Sto - Domingo RCPC Model

1. This document provides details for construction of a concrete pipe culvert including: excavation, aggregate base course, 0.23m thick concrete pavement, 0.46m diameter reinforced concrete pipe culvert, and grouted riprap. 2. It includes a cross section diagram of the culvert showing material layers and dimensions. 3. The culvert will be constructed at station 0+021km to provide drainage.

Uploaded by

yeti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Sto - Domingo RCPC Model

1. This document provides details for construction of a concrete pipe culvert including: excavation, aggregate base course, 0.23m thick concrete pavement, 0.46m diameter reinforced concrete pipe culvert, and grouted riprap. 2. It includes a cross section diagram of the culvert showing material layers and dimensions. 3. The culvert will be constructed at station 0+021km to provide drainage.

Uploaded by

yeti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1.

00
0.46m Ø RCPC (3 UNITS)
w/ 1Ln.m. GROUTED RIPRAP
STAT 0+ 021 ITEM 505 - RIPRAP & GROUTED RIPRAP
DEPTH: 1.45m.
LENGTH:1.00m. WIDTH: 0.25m.

0.650

0.10
ITEM 311 (1)c1 - PORTLAND CEMENT CONCRETE
PAVEMENT (T= 0.23m)

0.15
NGL ITEM 201 - AGGREGATE BASE COURSE (0.15m)
ITEM 500 (1) a2- PIPE CULVERTS 460mmØ)

ITEM 103 (1) a- STRUCTURE EXCAVATION (COMMON SOIL)

0.650
ITEM 505 - RIPRAP & GROUTED RIPRAP

0.460
0.624

LIMITS:
STA. 0+021KM.
BRGY. STO. DOMINGO- ZONE 2

TYPICAL CONCRETE PIPE CULVERT


BRGY. STO. DOMINGO- ZONE 2 NOT TO SCALE

LOCATION MAP ITEM


No. SCOPE OF WORK
NOT TO SCALE
2.50 100 CLEARING & GRUBBING
0.25
0.25 0.23M. THK. X 2.5 M. WIDTH PCCP (3000psi) ITEM 311
105 SUB-GRADE PREPARATION

201 AGGREGATE BASE COURSE


0.46M. DIA RCPC
311 PCCP

0.22
0.15M. THK AGGREGATE BASE COURSE
500 RCPC

505 RIPRAP & GROUTED RIPRAP


.600

0.23
SPL I PROJECT MARKER

SPL 2 PROJECT SIGNAGE

0.15
0.10

NGL NGL
1.450
.650

RCPC - 1 RCPC - 2 RCPC - 3

WATER BED WATER BED


.20

0.25
ROAD SECTION "A"
NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT TITLE: PREPARED BY: CHECKED BY: REVIEWED BY: APPROVED BY: SHEET CONTENT: SHEET:
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT
KALAHI CIDSS - NCDDP
CONCRETING OF ACCESS ROAD
ENGR. NICKO G. RANON AR. CHERRIE G. CLARITE ENGR. ARCHIE P. PRAGATA MS. ARLENE B. PALACIO 5
AS SHOWN
PROJECT LOCATION: MCT-TECHNICAL FACILITATOR ACT-TECHNICAL FACILITATOR MUNICIPAL ENGINEER BDC-TWG CHAIRPERSON
8
STO. DOMINGO, BULA, CAMARINES SUR

C:\Users\user\Desktop\arkitekton logo.jpg