THE FEDERAL DEMOCRATIC
REPUBLIC OF ETHIOPIA
ETHIOPIAN ROADS AUTHORITY
} CONTRACT DOCUMENT
hy |
i For the |
| Procurement of Construction Works of Design and
| Build of Gore-Masha-Tepi Road Project
| CB No: W/53/CB/ExImBK/2010EFY
Betweeri
Between
Ethiopian Roads Authority and Hyundai Development Company
Ras Abebe Aregay Street 55, Hangang-daero 23-gil Yongsan-gu,
Post Office Box: 1770 Tel: +82-2.2008.9097/9069
Addis Ababa Fax: +82-2.2008.9013
Ethiopia seoul,
Korea
December 2018
Addis Ababa
sulayConstruction Works of Design
Section
Section It
Section Hl
section V:
Section V
Section Vi:
Section Vi:
section Vill:
section IX:
Section <¢
Section XI:
Contract Document
Ethlopian Roads Authority
an Bula of Gore-tasha-Tep! Road Pe
Contents of Contract Documents
Contract Agreement
The Letter of Acceptance and Its Annex
Addendum Nos and Addendum No.2.to the bidding document
Contractor's Offer; Appendix to Bid/OFfer and Payment Schedules
“The Conditions of Contract, Part Ii: Particular Conditions
‘The Conditions of Contract Part |: Conditions of Contract for Design-Build
and Turkey, First edition 1995 FIDIC
Employer's Requirements
Performance Security
Forms of Advance Payment Guarantee
Forms of Warranty Bond
Power of Attorney
Fare a
Zann?
1
|
i
i
i
|Construction Works of Design and Build of Gore-Masha-Tep! Road Project __Ethiopton Roads Authority
Section I:
Contract Agreement
Contract DocumentConstruction Works of Design and Bud of Gore-Masha-Tepl Road Project £thvopian Roads Authority
Contract Agreement
THIS CONTRACT AGREEMENT is made onthe__|.3___ day of December, 2018
BETWEEN
Ethioplan Roads Authority of the Federal Democratic Republic of Ethiopia, or corporation
incorporated under the laws of Ethiopia and having its principal place of business at Ras.
Abebe Aregay Street, P.O. Box 1770, Addis Ababa, Ethiopia (hereinafter called “the
Employer”),
And
Hyundat Development Company, a corporation incorporated under the laws of Korea
and having its principal place of business at 55, Hangang-daero 23-gll Yongsamgu, Tel
++82-2.2008,9097/9069, Fax: +82-2.2008.9013, Seoul, Korea (hereinafter called “the
Contractor”),
WHEREAS the Employer invited bids for the Works, should be designed and executed by
the Contractor, Construction Works of Design and Build of Gore-Masha-Tepi Road
Project and has accepted a Bid by the Contractor through the Letter of Acceptance
dated December 03, 2018 for the execution and completion of these design-build works
and the remedying of any defects therein with a total contract price of USD
138,477,000.00 (United States Dollar: One Hundred Thirty Eight Million, Four Hundred
Seventy Seven Thousands Only) excluding any tax except corporate tax which is
equivalent to KRW 158,252,900,370.00 (Korean Won: One Hundred Fifty Eight Billion,
Two Hundred Fifty Two Million, Nine Hundred Thousand, Three Hundred Seventy only)
excluding any taxes except Corporate tax.
‘The Employer and the Contractor agree as follows:
1. In this Agreement words and expressions shall have the same meanings as are
respectively assigned to them in the Contract documents referred to.
2. The following documents shall be deemed to form and be read and construed as part
of this Agreement, and the priority of the documents shall be as follows:
1. The Contract Agreement;
2, The Letter of Acceptance and Its Annex;
3. Addenda to the bidding document;
4. Contractor's Offer; Appendix to Bid/Offer and Payment Schedules;
5. The Conditions of Contract, Part I Particular Conditions;
6. The Conditions of Contract, Part |: Conditions of Contract for Design-Build and
Turnkey, First edition 1995 FIDIC);
7. Employer’s Requirements;
8, Performance Security;
9. Forms of Advance Payment Gu:
40. Forms of Warrant; i
4. Power of Attort
larantee;
rae
i
|
|
|Construction Works of Design and Bull of Gore-Mashe-Tepl Road Project Ethiopian Roads Authority
3. In consideration of the payments to be made by the Employer to the Contractor as.
herein after mentioned, the Contractor hereby covenants with the Employer to design,
execute and complete the Works and to remedy defects therein in conformity in all
respects with the provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor in consideration of the design,
execution and completion of the Works and the remedying of defects therein, the
Contract Price or such other sum as may become payable under the provisions of the
Contract at the times and in the manner prescribed by the Contract,
IN WITNESS whereof the parties hereto have caused this Agreement to be executed in
accordance with the laws of the Federal Democratic Republic of Ethiopia on the day,
month and year indicated above.
For and On behalf of the Client For and On behalf of the Contractor
Ethiopian Roads Authority Hyundai Development Company
Habtarnu Tegegne =
Witness
In the capacity of Ge
Signature
Date
Inthe Presence of berg loo bine
In the capacity of (am
Signature
Date
Contract Agreement = SAR Page 2 0f2Ethiopian Roads Authority
Construction Works of
Section Il: j
‘The Letter of Acceptance and Its Annex
Contract DocumentPAOAE Stent LUPREA IE AMAR THE FEDERAL DEMOCRATIC REPUBLIC OF EYHIOPIA,
CAALR SE VIE Nag Ory ETHIOPIA ROADS AUTHORITY
omy ne 1270 na a ache Bast ile ox 170 Aba io
i san ah eve aero Tok 243800 eto 7779,
‘enn 2t 4 esos 4u68 ox 254-11-S814808
Pe : neti. Acar} lex- 4d 64
a MN BR aaasevooa, O82. ho 18
To: Hyundai Development Company
55, Hangang-daero 23-g1l Yongsan-gu, Seoul, Korea
Tel: +82-2.2008.9097/9069
Fax: +82-2.2008.9013,
Rez Construction Works of Design and CC
t Bulld of Gore-Masha-Tepi Road Project
$B No: W/53/CB/ExImBK/2010E FY _ _—_———
Subject Letter of Acceptance Ehed > Copy ofthis ateer
= Copy of ERA's request for
‘torfication andjor confirmation
letter and
+ Cony of Hyundal’s response on
ERAS request
Dear Sir,
We refer to our invitation to bid posted on the Ethiopian Herald Newspaper on July 04
and 05, 2018 for the Construction Works of Design and Build of Gore-Masha-Tepi Road
Project and to your bid submitted on October 04, 2018 for the referred contract.
We also refer to our letter Ref. No ACHt/322/25-4445 dated Novernber 09, 2018 through
which we have requested you Clarification and/or confirmation and your subsequent
response regarding the same through your letter Ref. No HOCOBT-2018-60 dated
November 19, 2018 (attached and forming part of this letter of acceptance):
' 4. You are hereby informed that your Bid for the above captioned project is
ie accepted subject to the Conditions of Contract, Employer's Requirement, Bid
| Submission Form, Addendum Noa and Addendum No. of the Bidding
at Document and this letter with the cost of USD 138,477,000.00 (United States
Dollar: One Hundred Thirty Eight Million, Four Hundred Seventy Seven
‘Thousands Only) excluding any tax except corporate tax.
2. You are therefore required to present Performance Security in the amount
equal to Ten percent (10%) of the accepted contract amount in equal portion
jer the contract within 14 days in accordance with the condition of
for that purpose of performance security form included in
:t Forms) of the bidding document,
an Togagne Page 1 of 23. Please append your signature to a copy of this letter (attached) and return the
signed copy to us in recognition of your receipt.
