PERUNDING TEKNIKAL
CONSULTING ENGINEERS
4th & 5th Floor, “STALLION’, Sublot 17, Rock Commercial Centre,
‘elle, Jalan Rock, 93200 Kuching, .0. Box 299, 93704 Kuching, Sarawak, Malaysia,
Tel: 60-82-248182, 242986 Fax: 60-82-420276
Email: pengcon@gmail.com / chint23@pe.jaring.my
Your Ref: Mir-140363(4090) Date: 30 January 2015
Our Ref: 5140/125/14/LKK/VN
Regional Manager
Syarikat SESCo Berhad
Regional Office
Jalan Pujut Satu
P.O. Box 104, 98007 Miri
Sarawak
Attn: Tuan Haji Awang Iderus Bin Awang Rambli
Dear Sir,
RE: APPLICATION FOR CONSTRUCTION OF NEW SUBSTATION ON THE APPROVED SUBSTATION SITE
NO. 2 TO REPLACE THE EXISTING MIRI PORT SUBSTATION ON TURNKEY BASIS
~ Completion Certificate
Reference is made to the HT/LT Turnkey Project for the above mentioned project.
We are pleased to forward herewith three (3) sets of the completion certificate for your necessary
action.
‘Thank you.
Yours faithfully
for PERUNDING TEKNIKAL
—_-
DENNIS CHIN
cc. Pantai Bayu Indah Sdn. Bhd., Attn: Mr. Anthony Neg (letter only)
Encl.APPENDIX H
COMPLETION CERTIFICATE
MIR — 140363(4090)APPENDIX H
‘Turnkey-Completion Certificate
Page 1 of 13
Turnkey Projects Completion Certificate
To: SYARIKAT SESCO BERHAD
Completion Certification is to be submitted in triplicate by the
Contractor/Consultant responsible for the construction of the installation, or an
alteration thereto: -
A. Note is neeby given that electrical installation work hs been cred tat the undermentionedpremise() and thatthe
inaallton is now completed and the same ae herby handed over to you as olmer thereof. AS from the date of this
handover, SESCo shall assume responeblis forte instalation including its maintenance, provided that this handover
sal ot in ay way affect our obligations under any waranty given us for the Sad astallation or our Habity darn the
‘etet Hablity period any),
°T TITLE: COMMERCIAL DEVELOPMENT AT LOT 147, 1408 &
1445, BLOCK 9, MIRI CONCESSION LAND
DISTRICT, MIRI, SARAWAK.(PART OF MARINA
PARKCITY MIRI-PH3) ~ TURNKEY
SESCO APPROVAL REF: MIR - 140363(4090)ie |
Ad ae QOSaS sesTOUTONS
wyozz | woe | ms | wuss x ory Buysixg 0 (94) | 17
ree UWoNMAUISIC| JOAAL MON WOdSL
Ad ‘aigeo 0838 Sesnoudous
woze | wos | ms | ,wuse x or Buyers o} (4):EIId | 17
| aerx WoNRGUISIG ONAL MEN WO
; ‘Ad ‘aiqeo OoSas Sesnoydous
oso | ose | oc | MOF MBNONL ORNS | wer | wor | mms | ;wws6x or Buns 04 (ys)ettd | 17
3 iad WoNNAUISIG SONAL MON WOdsL
‘Ad Teli UONNGLASIC
oe | ose |e | tempamesonmt | woe, | uy | aenny | yucee Jad) Man one a9
gx | ep ib wano0s MAN wold
daw
: uoreuuuersoopur | yy Badawi souuoysuel, eey'/LL wAnO0s
08 oz’ 8 por zug xoy, | WEL | woe | Re) wuiseL x OVE | men of Wa ADIL MeN Wold | LH
Bex
: : aaani
7 i wor yBnosy, iyBIERS iadGn NIN ILE ang MAN OF B99
oo | ooo | oz Aout zwugarx ore | WOEr | Wy | Troe! | ewuissh xo | UN GoeSe ang Sunsxg wor | LH
| Fad 1x
| BdaW
: : uoneutue,, s0opu adn TINY AOHEL AAS MAN 0 AIge
oo: =| oze'z |» | ay zumgey xoe | WORE | wor | TESEN | juicer xo | Me G ang 6unsxq wo. | LH
| fad
wa) a
yg | 1809 | ALD uondussoa soo | wbuer | adh ozis
ers asn SevaIeW 1040 sieynonied 1425 uoneso7 g aweN speed | ATL
TTavoaNnowowaann 1a
zaig
3 on aata-AoyUR'
| |_|
| [Lt
| +
| 4
TIN
(330 °ON 107.
