_girl
where college_Id={}".format(coll_id)
     mycur.execute(mysql)
     data=mycur.fetchall()
     print('Your room no is:','HG -',data[0][3])
def clear():
  for i in range(60):
     print()
while True:
  print('1.Admission form')
  print('2.Fees checking')
  print('3.Hostel room no checking')
  print('4.exit')
  choice = int(input('Enter your choice'))
  if choice ==1:
   a = clear()
   b = new()
  elif choice ==2:
     clear()
     fcheck()
  elif choice == 3:
     clear()
     Hcheck()
  elif choice==4:
     print('Quitting!!!!!!!!')
     break
 else:
                                                   22
    print(‘please enter a valid choice’)
OUTPUT
sucessfully connected
                                   WELCOME TO HOSTEL
MANAGEMENT
**********************************************
**********************************************
**********************************************
***************
1.Admission form
2.Fees checking
3.Hostel room no checking
4.exit
Enter your choice1
                                                       23
                                 ADMISSION FORM
***************************************************************************************************
***************************************************
Enter your college ID: 12456
Enter your Name: Ali
Enter your full address: Karol Bagh
Enter your department: mechanical
Do you want food? yes
mechanical
[('Mechanical', 7000)]
Your fees is: 8000
Enter your gender: m
35
insert into hostel_management_boy
values(12456,'Ali','Karol
Bagh',35,'mechanical','yes',8000)
Succesfully Recorded
1.Admission form
2.Fees checking
3.Hostel room no checking
4.exit
Enter your choice2
                                                                                             24
                             FEE CHECKING
**********************************************
**********************************************
**********************************************
****************
Enter your college Id: 123
Enter your gender: m
Your fees is: 9000
1.Admission form
2.Fees checking
3.Hostel room no checking
4.exit
Enter your choice3
                                                 25
                               HOSTEL ROOM
CHECKING
**********************************************
**********************************************
**********************************************
***************
Enter your college Id: 12456
Enter your gender: m
Your room no is: HM - 35
1.Admission form
2.Fees checking
3.Hostel room no checking
4.exit
Enter your choice5
Please enter a valid choice
1.Admission form
2.Fees checking
3.Hostel room no checking
4.exit
Enter your choice4
Quitting!!!!!!!!
                                                 26
         HARDWARE AND SOFTWARE REQUIREMENTS
I.OPERATING SYSTEM                  :   WINDOWS 7 AND ABOVE
II. PROCESSOR                       :   PENTIUM(ANY) OR AMD
                                        ATHALON(3800+- 4200+ DUALCORE)
III. MOTHERBOARD                    :   1.845 OR 915,995 FOR PENTIUM 0R MSI
                                        K9MM-V VIAK8M800+8237R PLUS
                                        CHIPSET FOR AMD ATHALON
IV. RAM                             :   512MB+
V. Hard disk                        :   SATA 40 GB OR ABOVE
VI. CD/DVD r/w multi drive combo:       (If back up required)
VII. FLOPPY DRIVE 1.44 MB :             (If Backup required)
VIII. MONITOR 14.1 or 15 -17 inch
IX. Key board and mouse
X. Printer                          :   (if print is required – [Hard copy])
SOFTWARE REQUIREMENTS:
   I.        Windows OS
   II.       Python
                                                                               27
                                 BIBLIOGRAPH
1. Computer science With Python - Class XI By : SumitaArora
2. A Project Report On Blood Bank Management System (BBMS) By : Praveen M
   Jigajinni
3. Website: https://www.w3resource.com
                                                                            28