Yours sincerely,
\
exhioplan ro nao
Director, Gen
Name of Project: Construction Works of Design and Build of Gore-Masha-Tepi Road
Project
Recognition of Recelpt
Received by: SWUNG TI! N_RARK
inthe Capacity of__ Phe ides o’s_ Authorized Representatt ve
Signature:PRAIGKL LENE ANHEASIE ETHNON aN) Lo ‘THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA
TAPAS oot naam \ PRY ETHIOPIA ROADS AUTHORITY
FAS YY HM 1770 DAD AON ALORS Post Office Box 1770 Addis Ababa Ethiopia
PRATT A&dH Aare PATE ABD DON Cable Address Highways Addis Ababa
“beni 214880 fhAN RIC 561-74-70/79 ‘Telex 214880 Tat,No, $51-71-70/79
$n 251-11-6514966 Fax 251-21-5514866
+e rete AoW | 322/28= 44S
Ades Abab wit 0%
BAD OM BE. ar,
To: Hyundi Development Company
55, Hangang-daero 23-gil Yongsangu, Seoul, Korea
Tel: +822.2008.9097/9069
Fax: +82-2.2008.9013
Re: Consiraction Works of Design and Build of
Gore-Masha-Tepi Road Project
(CB No: W/53/CB/ExIMBK/20108FY
2 = = Points requiring Clarification and
Subject: Request for Submission of Clarification and jar Excls ~ fontaine citicaon an
Confirmation
Dear Sirs,
{ts recalled that the financial offer of your company for referred project was opened on October 23,
2018 and it fs under evaluation.
Having reviewed your bid document (Technical Bid and Financial Bid), we have noted some points
which require your confirmation and clarification in order to finalize and conclude the evaluation. The
‘copy of the same is attached to this letter for your action.
‘This is, therefore, to request you to submit confirmation and clarification as appropriate within three
working days of receipt
SiMe APIS
1a bis eA
Yours Sincerely,
HtConstruction Works of Design and Build of Gore - Masha ~Tepioacl Project
Points required Confirmation and /or Submission of additional Documents
{n the Technical Proposal
1. The bidder has demonstrated that it will provide the required construction machinery
from Sinohydro Bureau 9 Co, Itd. The bidder has also attached lease agreement for all
equipment required in the bidding document and most of which are indicated to be
located in Gulyang City, Guizhou Province of the People’s Republic of China and few are
located in Mongolia, Mapotu of Mozambique, Liberia and Belarus.
Hence, the bidder shall confirm to avail all the required equipment with the required
capacity and number incompliance to the requirements indicated in the bidding document
@P) of Reinforcement : Preliminary. The BLS of US published indexes until June of 2018 officially.
‘The index will be revised afte original publication.
3 Indexes for Bitumen and Equipment : To find reliable indexes, we stated Indexes of Nationa!
Statistics Bureau, Korea.
Table D. Foreign Currency 1 (FCI)
= | Nonadjustable . 11,468,550 | A: 15%
36.40 oe
F Pud ee
; 92.75 ;
B Bitumen Seprenig 2g 68880 | e:19%
; 100.99
S| Reinforcement National 3,822,850 | 4:5%
States Bureau, | SPismbe 2018
c Cement Korea oon 764,570 | 61%
E | Equipment ae 28,289,000 | -837%
September, 2018 ‘ ;
G | Forcign Labor yn ig; 35822850 | 65%
16,457,000 100%
> These indexes were updat ¥ I Statistics Bureau, Korea.Gore-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Road upgrading Project”
Table E. ‘Third Country
= | Nongjusutle 7 : 1,008,600 | A: 15%
263.6 ;
F Fuel soporte org] 1479280 | b:22%
; 194.9 at
B Bitumen sepiener gore) 008600 | ox 15%
; Consus and Statics | 204.4 : |
S | Reinforcement | “Department of | September, 2018 see2e ee
*etimniscive | 1389
nite : ;
c Coment aE see aie 67240 | et
E | Bauipment Rent 2,487,880 | £37%
1664 ;
G | Foreign Labor eieees 2018 336,200 | 5%
Total 674000 | 100%
> These indexes can be updated by publication of the latest data from Census and Statics Department
‘of Hong Kong Special Administrative Region on December.
-2S-NATIONAL OIL ETHIOPIA PLC (NOC)
Supplier's VAT Reg. No, 21901 Cape Verde Road
Supplier's TIN No. 000059459 P.O.Box 951 code 1250
Date of Registration 07-Aug-2004 - Tel, 251-11-663-94-91/94
Fax, 251-13-663-94-95
PRICE INDEX
Date: - September 28 /2018
‘To: Hyundat Developmont Company
Addis Ababa:
Dear Sirs;
As por your request regarding price index of fuel, please be advised that price of fuel at
Addis Abaha as follows:-
Fuels
‘Unit Price Birriliter for
Gas ofl
Pe
Best regards,
|
|
|
|Derba-MIDROC Cement LCV LECH ACUTE
Private Ltenited. Company Phat POY CVA TUN
|
|
|
|
|
Date: - September 28,2018 |
HYUNDAI DEVELOPMENT COMPANY
ADDIS ABABA
Subject: - Renlv-for.Prlce Index. ee
Dear Sirs:
‘As per your letier Reference N®, HDCOBT-2018-89, dated on September 26, 2018 you
‘have requested us a price of cement during the date of September 6" of 2018.
‘Therefore, please find below one quintal PPC and OPC cement price at factory as
‘Cement Type and Price
Thank you.
Yours sincerely,
i eu) ae, BS
*
oy ies
ote ie A>
LIES
nner gS
wax
AYE Mes WIDE!
2472018. 11.16
: sberte teat pda
| vwome | surjeos | ont reote | uonicstons | scommicsaionms | ston | cate |
Databases, Tables & Calculators by Subject “sae
Change Output Options: fom BE) ww fay] = @
SHindude graphs © Include annual averages ‘More Formatting Options sa
Data edracted on: November 15, 2018 (11:10:13 PY)
PPI industry Data
Series |v: Poussttiosanii0
Series Title: PPI indastry deta for tron and steel i118 and ferroalloy ae, not soxscnatty adjusted
Indust y: reo ard steel BI1}9 and terroal toy ata
Produot on end Steal e118 and ferroaltoy at
Base Date: 138208
ie [Bat |e
isu
B.S t
eral ssl ee
$037) aves a7ral a78
i743 | "176,6] 478.9) 105.0
[a5 4] 3045 ies, 00,
358.1] 181.6) 146.0) 142,
156.0] 154.0) 159.5) 1854
Til
‘ooLs | cmounrors | HELP RO RESOURCES
Areas ataclenss | inate | Holp & Tulocals | Whats New Inspector General (016)
Indusbios ata Gience | injuyAndtiness | FAQS | Careers @ BLS Buigat and Performance
EconomioReleases ‘Glossary | Bind WOOL No Fear Aet
Databases & Tables | Avout BLS | dein our Bing Lists UsAgov
Maps | Conteet us Linking & Gopytgntinfo Bonet gov
random sation | Psnsoy huey Seman | DucHinrs | Cute Bory | Iparant Web Sie Hest |
Be tly SERED [Postal Sareea, 2 Vassacusets Avenue, WE Wigton, 6 2022-00
‘LN, oD1 | Telephone: 1-200-691-5200 | TDD: 600-677-698 | ontacb isGore-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Road upgrading Project”
Oi Producer Price Index
Source : Statistics Korea
Download Date : 2018. 12. 18
Table URL :
http://kosis.kr/eng/statisticsList/statisticsListIndex.do?menuld=M_O1_018vwcd=MT_E
‘TITLE&parmTabld=M_01_01#SelectStatsBoxDiv
KOSIS sonives. Q ee ttn
Statstal Database Visuaation builan Board About sts
Statistical Database
producer Price tdexes (Basic Greups)
(tn dt 208-120 Tm iy, Ce 68 = ae
ERB trcrnirty Sesion artemis. | Thot/008) cee
~ RAM‘Gore-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Road upgrading Project"
CO Consumer Price Index
{
|
1
{
|
{
|
{
|
Source : Statistics Korea |
Download Date : 2018. 12. 18
Table URL:
http://kosis.kr/eng/statisticsList/statisticsListindex.do?menuld=M_01_018vwed=MT_E
TITLE&parmTabld=M_01_01#SelectStatsBoxDiv
|
KOSIS sxsszee, Q ae
Statistical Database Vieuaiation sullen Board About KOSIS |
Sao vata
‘Statistical Database
‘crniy
|? cpt by Commodites a services(2015=100)
oa Yon 23042-04/ Toe Moy, Quay, ma 9812183
a oo Dyan | br ccamosing 8s. | Tne S/5751_ 2 =a
: inn Gen a BRO BOG
SMEG sence | sone meer | sauna caine
- 30°SOMITE BORE
Consus and Statisties Department
Hong Kong Spectal Administrative Region
AR RATNLARM A RIER (2003 4 4 ~ 100)?