we wv (nn) suun | ‘on esnoudous)
‘1509 uonelteIsu—|1809_| AV vonduosag 3809 | unbuey | edkz | ozig | jo'oN ‘YoHe907
Beer Sere Jeu Ta Soo
ONTMIM SNIVIN “va
a = —
oe
‘TIN
(wna) | Gna) | Lene
ysog | 4809 fidizoseq_| 3809 | w6ueq | zig | 1s09 | wbuer | adki _| seomagysuedg uone907 9
Luoneueyeer = pesn stevaiew 19u10 Siejnaqyeg io}anpUoD ‘sieinomed 80d J0'ON wen sopeag | ALVLH
SHOIWIS ONVANITGVIHYEAO © ca
au =
_ —- |
(we) (wa) }—_—— "TIN
1309 | ¥809_| qup-+—vworduaseg | seg | wnBuey | ody os
| owe posn sieuIeIn 00 | Sre\nonied o1Ge5 wones01 8 owen s9p04 | LH
Favoanuvwans «zaTes UAL
ua earont|
(wahsoo | (i) exe
uonenersu | SOD. HePOW 40"ON y6ue7 azs. adhe | sayiossa90y
TIN
9 | twa i
3809 sujod | oBenem pur
uopenersay |" 3809, syewod goon | Gumi jo odAy uoneeysuj yo adky, woRe907
5 duso-Koyusny,
‘ONIHOM 1aaa1S
“sa(eum usenao fue es eed owe)
oH je unite sos 4 vo no PaES Ue EU SN WON OL,
Sabra vouso -feqm, ome lah me
“TRON HORIow 0002 = a-N
oop Koqien,
060 ‘ow o002=N~@ ‘OW 0002 = N~A ‘ON G002 = Nw Careeo 90 onaivmasaTx uunee 99 |
SWHOKS AOCOL WN 0002 = @- A WIN 0002 = B~ HIN GD0Z=A-¥ | Gung ah rent ie
‘OW 0002 = 3-@ ‘GW 0002 = 3- A ‘UW 0007 = 3-4 a ad eee
IN 000% = 3-N
oton | ‘ow ooo = Na “ON o00e=N-A"OMooG=N-u| “OREO MOORS WNEE OR |
nsiuoky AOOOL “BI 0002 = = A “OW 0002 = B= 8 "OW 0002 = A-¥ | gunsneag 04 (a).eited UoNrenNe Sm
‘UW 0002 = 3-@ "UN 0002 = 3- A ‘OW 0002 = 3-4 need 01 (Geld UORNAUISIG JONAL MEN Wl
‘UW 0002 = 3-N 7
sete ‘sw 0002 = n1~@ ‘on oon2= n-A‘ocoo=N—] «ARO PO.ONaMASTAET wUBE OP)
‘nsiwofyy NOVO! “OWN 0002 = B~ A ‘OW 0002 = €-¥ "OW 000Z=A-4 | 5 en
‘UW 0002 = 3 —@ ‘OW 0002 = 3— A ‘UW 0002= 3-4 UNSIXA 0} (Y4)JEIld UORNGUISIG 49M MON WO}
I (@192D ND DAdMMVITATX WOES OLX -)
228520 4 , puouie sa” 8 wild Gonnauasia sons |
nsyHof AQOOL WW 0002 = 3-8 UW 0002 =A- AWN 0002 = 3-H | pony 0) ouuojsuedy cert VAr00S MON WO!
psn
a oem 1e21 vonsneul camino
avo oNNONOWION oT +19
ipa pp og ape om)
AMWINWNS SLINSIY LS3aL 0TIN =
|
—reermninaen
769] woHeNSUT
‘SuIeN ZepaeI
NTT GVSHUSAO NOISNAL HOW
TIN al
pean
aaa 801 uonelnsuy ‘owen s0po0d
‘S3DINNSS GNV SNM GVSHUSAO NOISNAL MOT
TIN a
asi
a ISOL ase uonejnsu, owen sopeoa
dwog-Koyuny,
9
0
7i |
sro ssouanbag eseud
na [ose ne
A jose NA ‘
n | oz wal ¥ eee
A | eer we UW suonesngy yodoy
: ysoL o1s0}oy
reid eee SAT ny e820
A | cep A _|
suield~ BAM
eishelew
AH A wSL e wyo £0 Luoeyi-s | ‘Wis woos
ezis “ON (ewes s-N)
Sony | dey | souepaduy Suywea | “oN teuos | oneW WA
USWUOISNVEL 99
[
v a-aau
v Ua, uoday se, ono}
v a-A
y Ane
Beye Be10n 1801 uoneisans vecezerza | _eisferew oowvL
on 1eu0s ovew edAL
TeoByoUAS
“$0
31@V9 ANINVINENS/ATEV9 NOISNAL HOIH ONY YVaSHOLIMS
Banker’s Guarantee Reference No.Tumkey-Completion Certificate
Page 10 of 13,
F. LETTERS OF APPROVAL / LAND TITLES / WAYLEAVE / AS-BUILT
DRAW!
The following copies of approved letters and land — titles from the various
Sections/Departments/Council/Landowners as well as Wayleave, cable routes,
profile and as built drawings ete., are attached herewith as follows:
Letter/Drawing Reference | Dated Approved by Approv
a 2 Given for:
Tabatan Tanah dan Survei
1. 20/TP/4D-MMC?25/00/5 22/01/2014 Wayleave
Bahagian Miri
2. 6 inMCCPW-18(11)2014 | 13/062014 | Majlis Bandaraya Miri | Wayleave
3. @ SRNWD ACESS MRIBTU |
1510772014 | Telekom Malaysia Berhad | Wayleave
8500 PTEKNIKAL/VOL4
Kementerian Kemadahan
4. KKAENWYLI062014265 | o4/062014 | Wayleave
wam
: Sarawak Gas Distribution
5, SGD 3807/14 23/07/2014 Wayleave
Sén.Bhd,
Taku Management Sdn.
6, LAKU/C/WL(47-2014) ovoono4 | Wayleave
G. CERTIFICATE OF THE INSTALLATIE!
| certify that the installation listed above has been tested with the results shown
therein and that to the best of my knowledge and belief, it complies with the IEE
regulations and SESCo requirements. The installation has been tested in
accordance with both the requirements and has satisfactorily passed the tests
specified therein.
Name of address of Consultant/Professional Engineer (Electrical):
Peruding Teknilcal
4" & 5" Floor, ‘STALLION’
Sublot 17, Rock Commercial Centre,
1% Mile, Jatan Rock,
93200 Kuching,
Sarawak.
iv. Street Lighting
The said street lighting installation works has been inspected and tested on
sssoossssees and certified satisfactory for connection.
