1.
00
0.46m Ø RCPC (3 UNITS)
w/ 1Ln.m. GROUTED RIPRAP
STAT 0+ 021 ITEM 505 - RIPRAP & GROUTED RIPRAP
DEPTH: 1.45m.
LENGTH:1.00m. WIDTH: 0.25m.
0.650
0.10
ITEM 311 (1)c1 - PORTLAND CEMENT CONCRETE
PAVEMENT (T= 0.23m)
0.15
NGL ITEM 201 - AGGREGATE BASE COURSE (0.15m)
ITEM 500 (1) a2- PIPE CULVERTS 460mmØ)
ITEM 103 (1) a- STRUCTURE EXCAVATION (COMMON SOIL)
0.650
ITEM 505 - RIPRAP & GROUTED RIPRAP
0.460
0.624
LIMITS:
STA. 0+021KM.
BRGY. STO. DOMINGO- ZONE 2
TYPICAL CONCRETE PIPE CULVERT
BRGY. STO. DOMINGO- ZONE 2 NOT TO SCALE
LOCATION MAP ITEM
No. SCOPE OF WORK
NOT TO SCALE
2.50 100 CLEARING & GRUBBING
0.25
0.25 0.23M. THK. X 2.5 M. WIDTH PCCP (3000psi) ITEM 311
105 SUB-GRADE PREPARATION
201 AGGREGATE BASE COURSE
0.46M. DIA RCPC
311 PCCP
0.22
0.15M. THK AGGREGATE BASE COURSE
500 RCPC
505 RIPRAP & GROUTED RIPRAP
.600
0.23
SPL I PROJECT MARKER
SPL 2 PROJECT SIGNAGE
0.15
0.10
NGL NGL
1.450
.650
RCPC - 1 RCPC - 2 RCPC - 3
WATER BED WATER BED
.20
0.25
ROAD SECTION "A"
NOT TO SCALE
REPUBLIC OF THE PHILIPPINES PROJECT TITLE: PREPARED BY: CHECKED BY: REVIEWED BY: APPROVED BY: SHEET CONTENT: SHEET:
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT
KALAHI CIDSS - NCDDP
CONCRETING OF ACCESS ROAD
ENGR. NICKO G. RANON AR. CHERRIE G. CLARITE ENGR. ARCHIE P. PRAGATA MS. ARLENE B. PALACIO 5
AS SHOWN
PROJECT LOCATION: MCT-TECHNICAL FACILITATOR ACT-TECHNICAL FACILITATOR MUNICIPAL ENGINEER BDC-TWG CHAIRPERSON
8
STO. DOMINGO, BULA, CAMARINES SUR
C:\Users\user\Desktop\arkitekton logo.jpg