INDEX NUMBERS OF THE COSTS OF LABOUR AND MATERIALS
USED IN PUBLIC SECTOR CONSTRUCTION PROJECTS (APRIL 2003 = 100)
201898
SEPTEMBER 2018 :
5: los 4 2003 #84 eam)
8 a a =
we tem aa
Inder Nantes
is abou
ROTA (bATRAM) ‘Composite abour wages for civil engineering contacts
BETH BREN) ‘Composite abour wages for bulling contac
somata
RE 1916
ae i949
Rae tnd
ae 2638
om 1088
Aa ‘Glazed ceramic wall titer 2026
we Harewood 243.2 :
sms Hoogensoas foo tiles 787
al rived mild tool 3907
mB Metal forse 1967
sea Mossi es 2126
it Paint 1842
aN CD Portand cement (ordinary) 2389
e Send 10189
a Soo reinforcement 2084
bk Teak 2635
RY Timmer formwork 2022
eRe UPVC pipes 1848
SKS G4 pines 180.7
aH em afi
Sa
s 20086F91=100) ‘Copper pipes (September 2008 ~ 100) 928
Be oes
() LABHARAREEARE AB AT. (1) The index muuben of the coats of fsbour and mts are coined for
AMR RNTTARE HEAT CECH —working out th lncreaseldecesse of puyraert to the main conmictors of public
CARL BA » CURRAN ARBRE sector constuction projets to adjus for the change im cost, ‘The cows of
THERRAERILT RRB H TRS — labour indices thoofore only cover public scctor conruction projets a
peeves reflect the changes im labour coats home by main contactors of public sector
‘onstruction projects,
(2) SHE RK A MI — HE REL + ATW 2) The copper pipes cost inex is a new index serie with ata collection
‘5H (HIDD085F9F4=100) » TOPE
SES AH EE»
FMLA RAR HaMEN
Amaia ATA «
‘SAE: (852) 3903 7385
BRM: (932)2127 4098
RFD: consiasioncon@oensatdConstruction Works of
yrand Built of Gore Masha:
___Ethloplan Roads Authority
Section Ill:
Addendum No.1 and Addendum No.2 to the bidding documentConstruction Works of Nesiga ane Bulls of GaresAtasha Top Read Project {Ethiopian Roads Author
Construction Works of Design and Build of Gore-Masha-Tepi Road Project
Addendum No.t
in Volume-| Part 1, section IV: Bidding Form, Appendix to bid/tender 1.5,Stamp Dutie:
and Similar Charges, please amend contract data to be read as follows;
| The costs of stamp duties and similar
charges (If any) imposed by law in
connection with entry into the Contract
| Agreement shail be borne by the |
Sssshil [adtesAssssstand 1:11 «[-rSasadssasesdsiasstssasessstated)
i In Volume Part 1, Section III: Evaluation Qualification Criteria,Form-1 Completeness of
the Bidding Document please amend item not.t description which read as;
| “One originai and two copies” to read as;
“One originai and four copies” |
In Volume-I Part 1, Section IV: Bidding Form; Form FIN-, Financial situation of the |
Bidding Document please amend the note which read as {
“attached are copies of financial statements (balance sheets including all related notes, |
| and income statements) for the last three years, as indicated above, complying with the =|
| following conditions” to read as; !
“attached are copies of financial statements (balance sheets including all related notes, |
| and income statements) for the last five years, as indicated above, complying with the |
| following conditions”
yin Volume-t Part 1, Section IV: Bidding Form; letter of Bid (Singlestage two-Envelope
| Bidding Procedure), page no.77, please delete the form in its entirety. i
Volume ll: Part 2,: Section Vi, Appendix C: typical Section, please delete DRG No.| |
TS]o03 in its entirety and replace it with the drawing attached as Annex-A to this | |
addendum.
6. | Volume I: Part 3: Section Vill. 448, Protection of the Environment Detours, please |
| amend the 10" paragraph to be read as follows:
“Detours, temporary roads for temporarily diverting road traffic as defined in Sub- |
|
1
i
i
i
|
1
i
Clause 1.1.6.14, shall not be permitted for the Gore Masha ~Tepi Road Project and
construction will be in half-width."
? Volume ll: Part 2: Section VI. 8.6., traffic management, please amend the second
paragraph to be read as follows;
“The Contractor shall be responsible for the management and accommodation of traffic
inkenance of Temporary Traffic Diversions and half |
| including the establishment and
maintenance of tempor
plant, equipment, tr tf superintendence, consumgbles_ and
‘Addendum NotConstruction Wark af Design and Build of Gore-Masho-Tepi Road Project Ethiopian Roads Author
ir [everything necessary for the safe and easy passage of all public and private traffic during )
the construction and defects notification period(s) during the twenty-four (24) hours of
each day and in any kind of weather conditions, and also the obliteration of traffic
versions as they become redundant” !
|
|
8. | Volume I: Part 3; Section Vill: Particular condition (PC) 21.7, Warranty Bond, please |
| amend the first sentence to be read as follows; !
| “The Contractor shall furnish a single-term Warranty Bond which shali be an |
| unconditional bank guarantee (demand guarantee) in an amount of Ten per cent (10%) |
| of the Contract Price for the entire Project” |
a
| Volume Tk Part 2,; Section Vi, Appendix B: Accommodation, services and Attendance |
's Representative's Staff, B3, Housing Accommodation for the |
|
|
9
for the Employer
Employer,s representative, please amend the footnote 3 which read as;
“3 Two Type C houses shall be earmarked for the Employer's Project Counterparts
and the Land Compensation/ROW team.”
| to read as;
“One Type A house for Employers Counterpart Engineer and One Type C for the Right of
Way Agent”
10. } Volume Ii: Part 2,: Section VI, Appendix B: Accommodation, services and Attendance |
‘for the Employer's Representative’s Staff, Please Type A and Type B vehicle |
specification as follows: | |
mn en
|) Types |
| Station Wagon, with latest model, LWB, 4WD, diesel engine, five-doors, backdoor lift-
| up, minimum 8 seats, minimum capacity 4461 cc.
