0% found this document useful (0 votes)
82 views4 pages

Surat Penawaran - Ahmad Amin

This document provides a price quotation for mechanical, electrical, and plumbing works. It lists the items, quantities, units, unit prices, and total prices for various equipment and components. Some of the major items included are pumps, piping, valves, air conditioning units, a generator set, electrical panels, and installation works. The total estimated cost for the plumbing works is Rp. 55,908,000. The total for air conditioning is Rp. 64,075,000. A 100 KVA generator set is quoted at Rp. 50,000,000. Electrical works are also included.

Uploaded by

david 7482
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views4 pages

Surat Penawaran - Ahmad Amin

This document provides a price quotation for mechanical, electrical, and plumbing works. It lists the items, quantities, units, unit prices, and total prices for various equipment and components. Some of the major items included are pumps, piping, valves, air conditioning units, a generator set, electrical panels, and installation works. The total estimated cost for the plumbing works is Rp. 55,908,000. The total for air conditioning is Rp. 64,075,000. A 100 KVA generator set is quoted at Rp. 50,000,000. Electrical works are also included.

Uploaded by

david 7482
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PENAWARAN HARGA

Volume Satuan Harga Satuan Harga Total (Rp)


(Rp)
3 PEKERJAAN SMEKANIKAL & ELEKTRIKAL
3.A PEKERJAAN PLAMBING
A Pekerjaan Peralatan Utama

1 Pompa
Pompa Deepwell ( ex grundfos, pedrollo, inoto, ebara ) 1,00 Unit 1200.000 1200.000

Kapasitas : 0,5 kw 2 m3 / h - Head : 50 m, inc accessories ( kabel wlc, pemasangan wlc, dll )
Package Booster Pump, Kapasitas : 20LPM, 0,09kW + Flow Switch 2,00 Unit 350000 700000

ex shimizu, wasser, sanyo


Ground Tank FRP 1 m3 15,00 m3 100000 1500000

panel fibreglass inc accessories pipa, dll


Roof Tank 3 m3 silinder stainless kerucut ex penguin 1,00 Buah 3350000 3350000
inc accessories pipa konektor, dll
Biotank 5000 L 2,00 buah 6500000 13000000
2 Valve
Foot Valve Diameter 1" PVC 2,00 Buah 12500 25000
( inc saringan ) ex finn, kdj, sanking, dcota
Ball valv dia. 1/2" PVC 2,00 Buah 16000 32000
ex finn, kdj, sanking, dcota
Ball valv dia. 1" PVC 12,00 Buah 20000 240000
ex finn, kdj, sanking, dcota
Check valve dia. 1 " pvc 4,00 Buah 23000 92000
ex finn, kdj, sanking, dcota
3 Strainer
Strainer dia. 1" pvc 4,00 Buah 180000 720000
saringan clear transparan pvc
4 Vent
Vent Out ( VO ) 3,00 Buah 25000 750000
AAV dia 15 mm 2,00 Buah 20000 40000
5 WLC
Water Level Control ( WLC ) 3,00 Buah 200000 600000
ex omron, fort, larkin ( inc electroda dan aksesoris )
6 Pemipaan ex rucika, wavin, vinillon, champion
PVC Dia. 1/2” AW 2,00 1M' 6000 12000
PVC Dia. 1”AW 35,00 1M' 12000 420000
PVC Dia. 2”AW 8,00 1M' 24000 192000
Material bantu (Elbow, Tee, Knee, Reduser, dll ) 1,00 Ls 1500000 1500000
7 Panel Pompa 1,00 ls 500000 500000
Harga Satuan Harga Total
No. Uraian Pekerjaan Volume Satuan
(Rp) (Rp)

B Pekerjaan Lantai
B.1 Lantai 1
Instalasi Lantai :
1 Valve
Ball valv dia. 1" PVC 6,00 Buah 20000 120000
2 Pemipaan PVC air bersih, bekas, kotor, vent : ex rucika, wavin, vinillon, champion
PVC Dia. 1”AW 100,00 Meter 12000 1200000
PVC Dia. 4” D 50,00 Meter 85000 4250000
Material bantu (Elbow, Tee, Knee, Reduser, dll ) 1,00 Ls 3000000 3000000