Cettified by: cesses
Name Signature
ee
Designation Datevi.
‘Turnkey-Completion Certificate
Page 12 0f 13,
General
The above said installation works are approved for connection to the SESCo
system and the 12-months performance period to be carried out shall commence
from this date
Certified by: .... !
eceeesaeeae /
Name Signature
Designation Date
Commissioning
‘The above said installation works has been commissioned on
Signature Designation DateTurnkey-Complation Certificate
Page 13 of 13,
Our Ref: MIR — 140363(4090)
Date:
‘Your Ref:
To: Perunding Teknikal
4" & 5" Floor, ‘STALLION’
Sublot 17, Rock Commercial Centre,
1% Mile, Jalan Rock,
93200 Kuching,
Sarawak.
Dear Sir,
Commissioning Of The Installation
We refer to your completion certificate Application Reference No. . Dated
4 sos. and are pleased to advise you that the new installation as mentioned
therein has been passed and commissioned on .......... ..... and therefore the 12-
months performance period shall commence from the same date of commissioning.
Further, please be reminded that SESCo may extend the performance period after the said
12-months performance upon unsatisfactory performance of the said installation.
Costs incurred in any rectification works carried out by SESCo personnel due to failure of
the installation arising from defective equipment/materials or poor workmanship shall be
deducted from your performance bond during the performance period(s).
‘Yours faithfully,
FOR SYARIKAT SESCO BERHAD
(REGIONAL MANAGER)
** A copy each of the Completion Certificate, after project completion shall be
dispatched to Regional Manager and Manager (C&B), Head Office,
‘One copy shall be retained by the Consultant/Contractor,‘Turnkey-Taking Over Certificate
Page 1 of
APPENDIX!
TURNKEY PROJECT TAKING-OVER CERTIF
CONSULTANT/CONTRACTOR: Perunding Teknikal
PROJECT TITLE: COMMERCIAL DEVELOPMENT AT LOT 147, 1408 & 1445,
BLOCK 9, MIRI CONCESSION LAND DISTRICT, MIRI,
SARAWAK.(PART OF MARINA PARKCITY MIRI-PH3) -
Turnkey
REFERENCE: MIR — 140363(4090)
This is to certify that the above works have already been taken over by
SARAWAK ELECTRICITY SUPPLY CORPORATION on neuen
accordance with the work Scope of Specifications and subject to the
observations/exceptions endorsed herewith: -
Observations/Exceptions
SYARIKAT SESCO BERHAD
Dales . bevescrsvessnssossseae cee
Jalan Bulan Sabit, CDT 220, 98900 Miri
SET Tel, 9085-42143 Fax: 085-429823
(321785-K)
Our ref sqp 3807/14
Your ref: 5140/043/14/LKK/VN
Date: 23 July 2014
Perunding Teknikal Consulting Engineers
4" & 3 Floor, STALLION
SIL 1% Mile, Jalan Rock
93200 Kuching
Sarawak
Dear Sir,
Re: Marking of Utility Services
Reference is made to the above.
Returned herewith the site plan, which we have marked our existing underground MDPE gas
‘main pipe for your attention and information, However, itis very important that you liaise
with us closely for site inspection on our underground facilities before work commence as
some of our pipeline maybe very shallow.
Under the Sarawak Gas Supply Ordinance 1995, you are to ensure your contractor observe
strictly the following during works
Never carryout any unauthorized repair but to contact us immediately should any of
cour facilities are damaged during works.
- Never deposit any material, soil, stone, ete. on our isolation valve surface box.
- Never remove or relocate any of our Gas Pipe or Gas Valves (GV) marker post
No mechanize excavation shall be carried out in the vicinity of our underground gas,
installation,
As our ges pipeline is not design to take heavy load, any heavy machinery (lorry
excavator) running or sitting directly above any of our underground facilities, shall be with
the used of temporary mechanical protection (1/2” steel plate or timber decking) to spread out
the load.
Should you need any clarification and information, please do not hesitate to contact the
undersigned at tel. No 085-421423,
‘Thank you.
Yours faithfully,
for SARAWAK GAS DISTRIBUTION SDN. BHD.
LJ
Chua Sing Wan
(General Manager)AED coon
Th
Ruj. Kami: ( 3. } SRNWD ACESS MRIBTU 8500 PTEKNIKAL / VOL4 Date: *Suuly 2014
PERUNDING TEKNIKAL
4m & 5% FLOOR “STALLION”
‘SUBLOT 17 ROCK COMMERCIAL CENTRES
1 1/2 MILE, JALAN ROCK
93200 KUCHING
SARAWAK
Attn: EN DENNIS CHIN
Dear Sir,
Re; PROPOSED COMMERCIAL DEVELOPMENT AT LOT 1407, 1408 AND 1445 (PARENT LOT 1359) BLOCK 9 MIRI
CONCESSION LAND DISTRICT, MIRI, SARAWAK
~Wayleave Application for SESCO Underground Cable installation
Your letter ref: 5140/043/14/LKKIVN dated 28 May 2014
We are pleased to inform you that we have no objection to your proposal subjected fo the condition below.
‘Your proposed plan is only agreed for a period of 12 months from the date ofthis letter. Re-application is
needed ifthe validity date expired.
‘Thank you.