The Type A Vehicles shall have the following major details:
‘+ Aircieaner, cyclone, wipre-cleaner Towing pintle
50R,16.6 Sahara w/tube
* Bumper step © Upholstery, fabric
© Cigarette lighter © Warning triangle
© Clock digital * Winch, electric
+ Fire Extinguisher = Window wiper, intermittent
* Window wiper, w/washer/defogger,
|
| * Air conditioner, non-CFC * Tires:
It
|
© Workshop repair manual, English
Page? ofa
AB4-Cennstraction Works of Design and Build of Gore Masha:Tepi Road Proj | Ethioplan Reeds Authori
i |e Headlamps, halogen © Engine mount: front lateral
\ | «Headrests, front & rear © No.of Cylinders: 8 ;
i | ® Jerry can, wiholder 19ftres © Power: min. 96kW(13ihp) at |
| |. Laminated windscreen, green 3800rpm
! | + Lamp protection front andrear __* Torque 285NM at 2200rpm |
| Lockable fue! tank id + Average fuel consumption 13/00kr|
I | © Lockable glove box * Fuel tank capacity: 93+45=138 litres |
| © Lockable wheel nuts ¢ Transmission: |
| Mudguards front and rear - four wheel drive, |
| | 4 Owner's manual, English - 5 forward gears, |
| «Parts catalogue, Eng./Fre./Spa. ~ floor mount lever, |
Bee poner asoelaee - highlow transfer case, |
© Power steering w/collapsible - free wheel hub manual |
eI seer ae wheel : \
|e Radio AM/FM/SW and cassette ~ Front: hydraulic, disc i
i | payer ~ Rear: hydraulic drum
' | ¢ Roof rack, wiladder - Tyres: 7.502166 Sahara with |
| | «Rust protection; treated tube
i | Seat belts; front and rear # Electrical (12V system):
| Extra Std mounted on back door ~ Battery: 60A
| | Side impact protection ~ Alternator: (P) 80 A(D) 70 | i
+ 2 Spare wheel, fullsize, wilock ~ Ignition: electronic i
| * Sump guard (engine protection) © Dimensions: i
| «Suspension, heavy duty/otf-road ~ LXHXW: 489oxi925x1940mm) |
package - Wheel base: 2850mm |
«Tachometer ~ Ground clearance of 225mm
| © Toolkit with jack & crank handle = Spare part kits
| ¢ Touch-up point - 4.2L Diesel (LHD) |
«Towing hitch ball w/trailer socket
ii) Types
| | Plelcup double cabin, atest model, LWB, with 4 doors, 5 seats, canvas cover onload ||
i i
i
1g major details: |
Fire Extinguisher
i
SS SenetConctriction Works nf Design and Bull of Gore Masha-Tepi Road Project Ethiopian Roses Author
i © Payload: 695kg 7
ide step: with
+ 88 4/4000 H.P/RPM * Deck guard frame: wiguard frame
© Wheel base: 2860 mm perorbe
+ Fuel tank capacity: 66litres
window
|
i
* Front door vent window: with vent
* Tire size 205R 1666-6
© Front seat belt: 3P ELR*2
© Tire Pattern: BIAS
© Sun vision: D#P seat
Disc wheel: 5.50F silver
ee © Clock: with (digital)
* Ground clearance 225mm
* Tachometer: with
| © Body rust protection: treated
i . Georens ieee nin ons}
* Package option: plating
Seeiaae * Audio (all destination): AM/FM/SWICS 2S!
© High altitude compensator: * Antenna: w/(STD)
with * Tool (plant install}: B+STD+REPLACER | \
* Power take off outlet: with ‘Heater: with STD 1 |
* Freewheel hub: mechanical Outside rear view mirror: 2 doors |
* Power Steering: with PS © CPC wax cleaner: with
© Tilt steering: with tit © Touch-up Paint: with
* Back outside buzzer: with * Radiator Grill: Plating Ij
© Transfer protector: with Spare wheel with anti-theft lock: 2 with
SPR-wheel lock
+ Intermittent wiper: variable
|
'
|
|
i
|
|
i
* Front bumper: plating
| * Rear bumper: step bumper
|
plating «Trip meter: with
* Glove box: with key * Additional paint (1kg): monotone
* Fuel id opener: with * Canvas hood and deck seat:
|
/
|
=
8
e
:
3
:
3
|
i
|
|
1
i
|
jouble cab |
i
‘hddlerduum Not1 iorks of Mesipn ane BukG cl ore MavhaeTepl Rest 9 | Ethiopian Roads Authorit
Construction Works of Design and Build of Gore-Masha-Tepi Road Project
Addendum No.2
1 [in the bidding document, Part 2,Section VI, please delete the provision and”
installation of solar powered LED street lighting from the following sections and any |
| other sections of Part-2, Employer's Requirement : '
i 5.3.6 At-Grade Junctions, (vi) Tepi Town Passage i
| 5.4.2 Associated Road Sections, paragraph three, 1st, 2nd, sth& 6th bulletin. |
i 11.4.2 Speed Climbing Chicane(SCC), 2nd paragraph :
\ 11.4.3 Street Lighting(the whole section) !
i 11.4.5 Speed Calming Plateau(SCP), 5th paragraph i
| ct Warranties, Section 13.2.7 & Table 13.3
13.2 Main Pr
lease amend the following;
| “(b) Type 8 vehicle - Five numbers (13 nos.) pick-up double cabin 4-WD with hard body
| canopy”
iby
' «(b) Type B vehicle - Thirteen numbers (13 nos.) pick-up double cabin 4-WD with hard
! body canopy”
Volume Ii: Part 2, Section VI, Vehicles
'
|
|
|
| 3. | in the bidding document, Part 2, Section VI, 2.7.1 Contractor's Establishment on Site
'
\
I
i
i
} (page 17), please delete the seventh persgraph, starting from the second sentence,
: “The Contractor shall submit with his bid... ', in its entirety. 1
In the bidding document, Part 3, Section Vill, 13.1 The Contract Price (b) (Page 31) (b)
ii, please delete (b) ti entirely which read as;
i, The total price adjustment shail be rade after the total amount of the adjusted price |
reaches the ceiling amount indicated above.” |
in the bidding document, Part 2, Section VI, 8.4 General STD and HIV/AIDS Prevention |
and Control Programme, Scope, please delete the third paragraph in its entirety
which read as; 1
“For preparation and implementation of the ‘General STD and HIV/AIDS Prevention and
Control Programme’ the Employer has estimated a Provisional Sum resulting from an
average amount of sixty-thousand Birr (60,000 ET8) per month starting from the date
of the Commencement of Works until the end of the Defects Liability Period. The
Contractor shail state in his bid whether the estimated amount of the Provisional Sum is
sufficient or state another amount.”.
~~ End of Addendum No. ~~onstruction Works of Design and Buld of Gore Masha-Tepl Road Projet
Section Iv:
Contractor’s Offer; Appendix to Bid/Offer and Payment Schedules
Contiact Pocument
Ethioplan Roads AuthorityGore-Masha-Tepi Road upgrading Project
“Proourement of Design ar Build of Gore-Masha-Tepi Road upgrading Project”
FORM OF BID/TENDER
Date: 04" October 2018
CB No.: W/53/CB/ExImBK/2010/EFY
Invitation for Bid No.: N/A
Name of Contract: Gore - Masha - Tepi Design and Build Road Upgrading Project
To: Ethiopian Roads Authority
P.O.Box: 1770
Ras Abebe Aregay Street
Addis Ababa
Gentleman:
1, Having examined the Conditions of Contract, Employer's requirement, and Minute of
Pre-Bid Meeting, Clarification to Queries and Addendum No.1 issued on 28" August
2018 / Clarification to Queries issued on 12" September 2018 / Clarification to Queries-3
and Addendum No.2 issued on 28" September for the Design and execution of the above-
named Works we, the undersigned, offer to execute and complete such Works and
remedy any defects therein in conformity with the Conditions of Contract, Employer's
requirement, and Addenda with:
Total Lump Sum cost of [One Hundred Thirty Eight Million Four Hundred Seventy
‘Seven Thousand Dollars. 138,477,000 USD| excluding VAT; percentage proportion
for foreign currency portion (55.2%), local currency (39.9%) and ‘Third Country
portion (4.9%)
2. We acknowledge that the Appendix forms part of our Bid.
3. We undertake, if our Bid is accepted, to commence the Works as soon as is reasonably,
possible after the receipt of the Employer's Representative notice to commence, and 10
‘complete the whole of the Works comprised in the Contract within the time stated in the
Appendix to Bid,
“my
Sa
\eoton oat
39°Gore-Mesha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masho-Tepi Road upgrading Project"
5. Unless and until a formal Agreement is prepared and executed this Bid, together with
‘your written acceptance thereof, shall constitute a binding Contract between us.