B.2 Lantai 2
Instalasi Lantai :
1 Valve
Ball valv dia. 1" PVC 6,00 Buah 20000 120000
2 Pemipaan PVC air bersih, bekas, kotor, vent : ex rucika, wavin, vinillon, champion
PVC Dia. 1”AW 75,00 Meter 12000 900000
PVC Dia. 4” D 50,00 Meter 85000 4250000
Material bantu (Elbow, Tee, Knee, Reduser, dll ) 1,00 Ls 2000000 2000000

B.3 Lantai 3
Instalasi Lantai :
1 Valve
Ball valv dia. 1" PVC 6,00 Buah 20000 120000
2 Pemipaan PVC air bersih, bekas, kotor, vent : ex rucika, wavin, vinillon, champion
PVC Dia. 1”AW 50,00 Meter 12000 600000
PVC Dia. 4” D 50,00 Meter 85000 4250000
Material bantu (Elbow, Tee, Knee, Reduser, dll ) 1,00 Ls 1500000 1500000

C Sistem Air Hujan


1 Roof Drain :
- 5,00 Buah 80000 400000
2 Pemipaan PVC D Kelas 10 kg/cm2 : ex rucika, wavin, vinillon, champion
- 100,00 Meter 85000 8500000
- 1,00 Ls 500000 500000

SUB TOTAL PEKERJAAN PLUMBING 55.908.000

3.B PEKERJAAN PENGKONDISIAN UDARA


A. Peralatan Utama Air Conditioning
1 Lantai 1 : Setara Daikin, Mitsubishi, LG, Toshiba,
Indoor + Outdoor Unit Split Kap :9000 BTUh 23,00 unit 400000 9200000
2 Lantai 2 : Setara Daikin, Mitsubishi, LG, Toshiba,
Indoor + Outdoor Unit Split Kap :9000 BTUh 28,00 unit 450000 12600000
3 Lantai 3 : Setara Daikin, LG, Toshiba, Mitsubishi
Indoor + Outdoor Unit Split Kap :9000 BTUh 26,00 unit 500000 13000000
4 Pekerjaan Instalasi
#VALUE! 400,00 m' 40000 16000000
Pipa Drain aw 1" 200,00 m' 12000 2400000
Titik Instalasi Daya untuk Indoor Unit AC type Duct 10,00 ttk 125000 1250000
Titik Instalasi Daya untuk Wall Mounted 77,00 ttk 125000 9625000

SUB TOTAL PENGKONDISIAN UDARA 64.075.000

3.C PEKERJAAN GENSET / RUANG GENSET


1 Unit Genset, Kapasitas : 100 KVA, silent type, standard volt : 400/230 V, out Freq : 1,00 Unit 50000000 50000000
2 Daily tank stainless, Kapasitas : 500 Liter 1,00 Unit 2500000 2500000
3 Hand Pump 8 lpm 1,00 Unit 500000 500000
4 Pemindahan genset ke Pondasi 1,00 Ls 10000000 10000000

3.D PEKERJAAN ELEKTRIKAL

A INSTALASI ARUS KUAT


A.1 Panel Utama di Ruang Panel
1 MDP BANK ( mcb ex schneider, siemens, mitsubishi ) metering ex ewig, fort, tab 1,00 Unit 25000000 25000000
Box Panel ( 200 x 120 x 100 ) cm Horizontal Ip 65 Cat powder coating RAL 7032
2 Control AMF & ATS Lengkap dengan : ( mccb dan arrester ex schneider, 1,00 Unit 25000000 25000000
Arresster,MCCB motorized 60A, Battrey Charge, AMF Module, relay, timer , wiring
3 Pengkabelan Daya
Dari Genset ke Panel ATS/AMF NYFGBY 4x6 mm2 20,00 Meter 30000 600000
4 Grounding Sistem
Earting pit/bak kontrol grounding 1,00 Buah 400000 400000
Grounding Sistem ( Rod Grounding 5/8 3 meter full tembaga ) 1,00 Buah 350000 350000
Kabel BC 50 mm2 2,00 Meter 20000 40000
Testing grounding < 2 ohm 1,00 Ls 500000 500000