‘Yours faithfully,
ROHAIAA ABDUL LATIP
Manager
ACCESS MR/BTU (TMW)
Telekom Malaysia Berhad
Bangunan SKDL Jalan Temenggong Oyong Lawai Jau
98000 Miri
cc. Head, Operation & Maintenance Sarawak - Up Razis Bin Paiman
“elokom Malaysia Berhad (1297407)
AND MIRLEINTUUL
‘Telekom Malaysia Bashad, Bangunan SKDL, Jalan Termenggona O,
Tel 085-435017 Fox 085-435257 sw tr.com rey
Leva Jou 99000 tiTaIW
Loy are.
VUVHVONIG NIP BOP L/LOPEKEMENTERIAN KEMUDAHAN AWAM.
UNIT MERINYU ELERTRIK
TINGKAT 11, WISMA SATOK
JALAN SATOK, Telefon Am : 082-258258
‘93400 KUCHING Fax : 082-259843
SARAWAK Website + wew.mpu.sarawak.goumy
uj. Tuan
uj. Kami: KKAVEMWYLIO6-2014/266
Tarikh: 04 June 2014
PERUNDING TEKNIKAL
4TH & STH FLOOR, STALLION,
SUBLOT 17, ROCK COMMERCIAL CENTRE,
112 MILE, JALAN ROCK,
93200, KUCHING.
SARAWAK
Tuan,
WAYLEAVE APPLICATION : PROPOSED COMMERCIAL DEVELOPMENT AT LOT 1407. 1408 AND 1445 (PARENT
LOT 4259), BLOCK 9. MIRI CONCESSION LAND DISTRICT. MIRL SARAWAK
We acknowledged receipt of your application ref: KKAVENWYLI14/119 dated 30 May 2014 referring to the above
proposed insialiation works generally as shown in the attached drawing no. 5140WAYLEAVEIO",
Please be informed that we have no objection to raise with respect to the above application for wayleave, subject,
to the following conditions:
(2) Compliances with the Electricity Ordinance and Rules;
(b) — Compliances with the requirements of the relevant highways cades and regulations;
(©) Referred and comply with the requirements of the relevant parties such as Syarikat SESCo
Berhad, Land and Survey Departments, Telekom and other telecommunication providers,
water supply authorities, Jabalan Kerja Raya Sarawak and local councils,
Thank you.
"BERSATU BERUSAHA BERBAKTI'
"AN HONOUR TO SERVE"
‘Yang benar
Cr
{SYED MONAMAD FAUZI SHAHAB)
‘Director of Electricity Supply
Ministry of Public Utilities
SARAWAKJABATAN TANAH DAN SURVEI x
BAHAGIAN MIRI Fy
a g, 8000 Mir, Sarawak, Malaysia
nO, 435001, 496002 Fas: 065-478191 ° °
wakgosmy E-mot lanésuvey@sarawaknetgovry 4a
Wiema Pets Turk
Telefon. 085-255:
Ruj. Kami:
Ruj. Tuan:
C Sep ppeee —
19/PB/40-PG/WAYLEAVE(1 )VOL. 10 Tarikh: 31.10.2014
5140/057/14/LKK/VN Tarikh: 07.08.2014
Tetuan Perunding Teknikal,
4 & 5" Floor, ‘STALLION’, Sublot 17.
Rock Commercial Centre,
1% Mile, Jalan Rock,
93200 Kuching
Tuan,
WAYLEAVE APPLICATION FOR PROJECT :-
PROPOSED _COMMERCIA
1445( PARENT LOT 1359
MIRI.
=LOPMENT AT LOT 1407, 1408 AND
K MIR! CONCESSION LAND DISTRICT.
Your letter ref: 5140/057/14/LKKIVN dated 07.08.2014 refers.
2. There is generally no planning objection to the above application subject to the
followings for your necessary compliance, please :-
i). The installation of posts. ducts, cables and boxes are to be strictly done in
accordance with standard road cross-section.
ii). To obtain legal consent from the registered proprietor if the proposed works
affect private lands/private properties/where applicable.
ili). Any damage made to the existing carriageway, concrete drain, footpath, e!c
are to be made good at your own costs as soon as possible.
iv). The adherence to rules and regulation as may be imposed by the relevant
authorities.
“ BERSATU BERUSAHA BERBAKTI ”
‘AN HONOUR TO SERVE"
Yang benar.
b.p. Penguasa Tanah Dan Survei, NOV 201
Bahagiar: Miri 25 NOV 2054
An rtg2ncy ta Fancticate Developmentt L/eke Management Sdn. Bhd.
om eva overamet fSaanek)
Corporate Office
61h Floor, Soon Fup Tower, Lot 907, Jalan Merbau,
‘98000 Min, Sarawak.
‘Tel: 088-442000 Fax: 085-442005
ear 35744)
Our Ref.: LAKU/C/EPIWL (47-2014)
4 June 2014
PERUNDING TEKNIKAL
4" & 5" Floor, ‘STALLION’
Sublot 17
Rock Commercial Centre
4 %Miile, Jalan Rock
93200 Kuching
Sarawak
Attn: Mr. Dennis Chin
Dear Sir
WAYLEAVE APPLICATION FOR PROJECT: PROPOSED COMMERCIAL
DEVELOPMENT PROSECT AT LOT 1407, 1408 AND 1445 (PARENT LOT 1359),
BLOCK 9, M.C.L.D., MIRI, SARAWAK
~ Wayleave Application for SESCo Underground Cables instaliation
Your letter Ref. 5140/043/14/LKKNN dated 28" May 2014 an the above stated refers.
We have no objection to the alignment of your proposed network.
We return herewith 2 set of your drawings with our pipelines marked, for your
information.
Thank you.