6. We understand that you are not bound to accept the lowest or any bid you may receive,
Name: Sung Jin Park
Inthe Capacity off “the Bidder’s Authorized Representative
Signed: i
Signed Bees
7 {
Duly authorized “Fi
to sign the Bid for
and on behalf of:
Development Compa
Date: ‘on O4th day of October, 2018
i
|
|
|
i
|
|
|
|
- Yor !Section IV Bidding Form (Without Prequalification)
APPENDIX TO BID/TENDER
the following information must be completed before the Tender is submitted]
i
|
Note: with the exception of the items for which the Employer's requirements have been inserted,
|
Condition of Contract __| Sub-Clause Contract Data
Employers name — and] 1.1.2.1 & | Ethiopian Roads Authority(ERA)
address 18 Head Office
Main Building, 4" Floor
Ras Abebe Aregay Street (P.O. Box 1770)
‘Addis Ababa
Ethiopia |
Contractor's name and| 1.1.22 & | Hyundai Development Company |
address 18 55, Hangang-daero 23-gil Yongsan-gu, |
Tel: +82-2.2008.9097/9069 i
Fax: +82-2,2008.9013 :
Seoul,
Republic of Korea
Employer's Representative’s [7.1.23 &| Ato Habtamu Tegegn, Director
name and address 18 General of Ethiopian Roads
Authority or his delegated
representative
Ethiopian Roads Authority(ERA)
Head Office i
Attention: The Director General
Main Building, 4" Floor |
Ras Abebe Aregay Street (P.O. Box 1770) |
‘Addis Ababa
Ethiopia :
Bank’s name and address | 1.127 The Export-Import Bank of Korea
38 Eunhaengno (16-1 Yeouido-dong),
Yeongdeungpo-gu, Seoul, Korea 150-996
| TEL: 4+82-2-3779-5354
FAX: +82-2-3779-6780
E-Mail: jeuxs@koreaexim.go.kr
Attention: The Director Africa Team,
EDGF Operations Department 2
Effective Date 1132 The Effective Date shall be the date at which
| both Parties sign the Contract Agreement,
or, as the case may be, such other date at
which, if required, approval” of the
Contract Agreement by the Bank and/or
relevant authorities in the Country is
received.
Fifty four (64) months including four (4)
months for Contractor's mobilization.
_4\-Section IV Bidding Form (Without Prequalification)
Condition of Contract Sub-Clause
Contract Period 11.35 Total period of ‘Time for Completion’
plus ‘Defects Liability Period’ plus.
‘Warranty Period’.
Defects Liability Period iA Three-hundred-sixiy-ive (365) days [year]
Foreign currency 1153 Korean Won and United States Dollar
Money and Payment 11: The Contract Price is
KRW 158,252,900,370.00 (Korean Won:
One Hundred Fifty Eight Billion, Two
Hundred Fifty Two Million, Nine Hundred
{ Thousand, Three Hundred Seventy only)
including Corporate tax but excluding
any taxes which is Equivalent of USD
138,477,000.00 (United States Dollar: One
Hundred Thirty Eight Million, Four
Hundred Seventy Seven Thousands
Only) including Corporate tax but
| excluding any taxes (1USD= 1,142.81
pee | KRW)
Law of the Contract 4 The Governing Law of the Contract is the law
| of the Federal Democratic Republic of j
Ethiopia
Ruling language a With the exception of the Declaration of
Participation in EDCF financed projects, the
ruling language of the Contract is English.
the Employer's Representative and of the
| Contractor respectively and the respective
addresses shall be informed upon
Language for 14 The language for day to day communications
communications shall be English.
Time for the Parties entering | 1.5 Within twenty-one (21) days after the
into a Contract Agreement Contractor receives the Letter of Acceptance
(Notification of Award). i
‘Stamp duties. and similar [1.5 The costs of stamp duties and similar charges \
charges (f any) imposed by law in connection with !
entry into the Contract Agreement shall be !
bore by the Contractor. \
Electronic transmission | 1.8 Wil determined and instructed by” the \
systems Employers Representative .- at. the |
commencement of works, if any.
‘Address for the Recipient’s | 1.8 ‘Such communications shall be delivered, sent |
Communications or transmitted to the respective site office of |
|
|
|
vo commencement of works.
Confidential detail ov 712. None
Time for 6 and-— Possession of land for the Employers
Possession of thé Sit representative and Contractor's
Gove Masha Topi he
oN e
Cera BGS
eer RS SSSection IV Bidding Form (Without Prequalification)
Condition of Contract _| Sub-Glause Contract Data
establishment shall be effected within twenty
one (21) days after receipt of the
contractor's first written notice of
requirement. However, the Contractor shall
give to the Engineer’ with a copy to the
Employer, not less than Four months prior
notice of his requirement for the above
mentioned land requirement for road reserve
in rural section, borrow pits, quarry,
stockpiling area and Six months for road
. reserve in urban (town) section.
Performance Security 42 The Performance Security shall be an
unconditional bank guarantee in the
amount(s) of ten per cent (10%) of the
Accepted Contract Price, subject to {TB
SubClause 35.5, and in the same
currency(ies) and proportion as the. !
‘Accepted Contract Price, and which shall be
issued by a reputable bank or financial
institution selected by the contractor.
‘The Contractor shall deliver the Performance
Security to the Employer within fourteen (14)
days after receiving the Letter of Acceptance
(Notification of Award), and shall send a copy
to the Employer's Representative.
Limit of subcontracting ERO) The Contractor shall not subcontract more
than forty per cent (40%) of the Works.
Setting Out 47 ‘Without prejudice to the other requirements of
‘Sub-Clause 4.7, the Contractor shall give to
the Employer's Representative: not less than
thirty-six (36) hours written notice -of his
intention to set out or give levels for any part
of the Works. _
Time for submission of | 4.14 Within 28 days after receiving the Notice
programme under Sub-Clause 8.1 [Commencement: of
Works).
Normal working hours 65 ‘As defined in the applicable labour law of the
Federal Democratic Republic of Ethiopia.
shall be issued within fourteen (14) days after
the Effective Date, The Contractor shall
commence the design-build Works as soon as
is reasonably possible after the receipt of the
Notice to this effect, but in any event not later
than fourteen (14) days after the issue of the i
Notice, and shall then proceed with the Works i
with due expedition and without delay. i
{
t
|
‘Commencement of Works 81 ‘The Notice for the Commencement of Works |
3
—4H3-Section IV Bidding Form (Without Prequalification)
Condition of Contract ‘Sub-Clause
Contract Data
Delay damages for delay 86
0.1% of the values of the remaining works
per day (i.e. value of remaining works equals
final contract price less the value of the
completed sections already handed over to
the Employer.
Limit of liquidated damages | 8.6
for delay |
10(Ten)% of the value of the remaining
works (i.e. value of remaining works equals
final contract price less the value of the
completed sections already handed over to
the Employer.
Liquidated Damages for | 114 Not applicable.
failure to pass tests after
completion i
Total Advance Payment 132 Twenty per cent (20%) of the Accepted
Contract Price payable in the currencies and
proportions in which the Accepted Contract
Price is payable.
‘Advance Payment Security | 13.2 TThe Advance Payment Security shall be an
unconditional bank guarantee in the form
provided in the Annex to the Particular
Conditions or in another form approved by the
Employer and shall be issued by the same
entity as the Performance Security,
prescribed in Sub-Clause 4.2.