A.2 Instalasi lantai


A.2.1 Instalasi Lantai 1
1 Panel Daya Listrik : Kabel Listrik ex Supreme, kabel metal, kabelindo
Harga Satuan Harga Total
No. Uraian Pekerjaan Volume Satuan
(Rp) (Rp)
1,00 Unit 2000000 2000000

1,00 Unit 2000000 2000000

2 Kabel Daya Listrik : ex Supreme, kabel metal, kabelindo


50,00 Meter 20000 1000000
50,00 Meter 20000 1000000
3 Tray : terpasang lengkap dengan perkuatan dan support/hanger penggantung
60,00 Meter 25000 1500000

5,00 Meter 25000 125000

4 Fixtures lampu, terpasang


53,00 Buah 30000 1590000
112,00 Buah 20000 2240000
12,00 Buah 25000 300000
5 Saklar & stop kontak ex panasonic, philips, broco
10,00 Buah 20000 200000
18,00 Buah 20000 360000
15,00 Buah 25000 375000
6 Titik Instalasi dalam konduit PVC HI ( High Impact ) Kabel Listrik ex Supreme, kabel metal, kabelindo

177,00 Titik 85000 15045000


15,00 Titik 85000 1275000

A.2.2 Instalasi Lantai 2 :


1 Panel Daya Listrik : Kabel Listrik ex Supreme, kabel metal, kabelindo
1,00 Unit 2000000 2000000

1,00 Unit 2000000 2000000

3 Kabel Daya Listrik :ex Supreme, kabel metal, kabelindo


75,00 Meter 20000 1500000
75,00 Meter 20000 1500000
4 Kabel Tray : terpasang lengkap dengan perkuatan dan support/hanger penggantung

60,00 Meter 20000 1200000

5,00 Meter 25000 125000

5 Fixtures lampu, terpasang


121,00 Buah 20000 2420000
24,00 Buah 30000 720000
26,00 Buah 25000 650000
6 Saklar & stop kontak ex panasonic, philips, broco
5,00 Buah 20000 100000
14,00 Buah 20000 280000
12,00 Buah 25000 300000
7 Titik Instalasi dalam konduit PVC HI ( High Impact ) Kabel Listrik ex Supreme, kabel metal, kabelindo

171,00 Titik 85000 14535000


12,00 Titik 1020000

A.2.3 Instalasi Lantai 3 :


1 Panel Daya Listrik : Kabel Listrik ex Supreme, kabel metal, kabelindo
1,00 Unit 2000000 2000000

1,00 Unit 2000000 2000000

3 Kabel Daya Listrik :ex Supreme, kabel metal, kabelindo


100,00 Meter 20000 2000000
100,00 Meter 20000 2000000
4 Kabel Tray : terpasang lengkap dengan perkuatan dan support/hanger penggantung
60,00 Meter 25000 1500000

5,00 Meter 25000 125000

5 Fixtures lampu, terpasang


49,00 Buah 30000 1470000
22,00 Buah 20000 440000
63,00 Buah 25000 1575000
6 Saklar & stop kontak ex panasonic, philips, broco
10,00 Buah 20000 200000
18,00 Buah 20000 360000
14,00 Buah 25000 350000
7 Titik Instalasi dalam konduit PVC HI ( High Impact ) Kabel Listrik ex Supreme, kabel metal, kabelindo
134,00 Titik 85000 11390000
14,00 Titik 85000 1190000