Yours faithfully
RSTONG Kal
Chief Executive Officer
Encl,
Contact Officer: Mr. Zaid Iskandar @ 085-442069 or 019-8856891
ALSTON,
Jd
Mist Area Office Bintulu Area Office Limbang Area office
‘th Flor, Soon Hp Tower, Lt 907 ‘cultan Inkandar, ot 850, Jalan Pandarcan,
‘lan Merbau, 98060 Mir, Saruwale ‘ 0, Box 988, 98700 Limbane, Sarawale
Si'086-s42000 Pax O8S-442042 314820 Yel 086-218639 Fax O88-218085MAJLIS BANDARAYA MIRI
Jalan Raja, 98000 Miri, Sarawak
‘Tet :085-493439 (Setiausaha Bendaraya)
Tel :085-433601, 423504, 433505 (Sambungan kepada Semua Jabeten}
Fax :085-415486
wee. miricouncil,gov.my
Kami: 63 in MCC/PW.18(11)/2014 43" June 2014
BB. Tuan: §140/041/14/. KKIVN (MCC Bill: 0094213)
PERUNDING TEKNIKAL CONSULTING ENGINEERS
4” & 8" Floor, Sublot 17,
Rock Commercial Centre.
11/2 Mile, Jalan Rock,
93200 Kuching, Sarawak
Fax: 082-433660
Tuan,
WAYLEAVE PERMIT
PROPOSED COMMERCIAL DEVELOPMENT AT LOT 1407, 1408 AND 1445 (PARENT LOT
41389}, BLOCK 9, MCLD, MIRI, SARAWAK
‘Your above application which reached on 12" June 2674,
Plea: informed th
strictly to comsly wilh the
Wayleave Permit is hereby granted to the above project snd you are
lowing provisions and conditions:
1. This Wayleave Peimitis for the road under Miri City Councils jurisdiction area only.
rit compliance t© be observed by you and your agenticontractor of alt conditions
stipulated under the MCC's “Schedule for thie instruction fo Applicanis who intend to
submit Aplication for the Instaifation of Public Utility Services within the road
reserved under MGC Jurisdiction” {hereinafter referred to ae the “said Schedule", in
particular that of Clause 4.0,),
‘The folowing are additional comments to the above submission plan as specified in that
i ‘Clause 3,9(g) ~ Shall be superseded: The laying of service shall not in any
where be allowed to punch through any drain culvert or charine!
‘You shalt advise your contractor or person who intends to cary out the works to apply to this
Council for a Digging Permit at least 14 days before the execution of work on site in
acoordanee with Enclose Clause 4.1.10, 4.1.11. 4.1.12, 4.1.13, 4.1.14 of the "said Schedule,
No work of any sort can be carried out without first obtaining such Digaine Perit,
4. For the purpose of Clause 4.1.12 of the said Schedule, the amount of money to be
deposited with this Council shall be RM 7,500.00 of RM 6,000.00 and below shall ba paid by
cash while more than RM 6,000.00 payment cai; be made in the form of Bank Guarantee /
Cash),
5. Atthe time of applying for Digging Permit, photocopy of Approval for Wayleave from al other
relevant authorities shall also be atlached for Cousncifs recard and reference purpose,
6 You! shall indemnify the Council against any olaim, either incidental or consequential, If any,
arising from your works and you are advised to exercise safety precautions at all fimes,
7. To comply with aii the relevant By-laws of Miri City Council,
8. To comply with ail the requirement of "OCCUPATIONAL SAFETY AND HEALTH ACT
1994" & Sarawak Road Ordinances 1994,9. Unless otherwise approved, all utlty installations laid across the road under the pavement
shall be done by means of trench less horizontal tunnelling technique,
10. The contractor to notices to the landscaping Unit of Miri City Council as early as possible, to
inform them on any affected plants with in the road need to be transplanted or removed.
11. The contractor to submit a copy of the Public Liability Insurance to this Council for record
purposes.
12, You shall be responsible to provide a project signboard which indicate / display
the project title, telephone contact and the name of contractor at the work site.
13. This Approval automatically becomes void should there is any objection from other
relevant Approving Authorities to this application.
14. This Permit does not cover the approval for the installation of your instruments and other
apparatus fo any buildings,
15. This Permit is only valid for 12 months from the date of this Wayleave Permit,
16. Attached herewith the Wayleave Processing Fee BillReceipt (RM 50.00) and the
endorsed two (2) sets of drawings with the Schedule of Quantities of Works for your
further action,
‘Any negligence to the above conditions may lead to the withdrawal of this Wayleave Permit and
you have to pay for the cost which this Council deem necessary for any reshifting/re-
routingiremoving the service lines/fly-overimanhole/hydrant/chamberlvalve,clearing of site and
repairing of road/drain/culvertfootpath,providing appropriate warning signs,hazard lights and
etc.
Your full co-operation in this matter is very much appreciated.
“BERSATU BERUSAHA BERBAKTI”
"AN HONOUR TO SERVE *
Saya yang menurut perintah,
Yr
Ww
(CHE ABU BAKAR BIN'CHE SAID)
at ‘emg. Setiausaha Bandaraya
failis Bandaraya Miri.Falan Raja, 98000 Miri, Surawak.
i
(085-433439 (Setisusshe Bandaraya)
BIL PELBAGAI / MISCELLANEOUS BILL
MAJLIS BANDARAYA
N
IRI
14, 433305 (Sarmbungan Kepads Semus Jabatan)
Perunding Teknikal Consulting Engineers No. Bil
4th and Sth Floor, sublot 17, Rock Commercial Centre, 1 Bill No.
Mile, Jalan Rock,
93200 Kuching, Sarawak Tarik Bil
Bill Date
Cod Akaun
Account Code
Bil Rujukan
Bill Reference
moo94213
12/06/2014
0106011010
63 MCCIPW-
18(11)2014
KETERANGAN AKAUN / PARTICULARS OF ACCOUNT
AMAUN / AMOUNT.
