0% found this document useful (0 votes)
55 views1 page

Precision group-OPTION 11

The document shows a proposed renovation layout for the third floor of a building. It includes moving the location of three cabins, adding a discussion room and workstations, and reconfiguring the packing room. The total occupancy of the renovated third floor would be 65 people.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

Precision group-OPTION 11

The document shows a proposed renovation layout for the third floor of a building. It includes moving the location of three cabins, adding a discussion room and workstations, and reconfiguring the packing room. The total occupancy of the renovated third floor would be 65 people.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

5'

1
3'-92"

TOILET

CABIN 1 CABIN 2 CABIN 3

DISCUSSION
ROOM
8'6"x7'1"

WORKSTATIONS
TOTAL OCCUPANCY :65

9'-7"

3'-7"
PACKING ROOM
6'-6"

PROJECT
PROPOSED RENOVATION LAYOUT - 3rd Floor - Option 1 DRAWING TITLE
PROPOSED RENOVATION + INTERIORS
RENOVATION LAYOUT FOR PRECISION GROUP
THIRD FLOOR AT T.NAGAR, CHENNAI
SCALE : NTS ORIENTATION

DATE : 7-JAN-2023

DRAWING NO : SC/R0
EMAIL: thedesignaccent@gmail.com

SHEET SIZE : A3 N PH:77085 00224


PH:82481 65726
NEHRU NAGAR, VELACHERY,
CHENNAI - 600 042

You might also like