SUB TOTAL PEKERJAAN ELEKTRIKAL 143.350.000

3.E PEKERJAAN PENANGKAL PETIR


1 AIR Terminal ( EF ) 1,00 Buah 1500000 1500000
kurn R 60 -80 , sertifikat LMK-PLN Indonesia
Harga Satuan Harga Total
No. Uraian Pekerjaan Volume Satuan
(Rp) (Rp)
2 Coaxial Cable 2 x 35 mm2 25,00 Meter 35000 875000
3 Connecting Sleave 1,00 Buah 500000 500000
4 Lightning Counter Stroke 1,00 Buah 700000 700000
5 Electroda Pentanahan 1,00 Buah 3800000 3800000
6 Obstruction Lamp 100 w 1,00 Buah 500000 500000

SUB TOTAL PEKERJAAN PENANGKAL PETIR 7.875.000

3.F PEKERJAAN TATA SUARA


A Sentral Tata Suara :
1 Peralatan Utama
- 1,00 Unit 2000000 2000000
- 18,00 Unit 25000 450000
- 18,00 Unit 125000 2250000

SUB TOTAL PEKERJAAN TATA SUARA 4.700.000

3.G PEKERJAAN FIRE ALARM


A PERALATAN UTAMA
1 MCFA Kapasitas 10 zone semi addresible lengkap bell, lampu indikator ex 1,00 Unit 20000000 20000000
2 TBFA 1,00 unit 750000 750000

B Instalasi Lantai 1
1 Smoke&Heat Detector ex hooski, siemens, tyco 12,00 Buah 50000 600000
2 Manual Break glass 1,00 Buah 150000 150000
3 Alarm Bell 1,00 Buah 150000 150000
4 Lampu Indicator 1,00 Buah 50000 50000
5 Titik Instalasi Fire Alarm / Control Detector Kabel FRC 2x1,5 12,00 Titik 125000 1500000

C Instalasi Lantai 2
1 Smoke&Heat Detector ex hooski, siemens, tyco 17,00 Buah 50000 850000
2 Titik Instalasi Fire Alarm / Control Detector Kabel FRC 2x1,5 17,00 Buah 125000

D Instalasi Lantai 3
1 Smoke&Heat Detector ex hooski, siemens, tyco 17,00 Buah 50000 850000
2 Titik Instalasi Fire Alarm / Control Detector Kabel FRC 2x1,5 17,00 Buah 125000 2125000

SUB TOTAL PEKERJAAN FIRE ALARM 29.000.000

3.H PEKERJAAN MATV


A PERALATAN UTAMA
1 Antena UHF 1,00 Unit 600000 600000
2 Antena VHF 1,00 Unit 600000 600000
3 Terminal Box + Booster sinyal & P.supply 1,00 Unit 350000 350000
4 Spliter 4 way 1,00 Unit 85000 85000
5 Socket TV ( RCA ) 2,00 Unit 50000 100000
6 Titik Instalasi Socket MATV Coaxial 5C-2V 2,00 Unit 100000 200000

SUB TOTAL PEKERJAAN MATV 1.935.000

3.I PEKERJAAN CCTV

A SENTRAL CCTV :
1 Network Video Recorder 16 CH ex Hikvision, Dahua inc HDD 10 TB 1,00 Unit 3500000 3500000
2 IP Dome 2 mp Colour Camera Include Power supply ex Dahua, Hikvision 30,00 Unit 50000 1500000

4 21” Colour monitor & suport 1,00 Unit 300000 300000


5 Titik Instalasi CCTV ( Scurity System ) CAT 6 Inc Testing 14,00 Titik 200000 2800000

SUB TOTAL PEKERJAAN CCTV 8.100.000

X. PEKERJAAN INSTALSI TELEPHONE


A Sentral Telephone :
1 PABX, 6 / 16 Extention 1,00 Unit 3500000 3500000
2 Titik Instalasi Telephone ITC 2x2x0,6 mm2 1,00 titik 350000 350000

SUB TOTAL PEKERJAAN INSTALASI TELEPHONE 3.850.000


TOTAL PEKERJAAN MEKANIKAL & ELEKTRIKAL