Wayleave application foe for proposed commercial development at Lot 1407, RM 50.00
1408 and 1445 (Parent Lot 1368), Block 9, MCLD, Mil, Sarawak
| Sila Jolaakan Pembayaran Di Kauntor MBM Sebolum Tarkh Akh Pembayaran
TARIKH GENAP PEMBAYARAN —gaiq7/0914 RM 50/00
DUE DATE FOR PAYMENT
‘ser 1D vassinma
Date Printed : 12/08/2014 15:36:30
torinajmisn yang enyaistan dongan ania brotakAppendix 1-1
FORM MCC/RP1
ou Reference
Date
To:
Cig Secretary,
‘Mist Cry Counett
Min
(1) G@)__ Name of Applicant: Syarikt Sesco Berhad
(b) Adress: SyarkatSesco Berhad, Regional Oifice (NR), P.O. Box 104, alan Pajut Satu, 98007 Mir
(©) Telephone: _085-652020/ 658524 661111 _ Fax No: 085-656415 ee
@ Project Name: Proposed Commercial Development on Lot 1407, 1408 and 1445, Block 9, Miri Concession Land District Mir
Sarawak (Part of Marina Parity Misi ~ Phase 3)
3) @__ Name of Officer Superintendent Works: To be advised
(©) Designation: 7 be advised (©) Telephone: To be advised
(4) Description of Works: (i separate sheet maybe used if space provided is insufficient):
‘To lay Sesco underground cables f isting underground ¢
5. Proposeddate of commencement ofinstillaion: Tobe advised
6. Expected date of con Tobeadved
7 Brolosed dovument
8) Cheque (Service Order! Work Order: CIMB Bank — 277691.
b) Completed Schedule of Quantites of Works( Appendix 1-2 in triplicate)
©) 3 set of drawing/s No...5140/WAYLEAVE/D1,
Having examined the ‘schedule for the instruction to applicants who intend {o submit application for the installation of public
tility Services within the road reserves under MCC jurisdiction * we the undersigned agreed to abide by the Conditions as stated
the Schediule to bear fully whatever costs incurred due to
(@ Installation of the Utilities
Gi) Reinstatement of the roads and
ii) Future relocation of the uiities due to improvement / widening.
am
Oiticer Name and Designation
Department Offical SealAppendix 1-2
Schedule of Quantities of Works
For (Project Title): -
Tem | Location and description of works Teagth in metre | Rates | Total Deposit
oR to be paid
nos of works @my
T | Wenehing on wad verge WA 2oim
Z| wenching on bitumen road Wa
rensing og he Buen road 3m Tom [7.50000
b._| trenching cease road WA 150m
3. Trenching affecting other road Textures suchas footpath, drains, WA
culverts, guardrails a rate shall apply as follows:
‘+ fortrenching less than 100m the rate shall bee fixed sum
RM2,000.00 .
+ fortrenching exceeding 100m, this shall be RM 2,000.00
| plus
+ RMS00.00 per subsequent 100m or part thereat
Oikes oe ae - fe
a Grand | 7.50000
z total
Remaris: The above rates are only applicable to 300mm wide teach,
=
Prepared by: sss
Name af Applicant Repzesentative & official sel
Date:
(Checked and agreed byway eens
MCC Representative
Date: {2+ [o f20hgSYARIKAT SESCO BERHAD (672931-)
PEEASE PRODUCE THIS FORM INTACT AT TIME OP PAYMENT. IP WILL BE RETURNED WITH THE RECEIPT MACHINE PRINTED.
Name + Pantai Bayu Indah Sdn Bhd Company Code 1000
Lot 1547 lin Temenggong Datuk Customer Number 3007519
Oyong Lawai Jau Bill Document Number: 1400147825
98000 MIRI Revenue Code 0100
Sarawak Malaysia Bill Requesting Section: 340105
Bill Isuing Section 340107
Profit / Cost Center 340101
Date 12.01.2015
PARTICULARS _ AMOUNT (RM)
Ref, No.: MIR-140363(4090) 17,800.00
Being payment of connection charges & project administration fee for
(Construction of New Substation on the approved Substation Site No.2 10 :
replace the existing Miri Port Substation to Pantai Bayu Indah Sdn Bhd
of Lot 271-272 Brighton Cente Jalan Temenggong Datuk Oyong Lawai Jau
Miri - Turnkey Basis,
Ref: MIR-140363(4090)/A ANS dated 30/12/2014
(Ringgit Malaysia: SEVENTEEN THOUSAND EIGHT HUNDRED AND SEN ZERO ONLY)
‘Note: ‘This bill sto be paid on or before 31.03.2015, failing which the amount is subject to revision
with interest charge thereon, 5
TOTAL eee12/0% 2015 12:16 #7868 P_ 002/004
Vorvi zu29 11:58 AA UssoaDa19 SENT SESCU MIKE jgovr/vu
sarawa Nerersy
Our Ref: Mir-140363(4090)/AA/nj
Date: 30 December 2014
Perunding Teknikal,
Consulting Engineers,
4" & 5" Floor, “STALLION’,
SubLot 17, Rock Commercial Centre,
1% Mile, Jalan Rock,
93200 Kuching.
Fax: 082-420276
Dear Sir,
Re: Application for construction of new substation on the approved substation
site no, 2 to replace the extating Miri Port Substation an Turnkey Basis.
-CC release.