Repayment of — advance | 13.2
‘The Advance Payment shall be repaid
payment through percentage deductions in Interim
Payment Certificates as detalled in Sub-
Clause 13.2 of the Conditions of Contract (GC
and PC).
Percentage of Retention 13.3) [5 (Five) % of monthly interim payment
certificate.
Limit of Retention Money | 13.3(6) _| Five per cent (6%) of the Accepted Contract
Price.
Schedule of Payments 134 The Schedule of Payments is included in the
Appendix to Price Bid.
‘Schedule of Payments 13.46) | Sub-Clause 13.5 shall apply,
Plant and Materials for the | 13.5 The total additional amount for” Plant and
Permanent Works Materials for the Permanent Works on Site
specified under this Sub-Clause ‘shall not
exceed five per cent (5%) of the Accepted
Contract Amount.
Plant and Materials for the | 13.5(@)(¥) _| Materials for the Permanent Works Under this
Permanent Works
‘Sub-Clause shall be limited to” coment,
reinforcing steel, fine aggregate for concrete,
course aggregaie for concrete and asphalt
concrete, crushed stone road base, bitumen
and bitumen products for pavement
construction, and precast concrete units.
‘Gore-Masha-Tepi De
yySection IV Bidding Form (Without Prequalification)
Condition of Contract _| Sub-Clause Contract Data
Minimum Amount of Interim | 13.6 interim” payment —cerificates should be
Payment Certificates minimum 500 Million KRW (Korean Won)
Payment 13.7 © 88.37% KRW (Korean Won)
* 11.63% USD (United States Dollar).
Rate of Interest upon Unpaid | 13.6 Tor local currency: four (4) percent
‘Sums for other currencies: the respective
prevailing London inter-Bank On Lending
Rate (LIBOR) with annual maturity period
plus 2% and the computation will be done on
monthly basis. If the currency quoted by the
contractor does not have a corresponding
| LIBOR rate, the USD rate with annual
maturity period shall be used.
Other costs, charges and | 14.5.(b\(i) _| Five per cent (5%).
| profit for provisional sums
‘Termination 15.2 subeontracts more than the specified portion
of the — Works [Sub-Clause 4.5,
Subcontractors] or assigns the Contract
without the required agreement,
Insurance for Design 18.1 “Three per cent (3%) of the Accepted Contract
Price.
Minimum amount of third [183 Five million Birr (6,000,000.00 ETB) per
party insurance ‘occurrence, with the number of occurrences
unlimited.
Periods for submission 18.5
of insurance: a. Twenty-one (21) days.
a. evidence of insurance, b. Twenty-eight (28) days.
b, relevant policies
Date by which the DRE shall | 20.3 Twenty-eight (28) days after the Effective
be appointed Date. =
The DRE shall be comprised | 20.3 ‘One Sole Member.
of
‘Appointment of DRE (if not | 20.3 ‘Addis Ababa Chamber of Commerce
agreed) to be made by _ Sectoral Associations Arbitration Institute,
Arbitration Rules 204 Rules of Conciliation and Arbitration of the
Intemational Chamber of Commerce (ICC),
ParisiFrance, :
Number of arbitrators 204 ‘One or three arbitrators as it will be agreed by
as {the parties.
Language and Place of | 20.4 Language: English
arbitration Place: Paris/France
eee
oa &
niche Sy
nab ak
-Us-Section IV Bidding Form (Without Prequalification)
If there are Sections:
Definition of Sections: Any part of the permanent works exceeding 30 km in length, which has
been both completed to satisfaction of the Engineer and, otherwise as
provided for in the Contract, occupied or used by the Employer,
Description Value (percentage | Time for Completion | Liquidated damage
( Clause 1.1.6.9) of Contract price )* | (sub clause 1.1.3.4) _| (Clause 8.6)
‘Any part of permanent
works exceeding 30 km, |
NA
NA
N/A for sections but
for total works
* These percentages shall also be applied to the first half of the Retention money under Sub
clause 13.9
~ 46Gote-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Road upgrading Project"
‘Table: A Summary of Payment Currencies of the Bid
Local currency
296,000 296,
(USD) 55, 55,296,000
Foreign currency
(USD)
76,457,000 76,457,000
Third Country
6,724,000 6,724,000
(USD)
Net Bid Price 138,477,000
VAT NIA
BID PRICE 138,477,000
Note:
1. Although offer is quoted in USD, payment for EDCF portion shall be made only’in
Korean Won. The rates of exchange shall be applied by the calculation of the
‘amount of the Loan under the provisions of the Loan Agreement,
Title of Clause Condition of Contract] Amendments/Comments
‘Sub-Clause :
‘Approximate Weightings for | Clause 13.1 See table immediately
Price Adjustment below
-4a-Gore-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Road upgrading Project”
‘Table B. Weightings for Price Adjustment
Fixed/Nonadjustable 1s
Fuel 15-22
Bitumen TAS
Steel Reinforcement Bar 1-5
Cement 13
Equipment 32.45
Foreign Labor 1-5
Total 100%
As guidance to bidders and for the purpose of checking their submissions, the Employer has
estimated and provided a range of acceptable weightings (of the total estimate) of the allowed
i construction inputs for price variations.
‘Weightings and | Clause 13.1
"/ in the tables immediately below, bidders shall
Indices. The Contract Price
(a) indicate their amounts of payment, (b)
indicate their proposed source and base price
Findices for the different elements of cost, (c)
derive their proposed weightings for local and
foreign currency payment as indicated below,
and (d) list the exchange rates used in the!
currency conversion. If payment is to be made|
in more than one foreign currency, the bidder:
shall complete a similar table of source indices
for each currency.
reap
3 AONE
H48q
i
|Gore-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Road upgrading Project"
‘Table C. Local Currency
. Nonadjustable - . 8,294,400 AL 1S%
r[ mw noc | 16asBinlier | a si20 | wane
i National 92.75
B ‘Bitumen, Statistics Bureau, September, 2018 8,294,400 15%
US Bureau of Labor! 202.1(P)
Statistics (BLS) | September, 2018
Derba-MIDROC | 241Birr/Quintal
2,764,800 | 4: 5% |
c Cement Canine Sep. 062018 552,960 |e 1% |
National
7 104.98 ;
E Equipment | Statistics Bureau, | sesame 201g) 23224320} 2.40%
Korea
Total 55,296,000 100%
> (P) of Reinforcement : Preliminary. The BLS of US published indexes until June of 2018 officially.
‘The index will be revised after original publication.
2 Indexes for Bitumen and Equipment : To find reliable indexes, we stated Indexes of National
Statistics Bureau, Korea,
‘Table D. Foreign Currency 1 (FC1)
- | Nonadjustabte - : 11,468,530 | Az 15%
96.40
F Fact September, 2018} 16:820,540 | 2096
Sete sors] 11.468,550 | 15%
100.99
3,822,850
Statistics Bureau, Series 2018
iSeneager a 764,570 | 0: 1%
rea 28,289,090 | 37%
| September, 2018 oe E
106.00 :
7 aoa 382,850 | 5%
76,487,000 100%
ta from National Statistics Bureau, Korea.
- HA-Gore-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Roud upgrading Project"
Table E. Third Country
263.6
September, 2018
1949
September, 2018,
204.4
‘September, 2018
138.9
September, 2018
107.8()
2, 2018
1664
September, 2018,
2X These indexes can be updated by publication of the latest data from Census and Statics Department
of Hong Kong Special Administrative Region on December.