Thank you for your letter ref: 5140/090/14/LKK/VN dated 29/10/2014 and your email
dated 09/12/2014
The connection charge required tor the above project to be carried out under turnkey
basis is RM17,800.00 of which the breakdown cost is as appended below
Item | Rescription | aa
sone (RM)
T. | Project Administration Fees 10,000.00
“OT ) Materials & Services Supplied By SESCO ~ "7,860.00
= Substation & Pilar Paciock
U/G cable fault Indicetor
‘Shuraown publication and testing fees:
Total 17,800.00
‘The above estimate is subjected to revision in accordance with the General Terms and
Conditions as stipulated in the attached Form DS 1/2014 and will expire on
31.03.2015.
Please take note of the following: -
1. Prior to commissioning of supply, to furnish an amount of RM25,000.00 either in
cash or banker's guarantee being the performance bond for all installation works,
defective materials or equipment other than transformer. The performance bond is
to be made valid for one-year period.
2. Prior to commissioning of supply, to furnish another amount of RM25,000.00 either
In cash or banker's guarantee being the performance bond for the transformer and
made valid for two years period.
Northern Region Headquarters
falan Rs Sat, Sarawak Energy Berhad (907199 2) Tas 052.020
8097 Mir Ravine lets, 93080 Kuhng. Fvn8s 686 498
sen sarawakenengy com.my
Sarawok, Malaysia, Sarawak, Malaysia.12/01.2015 12:16 #7868 P. 004/004
98/01 2015 11:59 FAX ossesoais SYKT SESCU MLKE mvuer ee
Ds 1/2014
SYARIKAT SESCO BERHAD
eneral And Conditi r Release O!
A. Nalidity Period,
The Connection Charge is valid for six months following the date of release.
B. ceptas ind P: Of Connection Chi
1. Confirmation of acceptance and full payment of Connection Charge must be received by
Syarikat SESCO Berhad {here-in-after called the Company) within the validity period
mentioned above.
2. Where payment Is to be made by monthly instalments, both the first down payment and
Banker's Guarantee must be furnished to the Company, within the validity period.
3. In the event of default of any instalment payment, the Company may make a claim on
the Banker's Guarantee in any manner deems appropriate.
4, The Total Connection Charge payable excludes the applicable Goods and Services Tax
(GST) imposable with effect from 1 April 2025 in accordance with the Goods and
Services Tax Act 2014, Any payment, including monthly instalment, made on or after 1
April 2015, irrespective of the date of invoice, a GST, at the prevailing rate in
accordance to the Goods And Services Tax Act 2024 and any amendment thereof, shall
be levied and charged.
C. Project Delay
Where project delay on the part of the applicant/development preventing the Company
from completing its installation within a period of three years, the Connection Charge may
be revised.
D. Turkey Projects
For turnkey projects, the following fees will be charged:
1. A Project Administration Fee equivalents to RM20.00 per kVA or RM 300,00, whichever
is the higher, will be charged for ail turnkey projects.
2. An Engineering Fee equivalents to 3.0% of the Connection Charge released or RM5,000,
whichever is the higher, will be imposed if the customer opts for turnkey project after
Connection Charge has been released,12/01-2015 12:18 27658 P. 003/004
08/01 2015 11:58 FAX 85656615 SVKT SESCO NTRI 1g002/00:
3. You are required to submit a copy of Land & Survey Department's approved survey
plan before the commencement of the substation civil works. This is for us to verify
the correctness of the surveyed pegs for the substation.
4, The technical specifications of your SOOKVA 11/.433KV EFACEC Distribution
Transformer, Tamco Malaysia RMU, Spaner Distribution Pillar and 185/3C AL
Southern Cable are acceptable for use in our system. The final approval would only be
given by our Asset Policy & Specification (AP & S) Division after the factory acceptance
test (F.A.T) has been performed. Failure to comply may result In delay in electricity
supply connection to the said development,
5. Works can only commence after the above connection charge settled, the kick-off
meeting has heen conducted and the approval of the materials stated on the item 4 has
been given. If any works are done before these conditions are met and without our
knowledge, any non-conformity in the standards of work done sivall be rectified at your
own cost. Kindly liaise with our Project Engineer at telephone no, 085-652020 for the
arrangement of kick-off meets once the connection charge has been paid,
6. The existing SOOKVA 13/.433KV transformer(S/NO. 1740413), EPE RMU serial
No:KSS/160 and Distribution pillar have to be returned to our electrical store after
commissioning of the new relocated Miri Port Substation.
7. Any approval given by the Company shall net exonerate the consultant/contractor
from any responsibility in connection with the whole installation and also subject to
final testing and taking over.
8. Al correspondence, drawings and document submitted to us must be stamped and
signed by your Professional Engineer.
9. Other terms and conditions #s specified on our Handbook on application of electricity
supply and the Distribution Service Circular No 2/2009 on the Design, Construction &
Supervision of Electrical Works by Professional Engineers should be adhered to.
Your acceptance of the estimate should be addressed to our Regional Manager, Syarikat
SESCO Berhad, Regional Office, Jalan Pujut Satu, P. 0. Box 104, 98007 Miri or fax to
085-656415 and please quote our reference number in all your future correspondences
pertaining to this project.
Yours faithfully,
19 Tderus Bik Awang Rambli)
NAL. MANAGER (NR)sarawat\onerey
CERTIFICATE OF COMPETENCY FOR NON-EMPLOYEE
CERT, NO. CCMTICONT/D582
(TECHNICAL)
A. PERSONAL PARTICULARS:
Name : -Lau Hieng Ching
fomvanys + Durasonic Sdn. Bhd. LCNo. =: 601003-13-5351
No. 38, 43t Floor, Tabuan Stutong
Address : Commercial Centre, Jalan Satta Raja,
98350, Kuching, Sarawak
Position Held" : ‘Cable Jointer Paw et + 03-Oot1960
B, PERMITTED SCOPE OF WORK(S) - TYPE & RATED VOLTAGE:
Rated Voltage
Work
Up To 11kV (Heatshrink & Taping)
HV Cable Jointing
C, PERMISSION TO PERFORM LOW VOLTAGE SWITCHING:
Not Authorize to carry out Low Voltage Switching.