1,008,600
1,479,280
1,008,600
336,200
67,240
2,487,880
336,200
6,724,000NATIONAL OIL ETHIOPIA PLC (NOC)
Supplier's VAT Reg. No. 21901 Cape Verde Road
Supplier's TIN No. 0000059459 P.0.B0x 951 code 1250
Date of Registration 07-Aug-2004 Tel, 251-11-663-94-91/94
Fax, 25
PRICE INDEX
Date: - Suptomber 26 2018
‘To: Hyundai Development Company
Addis Ababa
Dear Sirs;
As per your request regarding price index of fuel, please be advised that price of fuel at
Addis Ababa as foliows:-
Foels
vo Period ‘Unit Price Birefliter for
4 ___ Gas oi
LS
Assuring you of our quality services at all times, we remain,
Best regards,
rg ite Ros
Seon RondeSCN LECH ALTE
BAe COA CIN TUNG:
Derba-MIDROC Cement
Private Limited Company
HYUNDAI DEVELOPMENT COMPANY
ADDIS ABABA
Subject: - Renly for. Price Index,
Dear Sirs:
As per your letter Reference N*, HDCOBT-2018-89, dated on September 26, 2018 you
have requested us a price of cement during the date of September 6" of 2018.
‘Therefore, please tind below one quintal PPC and OPC cement price at factory us
Pollows:
Ready Far Tomorrow! YF Wan Noted
S2-me. 11.18.
1s Sabartet Etats GE
Fete vs 34 Wh | ean
Babcietiow © Sf
1
| vome [swiecs | oatrtoas | puncat | conor | scone | owt |
Databases, Tables & Calculators by Subject sutton: Be,
av) @
Include anneed averages More Eormatting Qotionseai>
Data extracted on: November 15, 2018 (11:10:13 PM)
Change Output Options: For:
nude graphs
PPI Industry Data
|
|
Series td: povearticaer 0
Series TiLtot PPL indvetry deta for tron and eteet nllis aid fertoalloy ato. not seasonal iy austed
Industry? ron and steo! mite ané ferroelloy at
Progus Iron and ateo! ia and Ferroetloy af
Base Dato: eas
Download: Gatex
[aor 345.7] 151
380.21 473.5] as
109.7) 300.0
$96.0 190.71 183.7]
1756) 1783) 174.3
404.6 | 195.2) 308.4
159.0 —157.4[ 355.1] —
154.6] 187.6) — ise]
iis) 1759) 1638)
Toots { caemarons © Hate nwo Resounces
press atalance | Inffon Help Tuovas Whats Now Inspector Great (Ot)
Indvaties ele Glonce | injuryAndiness Faas Creo @BL Buegetand Porrmance
Economie Releases | | Siccceny | Bnaieoot No Feordet
Satabases & Tables | Aout JohnourWaling Lists | USAgow
Noro | Comers | Linting & Copyightine Bones gev
fom of torn kc | Pinay he ScalySttaownt | Dleckire | Cue
‘Wi dba sare ag, 2 newchanets ivena, WE Washo, DC 20100001
-HEvs4.S. 994 | Telephone: 1-202-693-5200 | TOD: 1-800-877-4390 | Contact Us
i
i
:
|
-S8°‘Gore-Masha-Tepi Road upgrading Project
“Procurement of Design aiid Build of Gore-Masha-Tepi Road uparading Project”
CT Producer Price Index
Source : Statistics Korea
Download Date : 2018. 12. 18
Table URL :
http://kosis.kr/eng/statisticsList/statisticsListindex.do?menuld=M_01_018:vwed=MT_E
TITLE&parmTabld=M_01_01#SelectStatsBoxDiv
KOSIS seme, Q woe sn
Stats Database azaton Bultn Boer About Koss
‘Statistical Database
Proce
[fete tsaa cg ttn eID
* pradoce rie tndones (si Groups)
© ote psotos om: 2016-11-20 f Teen ¢ Monsey. Quarry, Arent 9658.01 ~ 2008.10 : Fae
EE cs tensions) =m
=o Gao GOGO
meiner
renm‘Gore-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Road upgrading Project*
(Consumer Price Index
Source : Statistics Korea
Download Date : 2018. 12. 18
Table URL :
http://kosis.kr/eng/statisticsList/statisticsListindex.do?menuld=M_01_018vwed=MT_E
TITLE&parmTabld=M_01_01#SelectStatsBoxDiv |
KOSIS sense, Q vere ean
Statistical Database Visuaization Bulletin Board About KOSS
Statistical Database
oP by en
ee eee ee <>
* €P1 by Commortes & Seevices( 2015-100)
(Ge te 201842467 Trn amy, Oty, amet R= i8sE
Yc evi yeoman ts a
i SS. GEBGGS
ae San ey |
fiir ess |
: fe | |
Le
mre
en Roads SL
“$57—S RaRIITTEE RRM
‘Consus and Statistics Department
Hong Kong Special Administrative Region
AERC LRA RAHM (2003 4 4 Fl = 100)
INDEX NUMBERS OF THE COSTS OF LABOUR ANDMATERIALS
[USED IN PUBLIC SECTOR CONSTRUCTION PROJECTS (APRIT, 2003 = 100)
2018829
SEPTEMBER 2018
2 blnnn 28 4 203 #64
PART At Index Series with April 2003 as Base Period (Le. April 2003 = 100)
JRL item ‘eve
Inder Nab
ie ibou
AE (LATER) Compute shou wages fr civil engnerng contacts 1654
STR BREN) ‘Comps sbour wages fr biking cotacs 1
sume Sele mails
we Agerogntes 197.6
ee Bitumen 194.9
epee Caneree blocks 124
dost Diesel fil 20.6
a Glass 169.8
RTE Glazed ceramic wall tiles: 202.6
wx Fadwood 23.2
seen Homogeneous Noo tes 1787
ea Galvanised mild steel 357.7
eB ‘Mea former 1967
ees Mossic tiles 212.6
ae Paint 1342
SDMKIE RHE) Portland cement (ordinary) 1389
» Send 10189
IRR ‘Steel reinforcement 2044
TAS ‘Teak 263.5
ABE ‘Timber formwork 202.2
SRE UPC pipes 1548
RARE GMS pipes 180.7
Zi: ASA aa
‘PARI: nde Sekt wth Othe Base Peiode
seal bl lee
‘ae Selected materials
6; (2008 9/3 =100) ‘Copper pines (September 2003 100) 28
ERE Notes:
(@) LRH AURATMUEAUEAAEARIL (1 The index mombers of the cost) of labour and materials are compiled for
A OMIRASNTIRA MERA working out the increaseldecease of payment to the main contctors of public
SOR » Fb» AIABLFLATATAATRM — saotor covsirvetion projens to adjust for the change in cows. Tho costs of
TERRA LE EMRE ARSE labour Indios ‘horefore only cover publi secior construction projecis_nnd
SceescanAR « reflect the changes in Isbour costs boene ty main contactor of public sector
‘construction projets.
0) HRA REA — AMET» AM BRSE 2) TE copper pipes cost dex ie a new index sess with dam calection
2008S» SRM cemimenced since 2008. The indox adopts Sopenber 2008 a the bus period
‘IGHECHTZOOREE9Fml00) SERRA (Le Septabec 2008~ 100) and is inden Jove isnot dcelly companble with
AGB ADEs ep ee her se
RL Rape RTA
HEB IRaAT-
‘URRGR (#52) 3803 78:
mcrae: (ws2) 2127 sen
PBL: costetion
shout Corts of Labour and Mterals Tadioen can bo divested Price
Research Section, Census ad Stasis DepartmentGore-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Road upgrading Project”
Schedule of Named Specialist Subcontractors*
; Name and Stotement of
item Element of work | APPravimate) caress of Similar works
subcontractor executed
HIViAIDs HIV/AIDS 01% Tobesummited — | ‘Tobe summied
Dongsung Engineering
Co, Lid
a 39, Seongam-ro 21-gil,
Dein | eit Design ™% Seongam0 218 | part flow
Gyeongsangbuk-do,
Republic of Korea
arth Work
& 36.9% Tobesummited | Tobe summited
Drainage
Gassing Slope areas 1%
4. The bidder shail enter in this schedule a list of the specialized works and approximate value of
the work for which he proposes to use specialist subcontractors, together with the names and
addresses of the propased subcontractors.
~
»
Project Name: Preparation of
Baucau to Viquoque) (
Contact Value: US!
Period: Sep. 2014
Vorkd Bank)
“Contract Value: U
“Period: Sep. 2008 ~ Fix:
‘Description: Road Design =
|Gore-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Road upgrading Project”
»
“Project Name: “Reconstruction of'the Road ‘Border of the RF (Samara)- Shymkent’ km 1807-1837 through Oral,
Akiobe, Kyzylorda Cities (Kyzylorda Bypass)” (funded by World Bank)
Contract Value: US$ US$ 0.27 Mil
“Petiod: Aug, 2008 ~ Feb, 2011
Des Road Design
4
“Project Name: “Reconstruction of the Road ‘Border of the RF (Samara)- Shymkent” km 2183-2216+100" (funded
by World Bank)
‘Contract Value: USS USS 0.25 Mil
Period: Sep. 2008 ~ Oct, 2010
‘Description: Road Design
3)
Project Name: Hinhrwup to Road Construction Project Contract Section “C" and "1D" (Nonhay-Banvang-Sanakhara)
Preliminary Designs and Detailed Final Designs
“Contract Value: US$ USS 2.01 Mil
Period: Jul. 2007 ~ Jan, 2008
‘Description: Road Design
6
Project Name: Consulting Services for the Detailed Design, Preparation of Bidding Documents, Construction
‘Supervision and Post Construction Supervision for Samar Pacific Coastal Road! Project (funded by EDCF)
Contract Value: US$ USS 2.00 Mit
Period: May 2015 ~ Apr. 2020 (Ongoing)
Deseription: Road Design and Construction Supervision
”
Project Name: Basic and Detaled Design for Scoul to Sejong Expressway Anseong to Guri Construction Projest
(Section 3)
‘Contract Value: USS 5.14 Mit
Period: Apr. 2016 ~ Sep. 2017
‘Description: Road Design
8)
Project Name: Basic and Detailed Design for Sejong~ Pocheon Expressway and Anssong ~ Gy
(Section 11)
-Coniract Value: USS 12.01 Mil
Period: May 2016 ~ Dee. 2016
Description: Road Design
»
“Project Name: Detailed Design for Netional Alternative Bypass Road (Bukil~Namill) Construction within
Cheongiu City
‘Contract Values USS 1.76 Mil
‘Description: Road Design
10)
Project Name: Detailed Design for Suwon Outer
Build Contract)
‘Contract Value: USS 4.78 Mil
Period: Sep 2014 ~ Jun, 2016
Description: Road Design
jGore-Masha-Tepi Road upgrading Project
“Procurement of Design and Build of Gore-Masha-Tepi Road upgrading Project"
SPECIALIST SUBCONTRACTOR INFORMATION SHEET
Siem
Bidder’s legat 7
ame Hyundai Development Company
Subcontractor’s
Legal Name DONGSUNG ENGINEERING CO, LTD
Subcontractor’s
country of Republic of Korea
constitution
Subcontractor’s |
year of 04 September 1991 |
constitution !
Subcontractor’s
legal address in| 39, Seongam-ro 21-gil, Gyeongsan-si, Gyeongsangbuk-do,
country of Republic of Korea
constitution
Sauebadraciar’
Sauaeet "S| -Name: Chang Won Jung / Senior Managing Director
representative Address: 39, Seongam-ro 21-gil, Gyeongsan-si, Gyeongsangbuk-do,
oe Republic of Korea
Address: Tel ers: (+82)-2-2041-8731
Tuna ‘elephone numbers: (+82)-2-2041-
numbers/fax Fax numbers: (+82)-2-449-0584
numbers: E-mail address: jow58@dsen.co.kr
e-mail address:
Attached are copies of the following original documents.
[i 1. Articles of incorporation or constitution of the legal entity named above, in accordance
with ITB 4.1 and 4.2.
Q 2. Authorization to represent the firm named in above, in accordance with ITB 20.2.
3, Incase of a government-owned entity, documey lishing legal and financial
autonomy and compliance with commerspdagrinacetagce with ITB 4.5,a Seotion IV Bidding Form (Without Prequalification)
SCHEDULE OF PAYMENT CLAUSE 13.4
Measurement and Payment provisions of the construction specification shall be Lump sum
basis and shall be paid upon completion of each of the work items indicated below as per the
percentage proportion provided herein.
1. The weighted average percentages of the contract price of each of the work items for
payment purposes are indicated below:
Ttem ‘Work Tiem ‘Weighted average
No. = (6) out of the total
: contract amount
1. | Survey, Investigation and Design as per the Employer's
requirement,
Eighty percent (80%) of the amount for the executed
length with respect to this work item shall be released
afler approval of the full design work of the executed 3
length by the Employer's Representative, The remaining
twenty (20%) shall be released after the earthwork for that
particular length of the project is fully completed. It is
anticipated that no redesign work will be carried out after
completion of earthwork.
Z| Series 1000/Division 1400 Project/Eimployer's
Representative Facilities as per Employer's Requirement,
80% shall be used for the provision of the Employers
Representative Facilities and corresponding payment shall 5
be released for the percentage completed of this work
Item as approved by the Employer's Representative. The
remaining 20% shail be released on monthly basis for the
entire contract duration excluding mobilization period (the
first 4 months),
3 [Series 1000/Division —1300/Detour and Traffic
Management 3
4,__| Series 2000 Site Clearance and Serious 4000 Earthwork 36
5. | Series 3000 Draina;
__| Major Structures
| Series 5000 Sub-base & base courge-——
7. | Seties 6000 Asphalt Work ae MaRS 23
nf bss
Culverts, Series 8000 Minor and 15
Series 9000 Ancillary
‘Gore: Masha-Tepi Design and Build ReSection IV Bidding Form (Without Prequalification)
Marking, ele
9. Social, Health, Safety and Environmental Protection and i
Mitigation Measures
Il, Each of the above work items are in compliance with ERA’s 2013 Standard Technical
Specification,
III, At the end of cach month, the contractor shall submit a statement, showing the amounts
to which the contractor considers himself to be entitled on the bases of the works
mentioned in item 1), 2), 3), 4), 5), 6), 7), 8) and 9) above. The estimated amount of the
monthly statement shall be the value of the works executed up to the end of this month.
‘The following formula will be used to calculate the amount of monthly statement.
TPCy = [(Ac~ Ap) + (Be — By)*Pn] ~ Advance Repayment — Retention Money
Where:
- IPC, + is Interim Payment Certificate of the n" period or month
A:~ is the cumulative value of the work items I & 2 listed under Item No. I
above, for which A is calculated as follows:
A= {(((LEVL1)*3%"80%) + (LE /LT)*3%*20%)] + [(PCPS%*80%) +
((ET-TE) (CD-TFY)*5%"20%)]}"CA
- _B:~is the cumulative value of the work items 3, 4, 5, 6, 7, 8& 9, listed under
Item No. L above, for which B is calculated as follows:
[LE ALT*3%]H(LEs/LT)*36%) + [(LESLT)*15%) + ((LESLT)*11%] +
[(LEr/LT)*23%] +[(LBa(LT)*2%}4{(LBo/LT)*2%] }*CA
- PC— Percentage Completed of Employer's representative facility as approved by
the Employer's representative.
~ TF time given for provision of Temporary Facilities
= ET Elapsed contract time in months, ET shall not be less than TR.
‘ontract duration in months
- LE - Length completed of each work item and it varies from work item to work
= LT ~ the assumed total length of the project for payment purpose. In this case LT
equals 140.66 km, The total length could be revised after the final design of the
whole project length and each payment certified to that date should also be
revised accordingly.
- CA~is the contract amount.
- Pn—Price Adjustment Factor
~ a Itis assumed that theref
4) has been completed,