D, AREAS OF OPERATION:
Valid for all aréas of operation throughout the Company.
E. VALIDITY PERIOD: io
‘TWO (2) years from the date of issue,
Date of Issue: 11 October 2012 Chairperson
Date Reissued: 27 October 2014 Competency, Authorization and Allowance !
Valid till; 26 October 2016 Committee
(SITI AISAH BT. ADENAN)
‘The certificate holder Is require to take nacassery cir end saely precautions while perfoming work and to ensure that
works ae carried out In accordance wth SEBISESCO's standard operating pectcs. The Contee shell nc be held
responsible for any accident or incident which may aio tram any werks cared cut by the cates nots
(atid within Sarawak Energy Berhad only)a
4 STM TRANSFORMERS SDN BHD
No.Syarikat : 183369-X
q Lot 1976, Section 66, Jalan Semangat, Pending Industrial Estate, 93450 Kuching, Sarawak, Malaysia
Tel: 082-337641, 338085 Fax: 082-480781
[TEST REPORT OF NEW DISTRIBUTION TRANSFORMERS|
CUSTOMER
SPECIFICATION
‘TEST STANDARD
BB Hw EB OM lO lo ok ok
SUMMARY OF TEST OUT
DATE OF TEST
sa
JOHN HO & COMPANY, MIRI
3-Phase 50H2 300KVA 11/0.433kV Dyn 11 ONAN,
SERIAL NO: $-143019
Quantity :1. unit
3-Phase SOHz SOOKVA 11/0.433kV Dyn ONAN
SERIAL NO: $-143017, $-143018,
Quantity : 2 units
3-Phase SOHz 1000KVA 11/0.433kV Dyn11 ONAN
SERIAL NO: $-143012, $-143020
Quantity :2 units
HEC 60076
ROUTINE TEST
October 2014
SESCO Witness By
STMQ.C. Tested By
‘STM Checking By
, ee ee ee ee |
fp fe
Bong Shin Shon
: Kao Che Jen \Q ABEEBE EBB HK KK KS SA Ke
mpEEE EB EB
STM TRANSFORMERS SDN BHD
TRANSFORMERS TEST REPORT
fcustoMeR [JOHN HO.& COMPANY qwe [onan | pateortest | seotas
CAPACITY, SOOkVA FREQUENCY SOHZ PHASE. 3 QUANTITY, 2 units
paimany VOLTAGE 11550-11275-110008-10725-104s0v__| SECONDARY VOLTAGE a33/250v
earor] EXGTING | NOLOAD | IMPEDANCE | LOAD | ToTAL | EFFICENCE | REGULATION
ance] current | tosses | votts | tosses | tosses
oar (sec)
SERIAL 100(%) (wy) (%4) (wy (w) (6) 100(%6)PF_
no: 1000 ‘4100
$-143017_| (.1) 411 HI | ord | SoSe | 99-00 2042
s-143018_ | 1.2] a3 4o | Ast | S040 4.00 ody
INSULATION | TeSTcOND | _P-e Ps $8 [AMBIENT
RESISTANCE. 1000(V) — 2000M0 2000M0 _|TEMPERTURE 70 °C
DigtecTRIC | _CGes | __P-SE SPE [DURATION OF TEST
Test Sontz 7aKV 3.0KV 1. MINUTE GOOD
INDUCED VOLTAGE TEST [B66 om T7sec___|6000
PHASE COIL RESISTANCE PRIMARY SECONDARY
AT TAP 3 AVERAGE (0) LBS AVERAGE (m0) Io
foniexcnce vest —SskN/eqmforahours [GOOD
WITNESS BY CHECKING BY OCTESTay
Hog bgee | cea, Ss
Baro] ee,-T6S'TY 989'%h OsZ'ey Slevy | 696Sb ojjes “uj payes del
oos'ty | 006 ty 000'rr oorsr. | 00797 ones pareidel| yeowy prepuers
600'%y | STT'ey Ozz'vy Sze'St Tevov one: ew payed dey
| R8'/e O\G th ooh 3213 | geegn u-2 < v-o
OCS'Ih th | corn | bers | ore 9h | ura |< 2-a | goers
9A | ASG | Saoah | lalsh | cleo une a-v
Lelih | iLetr | s7bth | hols | 9bi oh un ae
SbbI> (eer | Sibty | 09S | SCI u-q 2-8 LTOEHTS
vega [other | looks | balsa | tie th eee
Ss v € z il ‘Aiepuooas | ‘ewig
onew del ‘ORIeUUOD ABQUINN [e]495
pTOz 42q020 OE #359340 He
NWNO TTUAG AYEED‘0/TT WA%00S ZHOS aSeyd-€ ¢ H9ULOysUEW Jo AyedeD
dNOYD YOLISA GNV IS3L OLLWY
T8L08p-280 :xe4 SBOBEE ‘TH9LEE-Z80 ‘IAL
yemeres ‘BuIyoNy OSPEG ‘212159 [eLISNpU] Suipuad “JeBUeWUAS UeIeT ‘99 YONDAS ‘946T 101
GEERT : ALEKS “ON )
GH NGS SYHSIYOASNVUL WLS
PPP PrPrrrrrrerer_eeectee